A G WASSENAAR INC | Public Works | Chem. & lab. supplies | Asbestos Assessment | 11/2/2011 | $1,020.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Materials testing-sidewalks & | 11/17/2011 | $423.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Materials testing-sidewalks & | 11/17/2011 | $1,068.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | SEWER REPLACEMENT MATERIAL | 11/17/2011 | $1,695.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | SEWER REPLACEMENT MATERIAL | 11/17/2011 | $908.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | SEWER REPLACEMENT MATERIAL | 11/17/2011 | $908.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | SEWER REPLACEMENT MATERIAL | 11/17/2011 | $2,641.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | WATER LINE & VALVE REPLACEMEN | 11/22/2011 | $731.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | WATER LINE & VALVE REPLACEMEN | 11/22/2011 | $202.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | WATER LINE & VALVE REPLACEMEN | 11/22/2011 | $67.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | WATER LINE & VALVE REPLACEMEN | 11/22/2011 | $448.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | WATER LINE & VALVE REPLACEMEN | 11/22/2011 | $643.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Materials testing-sidewalks & | 1/25/2012 | $253.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Materials testing-sidewalks & | 3/1/2012 | $1,417.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Materials testing-sidewalks & | 3/1/2012 | $640.00 |
A G WASSENAAR INC | Public Works | Consulting | DEVELOPMENT MATERIALS | 4/11/2012 | $262.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Enginering & Material Testing | 5/31/2012 | $858.58 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Enginering & Material Testing | 5/31/2012 | $2,026.33 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Enginering & Material Testing | 5/31/2012 | $1,634.84 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | MATERIALS TESTING | 5/31/2012 | $525.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | MATERIALS TESTING | 5/31/2012 | $366.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | MATERIALS TESTING | 6/14/2012 | $571.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | MATERIALS TESTING | 6/28/2012 | $1,952.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | MATERIALS TESTING | 6/28/2012 | $2,512.00 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Crime Lab - Cleanup | 6/19/2013 | $6,513.61 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Crime Lab - Cleanup | 6/28/2013 | ($6,513.61) |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Asbestos Survey | 8/12/2013 | $432.60 |
A G WASSENAAR INC | Public Works | Contractor services | Shooting Range FEMA | 6/5/2014 | $3,112.50 |
A G WASSENAAR INC | Public Works | Contractor services | Shooting Range FEMA | 6/5/2014 | $8,733.40 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Other Improve | GMRC Pickleball Court Services | 6/10/2014 | $364.00 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Asbestos Specification | 7/16/2014 | $1,808.20 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Professional Service E1432.EAS | 8/27/2014 | $996.00 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Asbestos Sampling PD | 9/17/2014 | $423.55 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Soil/ Foundation Study | 9/17/2014 | $1,700.00 |
A G WASSENAAR INC | Community Resources | Construc Costs-Site Improve | 145952.CON EXCAVATION OBSERVE | 11/10/2014 | $350.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Other Improve | CONCRETE SAMPLING BCLP | 12/4/2014 | $4,703.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Other Improve | Mountair Park W 14th Ave Soils | 4/17/2015 | $796.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | BCLP Sidewalk and Bike Path | 8/18/2015 | $438.00 |
A G WASSENAAR INC | Community Resources | Repairs & maint - bldgs | Asbestos Abatement | 9/2/2015 | $3,428.70 |
A G WASSENAAR INC | Community Resources | Construc Costs-Site Improve | Plaza Reconstruction | 9/22/2015 | $137.00 |
A G WASSENAAR INC | Community Resources | Construc Costs-Site Improve | Plaza Reconstruction | 9/22/2015 | $296.50 |
A G WASSENAAR INC | Police | Repairs & maint - equipment | Absestos Test- N. Table Mtn. | 9/30/2015 | $1,068.15 |
A G WASSENAAR INC | Public Works | Consulting | QUALITY CONTROL TESTING AND | 10/7/2015 | $444.00 |
A G WASSENAAR INC | Public Works | Consulting | QUALITY CONTROL TESTING AND | 10/7/2015 | $568.00 |
A G WASSENAAR INC | Public Works | Consulting | QUALITY CONTROL TESTING AND | 10/7/2015 | $390.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Other Improve | Project 153735 Link Rec Center | 2/17/2016 | $814.00 |
A G WASSENAAR INC | Community Resources | Contractor services | 6801 W 1st Ave Survey & Test | 2/17/2016 | $3,196.80 |
A G WASSENAAR INC | Community Resources | Contractor services | 2015 2343 Routt St Survey | 2/17/2016 | $2,211.05 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 4/28/2016 | $249.00 |
A G WASSENAAR INC | Community Resources | Construc Costs-Site Improve | Concrete Sampling | 5/5/2016 | $1,053.50 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 5/12/2016 | $420.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 5/17/2016 | $249.50 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 5/26/2016 | $794.00 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 5/26/2016 | $1,158.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Quality Control Testing & | 6/8/2016 | $173.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 6/24/2016 | $307.00 |
A G WASSENAAR INC | Community Resources | Contractor services | concrete sampling | 7/6/2016 | $224.50 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 7/7/2016 | $679.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Quality Control Testing & | 7/7/2016 | $1,656.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Traffic Signa | Quality Control Testing & | 7/7/2016 | $2,403.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Quality Control Testing & | 7/7/2016 | $1,427.50 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Maint Shops - Asbestos Inspect | 7/15/2016 | $3,797.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 7/21/2016 | $351.00 |
A G WASSENAAR INC | Community Resources | Construc Costs-Site Improve | Crown Hill Park | 8/15/2016 | $268.50 |
A G WASSENAAR INC | Community Resources | Other property services | UP-Mold Evaluation | 8/17/2016 | $980.15 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 8/18/2016 | $169.50 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 8/18/2016 | $318.00 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 8/25/2016 | $124.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Site Improve | Quality Control Testing & | 9/14/2016 | $973.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Quality Control Testing & | 9/14/2016 | $469.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Quality Control Testing & | 9/14/2016 | $9,922.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 9/29/2016 | $665.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | FOUNDERS PARK | 10/14/2016 | $710.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 10/20/2016 | $391.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 10/26/2016 | $1,976.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 10/26/2016 | $88.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sidewalks | Quality Control Testing & | 11/3/2016 | $147.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Site Improve | Quality Control Testing & | 11/3/2016 | $327.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Site Improve | Quality Control Testing & | 11/3/2016 | $473.00 |
A G WASSENAAR INC | Community Resources | Construction Costs-Other Impro | Project 165658 WOhio$ SYarrow | 12/6/2016 | $871.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing per | 12/7/2016 | $1,525.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | 2016 Founder's Park | 1/4/2017 | $357.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | 2016 Founder's Park | 1/4/2017 | $3,488.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Pub Safety Center parking | 1/4/2017 | $325.50 |
A G WASSENAAR INC | Community Resources | Construction Costs-Other Impro | WEST OHIO AVE ENTRY | 1/23/2017 | $1,221.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | 2016 PSC Structural repairs | 1/26/2017 | $142.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC Parking Structure | 2/22/2017 | $120.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Link Rec Center | 2/22/2017 | $729.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Link Concrete | 4/5/2017 | $303.00 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Head Start Facil-Radon Testing | 4/13/2017 | $4,538.28 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | Quality Control Testing & | 4/27/2017 | $255.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | Quality Control Testing & | 4/27/2017 | $402.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Sutherland Shire Park | 5/10/2017 | $252.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Westboro Park | 5/10/2017 | $252.00 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 5/11/2017 | $829.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC Parking Stucture | 5/11/2017 | $648.00 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing - Streets | 6/7/2017 | $1,425.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | WESTBORO PARK | 6/14/2017 | $1,684.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | SUTHERLAND SHIRE PARK | 6/14/2017 | $1,319.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | 2017 SANITARY SEWER IMPRVMNTS | 6/15/2017 | $13,400.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC Parking Structure | 6/21/2017 | $642.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC Parking Structure | 6/21/2017 | $800.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Stormwtr Line | Quality Control Testing & | 7/6/2017 | $667.00 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | Quality Control Testing & | 7/6/2017 | $297.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Water Lines | Quality Control Testing & | 7/6/2017 | $420.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Field Technician | 7/11/2017 | $636.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | Field Technician | 7/11/2017 | $1,607.00 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Field Technician | 7/11/2017 | $1,610.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | LHC Auction Barn Walk | 7/13/2017 | $1,402.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC PAARKING STRUCTURE | 8/1/2017 | $838.00 |
A G WASSENAAR INC | Public Works | Other Charges-Sidewalks | Quality Control Testing & | 8/3/2017 | $559.00 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | WESTBORO PARK | 8/15/2017 | $610.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | SUTHERLAND SHIRE PARK | 8/15/2017 | $575.50 |
A G WASSENAAR INC | Public Works | Consulting Costs-Sewer Lines | Quality Control Testing & | 8/17/2017 | $420.50 |
A G WASSENAAR INC | Public Works | Consulting | Quality Control Testing & | 8/17/2017 | $207.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing - Streets | 8/17/2017 | $1,008.00 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | Caretaker's Cottage | 8/17/2017 | $313.00 |
A G WASSENAAR INC | Public Works | Other Charges-Traffic Signals | Quality Control Testing & | 8/24/2017 | $827.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC Parking Structure | 9/6/2017 | $623.50 |
A G WASSENAAR INC | Public Works | Other Charges-Sidewalks | Quality Control Testing & | 9/7/2017 | $221.50 |
A G WASSENAAR INC | Community Resources | Bldg Construction Costs | CARETAKER'S COTTAGE | 9/12/2017 | $676.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Site Improve | PSC PARKING STRUCTURE | 9/20/2017 | $251.00 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Radon testing Lasley & Devinne | 10/4/2017 | $3,400.00 |
A G WASSENAAR INC | Public Works | Other Charges-Sidewalks | PROF SERV FOR 1ST AVE SIDEWALK | 10/5/2017 | $4,317.50 |
A G WASSENAAR INC | Public Works | Other Charges-Sidewalks | PROF SERV FOR 1ST AVE SIDEWALK | 10/5/2017 | $6,056.00 |
A G WASSENAAR INC | Community Resources | Consulting services-Bldg Const | 1580 YARROW RESTROOM RENO | 10/23/2017 | $1,494.65 |
A G WASSENAAR INC | Public Works | Other Charges-Traffic Signals | TESTING AT 20TH & PIERCE | 10/24/2017 | $597.50 |
A G WASSENAAR INC | Community Resources | Consulting Costs-Other Improve | BCLP Campground Restroom | 10/25/2017 | $587.40 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing - Streets | 11/1/2017 | $261.50 |
A G WASSENAAR INC | Public Works | Consulting | MATERIALS TESTING | 11/1/2017 | $1,573.50 |
A G WASSENAAR INC | Planning | Consulting Costs-Other Improve | SUTHERLAND SHIRE PARK | 11/7/2017 | $1,617.00 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Concrete Sampling & Testing | 11/27/2017 | $129.50 |
A G WASSENAAR INC | Community Resources | Other profess & tech services | Concrete sampling & testing | 11/27/2017 | $427.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing - Streets | 11/29/2017 | $574.50 |
A G WASSENAAR INC | Public Works | Other Charges-Sidewalks | Quality Control Testing & | 11/30/2017 | $3,273.00 |
A G WASSENAAR INC | Public Works | Other Charges-Streets/Roadways | Quality Control Testing & | 11/30/2017 | $909.00 |
A G WASSENAAR INC | Planning | Consulting Costs-Other Improve | 172154 Sutherland Shire | 12/13/2017 | $2,413.50 |
A G WASSENAAR INC | Public Works | Construc Costs-Streets/Roadway | Concrete Testing - Streets | 12/19/2017 | $525.50 |