Community Resources | Bldg Construction Costs | DRW CONSTRUCTION INC | Green Mtn Rec - Excavating | | 1/14/2010 | $2,557.50 |
Community Resources | Bldg Construction Costs | DRW CONSTRUCTION INC | Increase for Add'l Work- Ok | | 1/14/2010 | $1,585.00 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Change Order #1- Add'l Work | | 1/14/2010 | $2,971.75 |
Community Resources | Bldg Construction Costs | OFFICESCAPES OF DENVER LLLP | Furniture design for CR | | 1/25/2010 | $2,362.50 |
Community Resources | Bldg Construction Costs | OFFICESCAPES OF DENVER LLLP | Inv 704172 pcd pd P Browning | | 1/25/2010 | ($455.63) |
Community Resources | Bldg Construction Costs | OFFICESCAPES OF DENVER LLLP | Inv 701151 pcd pd P Browning | | 1/25/2010 | ($1,485.00) |
Community Resources | Bldg Construction Costs | OFFICESCAPES OF DENVER LLLP | rel bal per BPeople 01-04-10 | | 1/25/2010 | ($421.87) |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Head Start W 11th Ave | | 1/27/2010 | $131,604.10 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Carm Racquetball Roof Repair | | 1/27/2010 | $7,941.59 |
Community Resources | Bldg Construction Costs | AQUATIC CHEMICAL SOLUTIONS INC | 2009 swimming pools compliance | | 1/28/2010 | $17,050.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Whitlock Carpet Install | | 2/5/2010 | $400.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Community Res - Office Remodel | | 2/5/2010 | $1,890.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Head Start Daycare Facility | | 2/11/2010 | $101,729.20 |
Community Resources | Bldg Construction Costs | INDOX SERVICES | Dwgs CAR HVAC upgrades | | 2/19/2010 | $136.20 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Child Care Fac-Conc | | 2/19/2010 | $729.00 |
Community Resources | Bldg Construction Costs | WEST METRO FIRE PROTECTIO | West Metro Plan Review Fee - C | | 2/19/2010 | $50.00 |
Community Resources | Bldg Construction Costs | BADGER METER INC | Irrigation flow sensor/transmi | | 2/19/2010 | $575.00 |
Community Resources | Bldg Construction Costs | ACIERNO-BOYER & CO LLC | Labor | | 3/3/2010 | $4,020.00 |
Community Resources | Bldg Construction Costs | ACIERNO-BOYER & CO LLC | Cambride Aviator 36oz. - | | 3/3/2010 | $14,253.73 |
Community Resources | Bldg Construction Costs | ACIERNO-BOYER & CO LLC | Freight | | 3/3/2010 | $398.75 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Architect Svc Head Start Bldg | | 3/11/2010 | $60,513.90 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility-Concrete S | | 3/18/2010 | $1,746.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Headstart Facility - Compactio | | 3/18/2010 | $603.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility - Pier Oab | | 3/18/2010 | $1,437.50 |
Community Resources | Bldg Construction Costs | COWBOY METAL PRODUCTS | CARMODY EQUIPT. WIREWAY | | 3/18/2010 | $1,215.00 |
Community Resources | Bldg Construction Costs | ACORN NATURALISTS-INTE | Animal Track Molds for Head St | | 3/18/2010 | $102.74 |
Community Resources | Bldg Construction Costs | ABE COPP COMPANY LLC | Carmody - Electrical for | | 3/25/2010 | $3,596.00 |
Community Resources | Bldg Construction Costs | ABE COPP COMPANY LLC | extra install mat. carmody | | 3/25/2010 | $361.13 |
Community Resources | Bldg Construction Costs | TERRA AUTOMATED SYSTEMS | Motorola Hardware Headstart | | 3/31/2010 | $4,414.60 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Arch. Svcs HeadStart Facility | | 4/15/2010 | $132,741.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start- Pid Screening/Asbe | | 4/21/2010 | $301.25 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start-Concrete Sampling | | 4/21/2010 | $1,418.00 |
Community Resources | Bldg Construction Costs | ELKHORN HEATING & AC | Repair Diner Bottle Cooler Tem | | 4/21/2010 | $521.22 |
Community Resources | Bldg Construction Costs | RECREONICS | Head Start Sandbox Tarp Anchor | | 4/21/2010 | $83.68 |
Community Resources | Bldg Construction Costs | QWEST RESOURCE ALLOCATION-BART | Headstart -Phone Cabling | | 4/29/2010 | $7,143.83 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Construction PreschoolFacility | | 5/6/2010 | $237,929.40 |
Community Resources | Bldg Construction Costs | THE ALARM MAN INC | Alarm System for Mark Star Cnt | | 5/13/2010 | $14,315.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility-Steel Obse | | 5/24/2010 | $700.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Heat Start Facility-Compaction | | 5/24/2010 | $794.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Heat Start Facility-Concrete S | | 5/24/2010 | $1,991.00 |
Community Resources | Bldg Construction Costs | FOOTHILLS LANDFILL | Dump Fees for PW to haul off u | | 5/24/2010 | $1,211.46 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Eng Svcs PreSchool Facility | | 6/3/2010 | $176,258.99 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | CWRC-recoat 2 racq courts | | 6/9/2010 | $1,210.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Clements-Coat dance floor | | 6/9/2010 | $1,210.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | CWRC-recoat 2 racq courts | | 6/15/2010 | ($1,210.00) |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Whitlock-re-coat 2 racq courts | | 6/15/2010 | $720.00 |
Community Resources | Bldg Construction Costs | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Head Start 6201 W 11th Ave | | 6/17/2010 | $4,294.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PO 189 PSC Glass replacement | | 6/17/2010 | $8,629.20 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Proposed Firehouse Bldg-Soil a | | 6/17/2010 | $1,600.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility-Compaction | | 6/17/2010 | $1,738.50 |
Community Resources | Bldg Construction Costs | WEST METRO FIRE PROTECTIO | Estes Motel plan review fee de | | 6/17/2010 | $50.00 |
Community Resources | Bldg Construction Costs | WEST METRO FIRE PROTECTIO | Estes Motel plan review balanc | | 6/17/2010 | $25.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | LADDER SHOP | | 6/17/2010 | $285.53 |
Community Resources | Bldg Construction Costs | CPS DISTRIBUTORS #18 | irrigation enclosure - Head St | | 6/17/2010 | $1,319.00 |
Community Resources | Bldg Construction Costs | INDOX SERVICES | Estes Motel Drawing Repro | | 6/17/2010 | $23.40 |
Community Resources | Bldg Construction Costs | TRIPLE M RECREATION LLC | Head Start Shade Structure | | 6/22/2010 | $4,798.00 |
Community Resources | Bldg Construction Costs | STAR PLAYGROUNDS | Head Start Playground Equip | | 6/24/2010 | $5,031.00 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | CWRC - Roof Repair & Leak | | 7/1/2010 | $3,220.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Architect Svc Presch Facility | | 7/15/2010 | $170,358.89 |
Community Resources | Bldg Construction Costs | MOUNTAIN HIGH TREE LAWN L | Head Start Child Facility- Rem | | 7/19/2010 | $2,200.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Child Facility-Comp | | 7/19/2010 | $1,297.75 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility-Concrete S | | 7/19/2010 | $326.00 |
Community Resources | Bldg Construction Costs | ERICK C JOHNSON | Artist Stipend/Aviation Park | | 7/21/2010 | $500.00 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | Artist Stipend/Aviation Park | | 7/21/2010 | $500.00 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | Artist Stipend/Aviation Park | | 7/21/2010 | $500.00 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | Artist Stipend/Aviation Park | | 7/21/2010 | $500.00 |
Community Resources | Bldg Construction Costs | THE ALARM MAN INC | Head Start-New Security System | | 7/22/2010 | $1,770.50 |
Community Resources | Bldg Construction Costs | TRIPLE M RECREATION LLC | Head Start Shade Structure | | 7/29/2010 | $2,443.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Child Care Facility | | 8/25/2010 | $1,823.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start Facility - Compacti | | 8/25/2010 | $1,695.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start - Steel Observation | | 8/25/2010 | $611.25 |
Community Resources | Bldg Construction Costs | PIPER COMMUNICATION | PO-273-Cabling for Head Start | | 8/25/2010 | $2,565.00 |
Community Resources | Bldg Construction Costs | LONG BUILDING TECHNOLOGIES INC | Building Automation System | | 9/10/2010 | $9,828.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 6 for addl work | | 9/14/2010 | $8,023.70 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & | | 9/23/2010 | $29,222.80 |
Community Resources | Bldg Construction Costs | STONEHOUSE SIGNS | Identification Sign - 11th Ave | | 9/23/2010 | $1,175.62 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start - Compaction Testin | | 9/23/2010 | $1,474.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Head Start - Compaction Testin | | 9/23/2010 | $236.00 |
Community Resources | Bldg Construction Costs | FOOTHILLS LANDFILL | July 2010 Dumping Fee's-CR | | 9/23/2010 | $2,585.40 |
Community Resources | Bldg Construction Costs | TARPS DIRECT | Head Start Sandbox Cover | | 9/23/2010 | $147.50 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Misc Materials Head Start Sand | | 9/23/2010 | $18.16 |
Community Resources | Bldg Construction Costs | ARKANSAS VALLEY SEED INC | Head Start Pond Seed | | 9/23/2010 | $3.40 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 9/30/2010 | $23,893.00 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 9/30/2010 | $21,650.15 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Acct # chg to H90315.54350 | | 10/7/2010 | $2,497.02 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 1 for addl work | | 10/7/2010 | $10,938.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 2 for addl work | | 10/7/2010 | $9,099.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 3 for addl work | | 10/7/2010 | $18,660.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 4 for addl work | | 10/7/2010 | $3,458.72 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Carmody-Racqquetball Ct Floors | | 10/12/2010 | $1,240.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Belmar Heritage Center - New W | | 10/18/2010 | $362.70 |
Community Resources | Bldg Construction Costs | IRON MOUNTAIN INDUSTRI | Head Start - Sign | | 10/18/2010 | $1,151.44 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & | | 10/21/2010 | $22,125.42 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | Airius Thermal Equalizer | | 10/21/2010 | $2,544.00 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 10/21/2010 | $10,080.90 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & | | 11/3/2010 | $10,485.78 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & Found | | 11/3/2010 | $521.91 |
Community Resources | Bldg Construction Costs | STANDARD FENCE COMPANY | Parking Deck - Install | | 11/18/2010 | $5,200.00 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | CO No. 2 for Add'l Work | | 11/18/2010 | $5,441.40 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & Found | | 11/29/2010 | $1,411.89 |
Community Resources | Bldg Construction Costs | BAR-NONE BUILDERS INC | Estes Motel Relocation & Found | | 11/29/2010 | $1,870.00 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Clements Ctr Roof Replacement | | 12/2/2010 | $78,880.50 |
Community Resources | Bldg Construction Costs | GOT METAL | AVIATION PARK STIPEND | | 12/8/2010 | $500.00 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 12/9/2010 | $3,268.95 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 12/9/2010 | $2,911.00 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 12/9/2010 | $604.60 |
Community Resources | Bldg Construction Costs | WEATHERSURE SYSTEMS INC | Parking Structure Repairs | | 12/9/2010 | $0.50 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 4 for addl work | | 12/20/2010 | $5,976.94 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 5 for addl work | | 12/20/2010 | $2,588.00 |
Community Resources | Bldg Construction Costs | GOLDEN TRIANGLE CONSTRUCTION INC | Change Order 6 for addl work | | 12/20/2010 | $422.30 |
Community Resources | Bldg Construction Costs | INDOX SERVICES | Peerless Bldg. Article 15 Plan | | 12/20/2010 | $11.55 |
Community Resources | Bldg Construction Costs | CEM SALES & SERVICE | Heater -Link Rec Pool | | 1/10/2011 | $16,548.00 |
Community Resources | Bldg Construction Costs | CEM SALES & SERVICE | Est Freight Heater for Pool | | 1/10/2011 | $400.00 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Clements Ctr Roof Replacement | | 1/13/2011 | $23,655.60 |
Community Resources | Bldg Construction Costs | CEM SALES & SERVICE | Removal & Install Heater Link | | 1/20/2011 | $3,000.00 |
Community Resources | Bldg Construction Costs | NCB LLC | Peerless Building Foundation | | 2/3/2011 | $17,228.01 |
Community Resources | Bldg Construction Costs | NCB LLC | Add'l Work - Change Order 1 | | 2/3/2011 | $2,505.00 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | 90 Occupancy Sensors for | | 2/17/2011 | $9,900.00 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | 90 Occupancy Sensors for | | 2/17/2011 | ($9,900.00) |
Community Resources | Bldg Construction Costs | INDOX SERVICES | 2010 Peerless Bldg. Art.15 Myl | | 2/18/2011 | $60.00 |
Community Resources | Bldg Construction Costs | HUDSON WELDING | Carmody Tunnel Steel Supports | | 2/23/2011 | $8,936.10 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | 90 Occupancy Sensors for | | 2/24/2011 | $9,350.00 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Clements Ctr Roof Replacement | | 3/16/2011 | $17,078.80 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | Replace Workroom Top | | 3/23/2011 | $1,448.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Window Shades for Police Confe | | 3/23/2011 | $1,837.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Peerless Tire - Pier Observati | | 3/23/2011 | $278.00 |
Community Resources | Bldg Construction Costs | SYX TIGERDIRECT.COM | AC Fan Kit For Security Comput | | 3/23/2011 | $92.43 |
Community Resources | Bldg Construction Costs | SYX TIGERDIRECT.COM | Computer Security Cabinet For | | 3/23/2011 | $125.63 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Clements Ctr Roof Replacement | | 4/7/2011 | $2,083.10 |
Community Resources | Bldg Construction Costs | SUPERIOR ROOFING INC | Clements Ctr Roof Replacement | | 4/7/2011 | $4,212.42 |
Community Resources | Bldg Construction Costs | KATHY'S DRAPERIES | Blinds - 6201 W 11th ave | | 4/7/2011 | $950.00 |
Community Resources | Bldg Construction Costs | KATHY'S DRAPERIES | Blinds - LCC | | 4/7/2011 | $398.30 |
Community Resources | Bldg Construction Costs | KATHY'S DRAPERIES | Blinds - Office CR | | 4/7/2011 | $839.80 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Peerless - Compaction testing | | 4/26/2011 | $202.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PD 6 windows tinted | | 4/26/2011 | $1,900.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Morse Park Pool Swim Bldg | | 4/28/2011 | $3,450.00 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | CR Hall Copy Area-Casework | | 5/6/2011 | $1,345.00 |
Community Resources | Bldg Construction Costs | FRONT RANGE PLUMBING CO INC | Glennon Pool - Emergency Repai | | 5/11/2011 | $2,767.20 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Commons - Paint Exterior | | 5/12/2011 | $8,302.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Justice Center - Tinting Windo | | 5/24/2011 | $1,900.00 |
Community Resources | Bldg Construction Costs | NATIONAL PLASTERERS COUNC | Pool Plasters Technical Manual | | 5/24/2011 | $103.50 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Retro Fit Kits | | 5/24/2011 | $927.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Lamps & Ballast | | 5/24/2011 | $1,193.48 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Shops - Lamps & Balast Convers | | 5/24/2011 | $752.98 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Traffic - Retro Kits | | 5/24/2011 | $1,483.20 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Shops - Ballast | | 5/24/2011 | $337.80 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Traffic - Light Fixtures | | 5/24/2011 | $260.82 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Civic Center South Carpet | | 5/25/2011 | $29,061.06 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Sundries Items | | 5/25/2011 | $4,303.30 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Civic Center South Carpet | | 5/25/2011 | $79,171.66 |
Community Resources | Bldg Construction Costs | ATLANTIS POOL PLASTERING INC | Morse Park Pool Resurfacing | | 5/25/2011 | $77,346.90 |
Community Resources | Bldg Construction Costs | OLDE ENGLISH MASONRY INC | remove/repair sign 1st/Pierce | | 6/2/2011 | $1,750.00 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Installation | | 6/8/2011 | $11,051.75 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Additional Labor | | 6/8/2011 | $19,251.75 |
Community Resources | Bldg Construction Costs | RM ENERGY | Carmody Pool - Airius Handlers | | 6/20/2011 | $6,948.00 |
Community Resources | Bldg Construction Costs | AMS OF COLORADO #9307 | Relocate Unit Heaters that are | | 6/20/2011 | $5,489.80 |
Community Resources | Bldg Construction Costs | MURPHY COMPANY MECHANICAL | Exhaust Fan & Hood - PO 1220 | | 6/20/2011 | $4,744.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PD - Tinting | | 6/20/2011 | $1,800.00 |
Community Resources | Bldg Construction Costs | CEM SALES & SERVICE | Link Heat Exchanger PO# 1212 | | 6/20/2011 | $6,801.00 |
Community Resources | Bldg Construction Costs | ATLANTIS POOL PLASTERING INC | Morse Park Pool Resurfacing | | 6/22/2011 | $1,497.10 |
Community Resources | Bldg Construction Costs | ATLANTIS POOL PLASTERING INC | Morse Park Pool Resurfacing | | 6/22/2011 | $7,097.00 |
Community Resources | Bldg Construction Costs | ENERGY SERVICES OF COLORADO INC | Carmody - Air Handling Unit | | 6/22/2011 | $5,998.50 |
Community Resources | Bldg Construction Costs | THE ALARM MAN INC | Carmody - Engineering Drawings | | 7/5/2011 | $675.00 |
Community Resources | Bldg Construction Costs | PEAK PLASTERING LLC | Link - Stucco Repair | | 7/11/2011 | $1,800.00 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Installation | | 7/13/2011 | $18,941.00 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Additional Labor | | 7/13/2011 | $10,771.65 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | Restore PO balance per maroha | | 7/14/2011 | $275.00 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | Occupancy sensors-ARRA | | 7/14/2011 | $4,675.00 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | CM 1872-389351 6/20/11 for | | 7/14/2011 | ($4,675.00) |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PD - Tinting Windows | | 7/27/2011 | $1,800.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PD - Tinting & Window Screens | | 7/27/2011 | $1,900.62 |
Community Resources | Bldg Construction Costs | RM ENERGY | Carmody - Thermal Equalizer | | 7/27/2011 | $6,947.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Window Clean Public Safety Cen | | 7/27/2011 | $9,987.50 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Window Clean Public Safety Cen | | 7/27/2011 | $9,987.50 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | Aviation Park- Stipend | | 8/4/2011 | $500.00 |
Community Resources | Bldg Construction Costs | ERICK C JOHNSON | Aviation Park- Stipend | | 8/4/2011 | $500.00 |
Community Resources | Bldg Construction Costs | ENERGY SERVICES OF COLORADO INC | Carmody - Air Handling Unit | | 8/4/2011 | $17,995.50 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | Aviation Park- Stipend | | 8/4/2011 | $500.00 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | Aviation Park- Stipend | | 8/4/2011 | $500.00 |
Community Resources | Bldg Construction Costs | GOT METAL | Aviation Park- Stipend | | 8/11/2011 | $500.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Daniels CC - Paint Exterior | | 8/18/2011 | $2,600.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Add'l Painting Aluminum sign | | 8/18/2011 | $850.00 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Installation | | 8/24/2011 | $26,813.75 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Additional Labor | | 8/24/2011 | $2,695.45 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Visitor Center - Carpet | | 8/24/2011 | $11,523.89 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Window Tint / City Attornies O | | 8/29/2011 | $1,680.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Public Safety Bldg Tinting Wi | | 8/29/2011 | $1,344.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Public Safety Center - Solar S | | 8/29/2011 | $210.00 |
Community Resources | Bldg Construction Costs | WEST METRO FIRE PROTECTIO | Fire Protection Review of City | | 8/29/2011 | $50.00 |
Community Resources | Bldg Construction Costs | WEST METRO FIRE PROTECTIO | Fire Protection Review of City | | 8/29/2011 | $32.50 |
Community Resources | Bldg Construction Costs | I-KOTA INC | 2011 Civic Center Parking | | 9/1/2011 | $33,229.39 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Visitor Center - Carpet | | 9/1/2011 | $7,729.13 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Visitor Center - Carpet add'l | | 9/1/2011 | $0.52 |
Community Resources | Bldg Construction Costs | C4I DESIGN GROUP INC | Carmody Phase I Struct. Design | | 9/7/2011 | $3,614.00 |
Community Resources | Bldg Construction Costs | C4I DESIGN GROUP INC | Carmody -Phase II Const. Doc's | | 9/7/2011 | $3,072.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PD - Tinting Windows | | 9/20/2011 | $1,680.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PSC - Tinting Windows | | 9/20/2011 | $1,680.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Commons - Plaza - Concrete Sam | | 10/11/2011 | $497.50 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PSC - Tinting of Window and Sc | | 10/11/2011 | $1,680.00 |
Community Resources | Bldg Construction Costs | DH PACE COMPANY INC | CMO-Wood Door | | 10/12/2011 | $702.00 |
Community Resources | Bldg Construction Costs | I-KOTA INC | 2011 Civic Center Parking | | 10/13/2011 | $1,483.91 |
Community Resources | Bldg Construction Costs | I-KOTA INC | 2011 Civic Center Parking | | 10/13/2011 | $2,208.25 |
Community Resources | Bldg Construction Costs | I-KOTA INC | 2011 Civic Center Parking | | 10/13/2011 | $7,665.00 |
Community Resources | Bldg Construction Costs | COLUMBINE TREE SERVICE | Carmody-Trees Transpalnated | | 10/17/2011 | $1,200.00 |
Community Resources | Bldg Construction Costs | FOOTHILLS ROOF SERVICES INC | Ohio Storage - Look at Roof | | 10/25/2011 | $180.00 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | ER Kitchenette per Proposal | | 11/10/2011 | $2,895.00 |
Community Resources | Bldg Construction Costs | ALAN REED | CMO - Remodel Weekend Work | | 11/15/2011 | $720.00 |
Community Resources | Bldg Construction Costs | ALAN REED | CMO Remodel | | 11/17/2011 | $3,150.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PSC - Tinting of Windows | | 11/17/2011 | $1,832.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Civic Center North - Exterior | | 11/17/2011 | $2,250.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Civic Center South - Exterior | | 11/17/2011 | $2,400.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Managers Office - Glass for Ne | | 11/17/2011 | $494.64 |
Community Resources | Bldg Construction Costs | DO NOT USE TURNING LEAF PAINTING LLC | Carmody - Painting of | | 11/22/2011 | $2,920.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | PD - Records, Thermal | | 12/1/2011 | $2,759.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | Link Pool - Thermal Equalizer | | 12/1/2011 | $3,919.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | Whitlock Entrance & Exercise | | 12/1/2011 | $8,165.00 |
Community Resources | Bldg Construction Costs | THE RMH GROUP, INC. | PD Storage Facility | | 12/7/2011 | $2,980.00 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | PSC - Window Tinting | | 12/19/2011 | $1,680.00 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | ER kichen Cabinets - Phase II | | 12/21/2011 | $3,595.00 |
Community Resources | Bldg Construction Costs | CARRON NET COMPANY | GMRC - Racquet/Volleyball Set, | | 12/31/2011 | $1,084.42 |
Community Resources | Bldg Construction Costs | FOOTHILLS ROOF SERVICES INC | 2011-Dec Roff Consulting | | 1/5/2012 | $270.00 |
Community Resources | Bldg Construction Costs | FOOTHILLS ROOF SERVICES INC | 2011-Wilbur Rogers Roof Consul | | 1/5/2012 | $135.00 |
Community Resources | Bldg Construction Costs | FOOTHILLS ROOF SERVICES INC | 2011-Wilbur Rogers Oct Consult | | 1/5/2012 | $540.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | Link Pool - Thermal Equalizer | | 1/12/2012 | $2,612.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | PD - Records, Thermal | | 1/12/2012 | $1,839.00 |
Community Resources | Bldg Construction Costs | RM ENERGY INC | Whitlock Entrance & Exercise | | 1/12/2012 | $5,443.00 |
Community Resources | Bldg Construction Costs | SPORTS UNLIMITED, INC. | GMRC Raquetball Courts | | 1/12/2012 | $30,200.00 |
Community Resources | Bldg Construction Costs | WHITNEY MECHANICAL CO INC | Greenhouse - 2 Modine Effinity | | 1/13/2012 | $12,150.00 |
Community Resources | Bldg Construction Costs | AMERICAN DEMOLITION, LLC | Carmody Racquetball Center | | 1/13/2012 | $12,995.00 |
Community Resources | Bldg Construction Costs | AMERICAN DEMOLITION, LLC | Carmody Racquetball Ctr Demo | | 1/13/2012 | $7,770.25 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Carpet - North Building | | 1/18/2012 | $80,559.48 |
Community Resources | Bldg Construction Costs | TANDUS US INC | Sundry Items | | 1/18/2012 | $2,299.40 |
Community Resources | Bldg Construction Costs | UNIQUE WOODWORKING INC | Cabinets PW Bldg Dept Breakrm | | 2/29/2012 | $2,357.00 |
Community Resources | Bldg Construction Costs | AMERICAN DEMOLITION, LLC | Carmody Racquetball Ctr Demo | | 3/22/2012 | $2,307.25 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Glennon Heights-Painting Pool | | 4/23/2012 | $2,400.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Purchase Order 1420 - Carpet & | | 4/24/2012 | $44,077.64 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Purchase Order 1420 - Carpet & | | 4/24/2012 | $43,677.16 |
Community Resources | Bldg Construction Costs | COLORADO CURB SCAPES | Replace Stone House Patio | | 4/26/2012 | $18,905.00 |
Community Resources | Bldg Construction Costs | COLORADO CURB SCAPES | C/O #1 Add'l work subslab | | 4/26/2012 | $860.00 |
Community Resources | Bldg Construction Costs | COMMON GROUND PRESERVATION, LLC | CR - Wall | | 5/9/2012 | $540.00 |
Community Resources | Bldg Construction Costs | COMMON GROUND PRESERVATION, LLC | Wall in Community Resources | | 5/10/2012 | $2,695.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | GmRC, Gym Light Fixtures | | 5/11/2012 | $2,000.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | GMRC, Pool-6 New Light Fixture | | 5/11/2012 | $1,000.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Glennon Heights-Painting Inter | | 5/16/2012 | $600.00 |
Community Resources | Bldg Construction Costs | BUILDING TECHNOLOGY SYSTEMS | GMRC-Replace Makeup Air Unit. | | 5/24/2012 | $19,025.00 |
Community Resources | Bldg Construction Costs | PG CONSTRUCTION SERVICES, INC. | Green Mountain Recreation Ctr | | 5/24/2012 | $20,468.35 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | GMRC Racquetball Courts 3&4 | | 5/31/2012 | $27,156.60 |
Community Resources | Bldg Construction Costs | PG CONSTRUCTION SERVICES, INC. | GMRC - Remove Mastic | | 6/1/2012 | $1,150.00 |
Community Resources | Bldg Construction Costs | PG CONSTRUCTION SERVICES, INC. | Green Mountain Recreation Ctr | | 6/13/2012 | $35,149.37 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Fox Hollow Maintenance Bldg | | 6/20/2012 | $12,600.00 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | Stipend For Year Loan | | 6/21/2012 | $500.00 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | Stipend For Year Loan | | 6/21/2012 | $500.00 |
Community Resources | Bldg Construction Costs | GOT METAL | Stipend For Year Loan | | 6/21/2012 | $500.00 |
Community Resources | Bldg Construction Costs | ERICK C JOHNSON | Stipend For Year Loan | | 6/21/2012 | $500.00 |
Community Resources | Bldg Construction Costs | BEACON COMMUNICATIONS | Set up workstation enrollment | | 6/26/2012 | $312.50 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | GMRC - Pool Door Overhaul rebu | | 6/26/2012 | $1,175.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Clements Ctr Carpet PO #2207 i | | 6/26/2012 | $37,944.84 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC Closure - Lamps & Ballast | | 6/26/2012 | $389.60 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | GMRC - Paint | | 6/26/2012 | $660.88 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | GMRC - Paint and Tools | | 6/26/2012 | $122.07 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | GMRC - Paint Bathrooms | | 6/26/2012 | $89.00 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | GMRC - Paint | | 6/26/2012 | $181.75 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Paint for CR Workout Room Remo | | 6/26/2012 | $173.26 |
Community Resources | Bldg Construction Costs | LOWES #01903 | GMRC - Shut Down , Module, Box | | 6/26/2012 | $31.21 |
Community Resources | Bldg Construction Costs | CONTI ELECTRIC, INC. | PD - New Compressor | | 6/28/2012 | $1,432.63 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | GMRC Racquetball Courts 3&4 | | 7/9/2012 | $3,017.40 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | GMRC Racquetball Courts 3&4 | | 7/9/2012 | $7,094.30 |
Community Resources | Bldg Construction Costs | GROUNDED TECHNOLOGIES, INC. | Automatic Transfer Switch - | | 7/9/2012 | $9,678.00 |
Community Resources | Bldg Construction Costs | TILEY ROOFING INC | Estes Motel Roof Replacement | | 7/9/2012 | $7,996.00 |
Community Resources | Bldg Construction Costs | PG CONSTRUCTION SERVICES, INC. | Green Mountain Recreation Ctr | | 7/9/2012 | $6,179.74 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | WITLOCK REC | | 7/18/2012 | $925.00 |
Community Resources | Bldg Construction Costs | SECURITY PLUMBING | GMRC - Remove and Replace Lavs | | 7/20/2012 | $2,888.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carpet Clements inv#2594577 | | 7/20/2012 | $40,278.62 |
Community Resources | Bldg Construction Costs | BELL TRANS | Transportation NFPA Seminar | | 7/20/2012 | $13.00 |
Community Resources | Bldg Construction Costs | FLEETWOOD MEDIA PROD | NFPA Seminar | | 7/20/2012 | $233.00 |
Community Resources | Bldg Construction Costs | MONTE CARLO ADV RESERVAT. | Hotel NFRA Seminar | | 7/20/2012 | $356.16 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | Stipend For Year Loan | | 8/2/2012 | $500.00 |
Community Resources | Bldg Construction Costs | CARNATION BUILDING SERVICE INC | 870 Parfet Crime Lab-Cleaning | | 8/8/2012 | $1,001.00 |
Community Resources | Bldg Construction Costs | THE ALARM MAN INC | 870 Parfet - Security System | | 8/8/2012 | $1,600.00 |
Community Resources | Bldg Construction Costs | GROUNDED TECHNOLOGIES, INC. | Automatic Transfer Switch - | | 8/9/2012 | $8,322.00 |
Community Resources | Bldg Construction Costs | HOMEDEPOT.COM | 870 Parfet - Door Chime | | 8/23/2012 | $57.92 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Clements Ctr - Added VCT to lo | | 8/23/2012 | $3,240.90 |
Community Resources | Bldg Construction Costs | FASTSIGNS OF LAKEWOOD | 870 Parfet Crime Lab - Picked | | 8/23/2012 | $96.23 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | 870 Parfet - Crime Lab Flex Co | | 8/23/2012 | $172.87 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Crime - 870 Parfet - Electrica | | 8/23/2012 | $652.90 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | 870 Parfet Crime Lab - Breaker | | 8/23/2012 | $110.64 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | 870 Parfet Crime Lab - Cable, | | 8/23/2012 | $656.31 |
Community Resources | Bldg Construction Costs | PENNY ENTERPRISES | Carmody - Patches on Barrel Ro | | 8/28/2012 | $3,580.00 |
Community Resources | Bldg Construction Costs | COLORADO CURB SCAPES | Stonehouse - Wash Reseal Patio | | 8/30/2012 | $800.00 |
Community Resources | Bldg Construction Costs | THE RMH GROUP, INC. | PD-Crime Lab Survey | | 9/5/2012 | $1,120.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | WH - Re-Coat Wood Floors | | 9/6/2012 | $1,871.00 |
Community Resources | Bldg Construction Costs | MURPHY COMPANY MECHANICAL | PSC West Compressor Conversion | | 9/18/2012 | $660.48 |
Community Resources | Bldg Construction Costs | LAKEWOOD PLUMBING LLC | Carmody - Replace Swimming | | 9/26/2012 | $20,822.00 |
Community Resources | Bldg Construction Costs | LAKEWOOD PLUMBING LLC | Carmody - Replc Water Line | | 9/26/2012 | $1,510.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Sept - Moisture Test | | 10/3/2012 | $150.00 |
Community Resources | Bldg Construction Costs | PROCESS EQUIPMENT CORPORATION | Link - Handrail | | 10/4/2012 | $2,207.24 |
Community Resources | Bldg Construction Costs | MANION CONSTRUCTION INC | Civic Center Parking Structure | | 10/10/2012 | $8,552.52 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Carmody - Shut Down | | 10/11/2012 | $3,100.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Link - Shut down | | 10/11/2012 | $2,025.00 |
Community Resources | Bldg Construction Costs | SECURITY PLUMBING | UP Greenhouse - Water Heater P | | 10/22/2012 | $6,175.00 |
Community Resources | Bldg Construction Costs | MURPHY COMPANY MECHANICAL | ARRA Funds PSC- Replaced Compr | | 10/22/2012 | $2,444.26 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Paint for Finance Counter Repl | | 10/22/2012 | $75.54 |
Community Resources | Bldg Construction Costs | MANION CONSTRUCTION INC | Civic Center Parking Structure | | 10/30/2012 | $13,279.59 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | Carmody West Facade Translucnt | | 11/14/2012 | $24,850.00 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | Carmody West Facade Translucnt | | 11/14/2012 | $3,325.02 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab - Airborne Particula | | 11/26/2012 | $11,494.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Link-Handrail | | 11/28/2012 | $1,200.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Finance-Build Security Wall | | 12/3/2012 | $300.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Finance-Repair Carpet | | 12/5/2012 | $350.00 |
Community Resources | Bldg Construction Costs | ABE COPP COMPANY LLC | BCLP - Cabin C Electrical | | 12/6/2012 | $345.00 |
Community Resources | Bldg Construction Costs | ABE COPP COMPANY LLC | BCLP-Cabin B Electrical | | 12/6/2012 | $345.00 |
Community Resources | Bldg Construction Costs | ABE COPP COMPANY LLC | BCLP-Cabin A Electrical | | 12/6/2012 | $345.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Print Ship E-Vac Door | | 12/10/2012 | $300.00 |
Community Resources | Bldg Construction Costs | ALAN REED | CR West Kitchen Remodel | | 12/10/2012 | $1,228.00 |
Community Resources | Bldg Construction Costs | DVH COMPANY INC | Finance-Wall Talker | | 12/12/2012 | $670.00 |
Community Resources | Bldg Construction Costs | MANION CONSTRUCTION INC | Civic Center Parking Structure | | 12/12/2012 | $6,127.72 |
Community Resources | Bldg Construction Costs | CALAHAN CONSTRUCTION SERVICES | Carmody West Facade Translucnt | | 12/12/2012 | $1,482.75 |
Community Resources | Bldg Construction Costs | UNIQUE WOODWORKING INC | Finance Front Desk Re-Build | | 12/12/2012 | $13,890.00 |
Community Resources | Bldg Construction Costs | UNIQUE WOODWORKING INC | Fin Front Desk Rebuild - add'l | | 12/12/2012 | $668.00 |
Community Resources | Bldg Construction Costs | DONALD A MILLER | Homestead Club House & | | 12/12/2012 | $9,000.00 |
Community Resources | Bldg Construction Costs | DONALD A MILLER | Homestead painting -change | | 12/12/2012 | $300.49 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | Homestead Doors - Paint | | 12/18/2012 | $71.78 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Crim Lab 870 Parfet - Ceiling | | 12/18/2012 | $33.65 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Finance - New Desk - Plywood, | | 12/18/2012 | $205.84 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Finance Desk Remodel- Security | | 12/18/2012 | $9.94 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | PD - Crime Lab - Airborne Part | | 12/18/2012 | $1,035.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | LCC - Theater Demo & Install | | 12/19/2012 | $1,215.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | CR - Kitchen Floor | | 1/4/2013 | $626.56 |
Community Resources | Bldg Construction Costs | MANION CONSTRUCTION INC | Civic Center Parking Structure | | 1/10/2013 | $436.32 |
Community Resources | Bldg Construction Costs | MANION CONSTRUCTION INC | CO #1 Add'l Work | | 1/10/2013 | $1,035.25 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Door Stop For South Bldg. Reno | | 1/18/2013 | $4.21 |
Community Resources | Bldg Construction Costs | DHPACE/ANKMAR-DENVER | Doors & Hardware For South Bld | | 1/18/2013 | $2,150.00 |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS, INC. | CR - moving of offices | | 1/25/2013 | $1,992.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | PD-Patch & Paint Wall | | 1/25/2013 | $100.00 |
Community Resources | Bldg Construction Costs | THE ALARM MAN INC | 870 Parfet - Fire Alarm System | | 2/5/2013 | $15,000.00 |
Community Resources | Bldg Construction Costs | COLORADO ELECTRIC AND POWER SYSTEMS | Fleet Maint - Electrical Gear | | 2/5/2013 | $12,000.00 |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS, INC. | CR-Install furniture | | 2/11/2013 | $145.00 |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS, INC. | PD-Crime Lab-Removal Furniture | | 2/11/2013 | $480.00 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | CR - Paint Offices | | 2/21/2013 | $377.70 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | CR - Paint Offices | | 2/21/2013 | $42.76 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | CR - Paint Offices | | 2/21/2013 | $170.07 |
Community Resources | Bldg Construction Costs | COZY WINTERS | Hi/Lo/Off Dual Heat Switch for | | 2/21/2013 | $279.00 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Civic Center CR - Paint | | 3/13/2013 | $75.54 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | Civic Center CR - Paint | | 3/13/2013 | $32.35 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | Shop - Stain | | 3/13/2013 | $11.96 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Wilbur Rogers - Paint | | 3/13/2013 | $293.56 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | Wilbur Rogers - Tape | | 3/13/2013 | $46.47 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | IT - Paint Conf Room | | 3/13/2013 | $254.61 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Credit for invoice 6349 | | 3/13/2013 | ($17.76) |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Credit for invoice 46-53-5 (re | | 3/13/2013 | ($63.48) |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Metal Shims For Leveling New F | | 3/13/2013 | $10.66 |
Community Resources | Bldg Construction Costs | SEARS ROEBUCK 1071 | Clerk's Kitchen Remodel- Dishw | | 3/13/2013 | $16.10 |
Community Resources | Bldg Construction Costs | SEARS ROEBUCK 1071 | Clerk's Kitchen Remodel-Dishwa | | 3/13/2013 | $1,021.25 |
Community Resources | Bldg Construction Costs | RSD 72 | PSC- oil for compressor repla | | 3/13/2013 | $703.16 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab PSC- Asbestas Survey | | 3/13/2013 | $2,675.60 |
Community Resources | Bldg Construction Costs | JIM BLACK CONSTRUCTION | Crime Lab - PSC - Asbestos Tes | | 3/13/2013 | $475.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carpet -WRC -inv#2671818 PO #2 | | 3/13/2013 | $18,735.57 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | City Clerk - Kitchen Casework | | 4/8/2013 | $3,939.00 |
Community Resources | Bldg Construction Costs | COLORADO ELECTRIC AND POWER SYSTEMS | Fleet Maint - Electrical Gear | | 4/10/2013 | $9,150.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | City Clerk - VCT Floor | | 4/11/2013 | $315.00 |
Community Resources | Bldg Construction Costs | ALAN REED | City Clerk-Kitchen Remodel | | 4/11/2013 | $325.00 |
Community Resources | Bldg Construction Costs | COLORADO ELECTRIC AND POWER SYSTEMS | Addendum #1 - add'l Xcel and | | 4/16/2013 | $1,000.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Wilbur Rogers Center - Carpet | | 4/16/2013 | $27,970.61 |
Community Resources | Bldg Construction Costs | SEARS ROEBUCK 1071 | Clerk's Kitchen Remodel- Dishw | | 4/16/2013 | ($71.26) |
Community Resources | Bldg Construction Costs | SEARS ROEBUCK 1071 | Clerk's Kitchen Remodel- Dishw | | 4/16/2013 | ($1.11) |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Wilbur - Asbestos Survey | | 4/16/2013 | $854.75 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab - Asbestos Survey | | 4/16/2013 | $2,481.00 |
Community Resources | Bldg Construction Costs | MURPHY COMPANY MECHANICAL | PD - Crime Lab | | 4/16/2013 | $364.00 |
Community Resources | Bldg Construction Costs | AM SIGNAL INC | Shop - Lights for Gas Pump | | 4/16/2013 | $3,416.00 |
Community Resources | Bldg Construction Costs | JIM BLACK CONSTRUCTION INC | PSC-Crime Lab | | 4/17/2013 | $13,203.34 |
Community Resources | Bldg Construction Costs | JIM BLACK CONSTRUCTION INC | Add'l Work CO #1 | | 4/17/2013 | $5,846.51 |
Community Resources | Bldg Construction Costs | CHARLES D JONES/DENVER | Carmody - Pool Boiler | | 5/21/2013 | $1,955.46 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | CMO East - Window in Door | | 5/21/2013 | $1,426.00 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Wilbur Rogers - Paint | | 5/21/2013 | $70.33 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Wilbur Rogers - Paint | | 5/21/2013 | $81.57 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Wilbur Rogers - Paint | | 5/21/2013 | $129.96 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Wilbur Rogers - Paint | | 5/21/2013 | $231.30 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | City Clerk's Kitchen Construct | | 5/21/2013 | $11.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | GMRC-Racq & Aerob re-coat floo | | 5/28/2013 | $2,237.00 |
Community Resources | Bldg Construction Costs | DO NOT USE TURNING LEAF PAINTING LLC | GMRC-Painting Shut Down | | 5/31/2013 | $995.00 |
Community Resources | Bldg Construction Costs | REFRIGERATION SUPPLIES DISTRIBUTOR | Compressor Per Quote 72012727- | | 6/4/2013 | $30.51 |
Community Resources | Bldg Construction Costs | REFRIGERATION SUPPLIES DISTRIBUTOR | Compressor Per Quote 72012727- | | 6/4/2013 | $10,198.85 |
Community Resources | Bldg Construction Costs | REFRIGERATION SUPPLIES DISTRIBUTOR | Compressor Per Quote 72012727- | | 6/4/2013 | $1,714.11 |
Community Resources | Bldg Construction Costs | D&D MONARCH SHEET METAL, INC. | Roof Repairs -Urban Parks Shop | | 6/18/2013 | $21,883.50 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab - Cleanup | | 6/19/2013 | $6,513.61 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT LIGHTING INC | CWRC-Closure Lighting | | 6/24/2013 | $905.34 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | GMRC - shut down, fittings | | 6/25/2013 | $17.50 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | GMRC - SHUT DOWN, TVC, Couplin | | 6/25/2013 | $233.83 |
Community Resources | Bldg Construction Costs | LOWES #01903 | GMRC - 18 packages of 3/4 inch | | 6/25/2013 | $35.46 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | CMO east office remodel 2- 3 g | | 6/25/2013 | $267.98 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | GMRC- 20 for new pool fixtures | | 6/25/2013 | $92.50 |
Community Resources | Bldg Construction Costs | WATER SYSTEMS INC | LINK & 11th Ave (descaler kit) | | 6/25/2013 | $144.83 |
Community Resources | Bldg Construction Costs | WATER SYSTEMS INC | LINK (parts for drinking fount | | 6/25/2013 | $79.08 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PD Basement Carpet PO #3131 | | 6/25/2013 | $87,100.44 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC RECEPTICALS | | 6/25/2013 | $57.62 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LIGHT FIXTURE PARTS | | 6/25/2013 | $245.34 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LIGHT FIXTURES | | 6/25/2013 | $389.80 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | CMO EAST WHIPS | | 6/25/2013 | $88.44 |
Community Resources | Bldg Construction Costs | RUUD LIGHTING INC | GMRC LIGHT FIXTURES POOL | | 6/25/2013 | $1,890.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | LINK FLOOR TAPE & CONTROL SWIT | | 6/25/2013 | $446.71 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | GMRC CONDUIT | | 6/25/2013 | $98.36 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LAMPS | | 6/25/2013 | $249.12 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LIGHT FIXTURES POOL | | 6/25/2013 | $597.35 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LAMPS & BALLASTS | | 6/25/2013 | $493.46 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC POOL LIGHTING | | 6/25/2013 | $781.00 |
Community Resources | Bldg Construction Costs | ROBINSON STEEL COMPANY IN | LINK BENCH BACKS | | 6/25/2013 | $705.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LAMPS | | 6/25/2013 | $124.56 |
Community Resources | Bldg Construction Costs | DEN-COL SUPPLY | LINK- 1x6 plate/ gloves/templa | | 6/25/2013 | $151.46 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | LINK/ROSS ssbolts/ paint | | 6/25/2013 | $76.85 |
Community Resources | Bldg Construction Costs | FRONTIER BOLT INC | LINK -ssbolts /benches | | 6/25/2013 | $60.00 |
Community Resources | Bldg Construction Costs | FRONTIER BOLT INC | LINK- ssbolts/ benches | | 6/25/2013 | $61.25 |
Community Resources | Bldg Construction Costs | B-D COMPANY | LINK -ship | | 6/25/2013 | $89.48 |
Community Resources | Bldg Construction Costs | TOOLS AND EQUIPMENTS | ED remodel, hole-saw, drill bi | | 6/25/2013 | $133.85 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | Link shutdown - wire,phase tap | | 6/25/2013 | $277.57 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT-PAY TR | GMRC shutdown -, racq.-ball ba | | 6/25/2013 | $185.46 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab - Cleanup | | 6/28/2013 | ($6,513.61) |
Community Resources | Bldg Construction Costs | CONTI ELECTRIC, INC. | PD - Wiring for Compressor | | 7/2/2013 | $750.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Link-Pirate Ship, grout, paint | | 7/2/2013 | $2,600.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | CMO-East Paint Walls | | 7/2/2013 | $2,055.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Link-Paint Lobby | | 7/2/2013 | $750.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | CWRC - Paint lobby, Locker roo | | 7/2/2013 | $741.00 |
Community Resources | Bldg Construction Costs | ERICK C JOHNSON | AVIATION PARK STIPEND | | 7/2/2013 | $500.00 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | AVIATION PARK STIPEND | | 7/2/2013 | $500.00 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | AVIATION PARK STIPEND | | 7/2/2013 | $500.00 |
Community Resources | Bldg Construction Costs | GOT METAL | AVIATION PARK STIPEND | | 7/2/2013 | $500.00 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | AVIATION PARK STIPEND | | 7/10/2013 | $500.00 |
Community Resources | Bldg Construction Costs | BEACON COMMUNICATIONS | CMO-East & CR Install KP Acces | | 7/18/2013 | $3,772.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Crime Lab Cleanup/Asbestos Sur | | 7/18/2013 | $6,513.61 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | CMO- East - Door Closure | | 7/18/2013 | $470.00 |
Community Resources | Bldg Construction Costs | MURPHY COMPANY MECHANICAL | PSC - Assist with Installing o | | 7/18/2013 | $821.00 |
Community Resources | Bldg Construction Costs | LOWES #01903 | whitlock -shut down head lamps | | 7/18/2013 | $144.78 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock- shut down cord conn. | | 7/18/2013 | $32.25 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | whitlock -shut down outlets an | | 7/18/2013 | $208.12 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitloch - shut down cover pla | | 7/18/2013 | $22.87 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CWRC Shut down - 7-3/4 inch L | | 7/18/2013 | $13.79 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | CWRC shut down - 18- 4 sq ind | | 7/18/2013 | $20.70 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CWRC shut down - 17-3/4 inch L | | 7/18/2013 | $33.49 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PD Basement Carpet PO #3131 | | 7/18/2013 | $38,065.20 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PD Basement Carpet PO #3131 | | 7/18/2013 | $35,401.35 |
Community Resources | Bldg Construction Costs | RSD 72 | Emergency Repairs A/C PSC - in | | 7/18/2013 | $8,346.72 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURE PARTS- Closur | | 7/18/2013 | $1,216.20 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURE OUTLETS - Clo | | 7/18/2013 | $105.68 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURE PARTS - Closu | | 7/18/2013 | $427.68 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK LIGHT FIXTURES- Closu | | 7/18/2013 | $961.44 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK Closure& SHOP ROOF JA | | 7/18/2013 | $767.40 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURES PARTS- Closu | | 7/18/2013 | $427.68 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK LIGHT FIXTURES - Clos | | 7/18/2013 | $961.44 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURE PARTS - Closu | | 7/18/2013 | $979.02 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK Closure & SHOP CORD | | 7/18/2013 | $216.09 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK FIXTURE PARTS - Closu | | 7/18/2013 | $247.20 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK EM LIGHTS- Closure | | 7/18/2013 | $1,258.18 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK EM LIGHTS - Closure | | 7/18/2013 | $571.90 |
Community Resources | Bldg Construction Costs | FRONTIER BOLT INC | CWRC closure-pull up bar | | 7/18/2013 | $58.42 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CWRC closure-pull up bar | | 7/18/2013 | $35.65 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | PSC - police property refg. ci | | 7/18/2013 | $732.91 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | PSC - police property refig ci | | 7/18/2013 | $12.90 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | PSC - police property refig ci | | 7/18/2013 | $224.70 |
Community Resources | Bldg Construction Costs | 1872 CED | PSC - hvac repair, emercency | | 7/18/2013 | $325.88 |
Community Resources | Bldg Construction Costs | 1872 CED | PSC - justice center hvac repa | | 7/18/2013 | $1,000.00 |
Community Resources | Bldg Construction Costs | 1872 CED | PSC - juctice center hvac repa | | 7/18/2013 | $1,003.63 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | disconect for emergency reapai | | 7/18/2013 | $488.50 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | PSC - fuses, hvac repair emerg | | 7/18/2013 | $277.47 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Clements - 2 offices paint | | 8/6/2013 | $757.00 |
Community Resources | Bldg Construction Costs | D&D MONARCH SHEET METAL, INC. | Roof Repairs -Urban Parks Shop | | 8/8/2013 | $2,431.50 |
Community Resources | Bldg Construction Costs | TRENDWAY CORPORATION | Wall Partitions PO #3127 | | 8/15/2013 | $6,093.92 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | CWRC - Closure Resurface concr | | 8/15/2013 | $4,764.94 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | WH-Painting closure | | 8/28/2013 | $875.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Carmody - Closure painting | | 9/4/2013 | $3,992.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Carmody - Aerobics Floors | | 9/6/2013 | $558.00 |
Community Resources | Bldg Construction Costs | ZICK CONSTRUCTION LLC | Devinny Cottages - Gutters | | 9/12/2013 | $5,845.34 |
Community Resources | Bldg Construction Costs | TRENDWAY CORPORATION | Wall Partitions inv# 2876273 f | | 9/23/2013 | $6,093.91 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | CARMODY- BALLASTS | | 9/23/2013 | $393.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | CARMODY- LAMPS | | 9/23/2013 | $409.60 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WH - Lights | | 9/23/2013 | $321.72 |
Community Resources | Bldg Construction Costs | COWBOY METAL PRODUCTS | WH - 16 Gage Steel | | 9/23/2013 | $145.68 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | WH - Belt Sanding Paper, Inker | | 9/23/2013 | $138.66 |
Community Resources | Bldg Construction Costs | DEN-COL SUPPLY | WH-Anchor Cement | | 9/23/2013 | $39.00 |
Community Resources | Bldg Construction Costs | LOWES #01903 | Carmody - Canopy, Plywood | | 9/23/2013 | $66.95 |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS | Civic Center - Tearing down an | | 9/23/2013 | $1,990.00 |
Community Resources | Bldg Construction Costs | AM SIGNAL INC | WH - Closure Exterior Light | | 9/23/2013 | $159.00 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Devinny - Paint & Primer | | 9/23/2013 | $27.22 |
Community Resources | Bldg Construction Costs | 1872 CED | Carmody shut down- stripped ma | | 9/23/2013 | $164.28 |
Community Resources | Bldg Construction Costs | KWAL PAINT #55 | Devinny - Yellow Paint for Ste | | 9/23/2013 | $51.86 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | Devinny - Spray Paint | | 9/23/2013 | $15.54 |
Community Resources | Bldg Construction Costs | QED ELECTRIC DENVER | Carmody shut down to back feed | | 9/23/2013 | $33.63 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Devinney - Exterior Painting | | 10/2/2013 | $1,300.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Devinney - Exterior Painting | | 10/2/2013 | $2,540.00 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT-PAY TR | carmody -shutdown lamps and ba | | 10/22/2013 | $701.93 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | WH - Flooring for Office | | 10/22/2013 | $548.57 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | City Commons - PO 3264- LED Wr | | 10/22/2013 | $5,515.52 |
Community Resources | Bldg Construction Costs | LAKEWOOD PLUMBING, LLC | Civic Center-Camera, Locate | | 10/30/2013 | $875.00 |
Community Resources | Bldg Construction Costs | ARC THRIFT STORES | Citywide Cleanup Services | | 11/14/2013 | $42,000.00 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | Mailroom Jamb & Casing | | 11/25/2013 | $1,794.00 |
Community Resources | Bldg Construction Costs | XCEL ENERGY | 847 S Yarrow - New Gas Service | | 12/10/2013 | $1,945.96 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Civic Center Extra Base | | 12/10/2013 | $639.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Ceiling tile & grid in Mailrm | | 12/11/2013 | $110.00 |
Community Resources | Bldg Construction Costs | SILO WORKSHOP LLC | Collection Survey and Report | | 1/14/2014 | $4,420.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | Clements Front Desk - | | 1/22/2014 | $3,000.00 |
Community Resources | Bldg Construction Costs | WALRATH MECHANICAL COMPANY | BCLP Visitors Ctr HVAC Install | | 1/23/2014 | $11,600.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Clement Ctr Remodel/Demolition | | 1/23/2014 | $2,230.00 |
Community Resources | Bldg Construction Costs | RNF CONSULTANTS INC | Job No. 4371.0 | | 1/29/2014 | $288.75 |
Community Resources | Bldg Construction Costs | SILO WORKSHOP LLC | 2013 CONSERVATION/MAINTENANCE | | 2/4/2014 | $4,420.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Clements Ctr Soffits | | 2/4/2014 | $2,311.00 |
Community Resources | Bldg Construction Costs | THE BOULDER PLASTER & STUCCO CO INC | Estes Motel Plaster Repair | | 2/13/2014 | $3,141.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Clements Ctr Framing | | 2/13/2014 | $2,240.00 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | JAN 2014 CHGS PO#4570 | | 2/18/2014 | $2,933.25 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | Clements - Front Desk | | 2/19/2014 | $14,695.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | Clements Front Desk - | | 2/19/2014 | $7,000.00 |
Community Resources | Bldg Construction Costs | PACE DOOR SERVICES | Planning & Construction Door | | 2/24/2014 | $538.00 |
Community Resources | Bldg Construction Costs | HERCULES IND DENVER | Clements/ ductwork for remodel | | 2/24/2014 | $1,520.49 |
Community Resources | Bldg Construction Costs | AIR PURIFICATION CO | Clements/ registers for remode | | 2/24/2014 | $707.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Clements Ctr Prep and Painting | | 2/25/2014 | $4,064.00 |
Community Resources | Bldg Construction Costs | THE BOULDER PLASTER & STUCCO CO INC | Estes Motel Plaster Repair | | 2/26/2014 | $4,188.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Clements Ctr Drywall Install | | 2/26/2014 | $2,404.00 |
Community Resources | Bldg Construction Costs | DENVER FINE CABINETRY INC | Clements Center Granite Tops | | 2/27/2014 | $4,041.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | Add'l work per change order #1 | | 3/6/2014 | $1,500.00 |
Community Resources | Bldg Construction Costs | RNF CONSULTANTS INC | Clements Center Brick Removal | | 3/6/2014 | $651.25 |
Community Resources | Bldg Construction Costs | ALAN REED | Clements Center Drywall Finish | | 3/6/2014 | $2,300.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Clements Community Center | | 3/10/2014 | $2,160.00 |
Community Resources | Bldg Construction Costs | KENNY ELECTRIC SERVICE, INC | 1060 Quail St Switch Gear | | 3/12/2014 | $8,083.00 |
Community Resources | Bldg Construction Costs | KENNY ELECTRIC SERVICE, INC | Add'l Manpower for Project | | 3/12/2014 | $1,917.00 |
Community Resources | Bldg Construction Costs | ALAN REED | Clements - Finish Work | | 3/12/2014 | $2,632.50 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO GLASS | Carmody - Front Exterior Doors | | 3/18/2014 | $8,196.50 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | Interior Design, Architecture | | 3/18/2014 | $977.75 |
Community Resources | Bldg Construction Costs | THE BOULDER PLASTER & STUCCO CO INC | Estes Motel Plaster Repair | | 3/18/2014 | $3,141.00 |
Community Resources | Bldg Construction Costs | BARBIZON LIGHT OF THE ROC | LCC LIGHTING / C LAMPS | | 3/21/2014 | $9,771.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carpet - PSC portion of 1st fl | | 3/21/2014 | $50,197.37 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Construction | | 3/21/2014 | $34.31 |
Community Resources | Bldg Construction Costs | WAGNER INTERIOR SUPPLY OF | Clements Remodel- Drywall Supp | | 3/21/2014 | $65.95 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Emergency Li | | 3/21/2014 | $60.62 |
Community Resources | Bldg Construction Costs | WAGNER INTERIOR SUPPLY OF | Clements Remodel- Drywall | | 3/21/2014 | $86.94 |
Community Resources | Bldg Construction Costs | ROCKY MOUNTAIN INSULATION CORPORATION | Estes Motel Remodel- Insulatio | | 3/21/2014 | $1,509.96 |
Community Resources | Bldg Construction Costs | TAYLORS RENTAL CTR INC | Clements Remodel- Drywall Cons | | 3/21/2014 | $30.00 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Wire Whips F | | 3/21/2014 | $273.35 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Drywall Meta | | 3/21/2014 | $131.82 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN LOCK & SECU | Clements Remodel- Door Hardwar | | 3/21/2014 | $7.37 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Heaters For | | 3/21/2014 | $421.26 |
Community Resources | Bldg Construction Costs | HILTI INC | Clements Remodel- Tax Refund | | 3/21/2014 | ($8.53) |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Drywall Supp | | 3/21/2014 | $12.98 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Drywall Supp | | 3/21/2014 | $7.54 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Refund, Wire | | 3/21/2014 | ($530.51) |
Community Resources | Bldg Construction Costs | PACE DOOR SERVICES | Clements Remodel- New Doors & | | 3/21/2014 | $2,260.00 |
Community Resources | Bldg Construction Costs | PACE DOOR SERVICES | Clements Remodel- New Doors & | | 3/21/2014 | $3,762.00 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- New Wood Win | | 3/21/2014 | $70.20 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Refund, New | | 3/21/2014 | ($35.10) |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Undercounter | | 3/21/2014 | $39.85 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN LOCK & SECU | Clements Remodel- Door Hardwar | | 3/21/2014 | $58.11 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Thermostat | | 3/21/2014 | $22.85 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Thermostat | | 3/21/2014 | $22.85 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Clements Remodel- Office Windo | | 3/21/2014 | $1,327.00 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Electrical P | | 3/21/2014 | $27.60 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Dimmer Switc | | 3/21/2014 | $86.13 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Wall Plates | | 3/21/2014 | $9.86 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Wall Plates | | 3/21/2014 | $9.55 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Wall Plate R | | 3/21/2014 | ($9.55) |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN LOCK & SECU | Clements Remodel- Door Hardwar | | 3/21/2014 | $22.11 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Clements Remodel- Bumpers For | | 3/21/2014 | $6.60 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | Clements Remodel- Light Fixtur | | 3/21/2014 | $39.72 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Estes Motel Remodel- Electrica | | 3/21/2014 | $128.41 |
Community Resources | Bldg Construction Costs | CARTEGRAPH SYSTEMS INC | PO 3211 - Asset Management Sy | | 3/21/2014 | $9,200.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Clements Ctr. Door Finishing | | 3/27/2014 | $835.00 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | PO#4570 THEATER CONSULTANT | | 4/2/2014 | $2,542.15 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Clements Community Center | | 4/3/2014 | $2,160.00 |
Community Resources | Bldg Construction Costs | SUSPENDED-DOUGLASS COLONY GROUP INC | Link Recreation Center Roof | | 4/9/2014 | $289,627.73 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Civic Center-Rubber Stair Trea | | 4/10/2014 | $4,782.59 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Clements Community Center | | 4/17/2014 | $2,160.00 |
Community Resources | Bldg Construction Costs | THE BOULDER PLASTER & STUCCO CO INC | addl amt product change order | | 4/21/2014 | $486.72 |
Community Resources | Bldg Construction Costs | LAKEWOOD PLUMBING LLC | LINK Replace broket roof drain | | 4/21/2014 | $1,173.54 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | Clements Remodel Exterior Temp | | 4/21/2014 | $1,468.32 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | Interior Design, Architecture | | 5/7/2014 | $3,324.35 |
Community Resources | Bldg Construction Costs | BLIND SPOT INC. | PD-Blinds for Training Room | | 5/8/2014 | $3,185.00 |
Community Resources | Bldg Construction Costs | INFINITE ELECTRIC LLC | Morse Park - Elec Work | | 5/8/2014 | $4,900.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PSC 1st floor carpet inv #2836 | | 5/23/2014 | $48,143.10 |
Community Resources | Bldg Construction Costs | SHERWIN WILLIAMS CO | Diner paint | | 5/23/2014 | $166.67 |
Community Resources | Bldg Construction Costs | CARTEGRAPH SYSTEMS INC | Implementation | | 5/23/2014 | $1,908.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Glennon-Paint Mens Locker room | | 5/27/2014 | $100.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Link-Painting touch ups | | 5/27/2014 | $2,145.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Morse Park - Paint Pump House | | 5/27/2014 | $700.00 |
Community Resources | Bldg Construction Costs | DO NOT USE TURNING LEAF PAINTING LLC | GRMC - Paint Gym | | 5/27/2014 | $4,990.00 |
Community Resources | Bldg Construction Costs | DO NOT USE TURNING LEAF PAINTING LLC | GMRC - Lobby & Classroom | | 5/28/2014 | $3,450.00 |
Community Resources | Bldg Construction Costs | CONSOLIDATED ELECTRICAL DISTRIBUTORS | CWRC-Lighting Control | | 5/28/2014 | $275.00 |
Community Resources | Bldg Construction Costs | LARKIN AND ASSOCIATES LLC | Estes Motel: Vinyl Install | | 5/28/2014 | $4,580.29 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | CWRC - GYM floor | | 6/9/2014 | $4,866.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | CWRC-Racq Cts Aerobic Floors | | 6/9/2014 | $1,216.00 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | LCC CENTER SEATING REPLACEMENT | | 6/12/2014 | $1,955.50 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | CWRC-Closure paint repairs | | 6/12/2014 | $450.00 |
Community Resources | Bldg Construction Costs | WALRATH MECHANICAL COMPANY | BCLP Visitors Ctr HVAC Install | | 6/19/2014 | $23,660.00 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | GMRC - Closure Bolts for backb | | 6/24/2014 | $26.90 |
Community Resources | Bldg Construction Costs | LOWES #01903 | GMRC - Closure Grout sealer | | 6/24/2014 | $116.15 |
Community Resources | Bldg Construction Costs | WESTERN INTERIOR SUPPLY | Link - Closure Ceiling Tiels | | 6/24/2014 | $336.00 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | GMRC - Closure Grout Sealer | | 6/24/2014 | $41.97 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | GMRC - Closure Grout Sealer | | 6/24/2014 | $32.97 |
Community Resources | Bldg Construction Costs | A TO Z RENTAL CENTER INC | GMRC - Closure scaffal | | 6/24/2014 | $141.26 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | LINK- LAMPS | | 6/24/2014 | $687.88 |
Community Resources | Bldg Construction Costs | TUFF COAT MFG INC | SURFSIDE PAINT | | 6/24/2014 | $511.60 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | CC & LINK CEILING TILE | | 6/24/2014 | $476.90 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | GMRC LAMPS | | 6/24/2014 | $1,465.34 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT-PAY TR | GMRC BALLASTS | | 6/24/2014 | $178.60 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | LINK LAMPS | | 6/24/2014 | $321.66 |
Community Resources | Bldg Construction Costs | REJUVENATION INC | Estes Motel Historical Renovat | | 6/24/2014 | $54.95 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN LOCK & SECU | Link - Closure Hinges for Wome | | 6/24/2014 | $223.35 |
Community Resources | Bldg Construction Costs | CHARLES D JONES/DENVER | Morse Park Pool - Pump for wat | | 6/24/2014 | $475.90 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | CWRC - Front Door closure repa | | 6/24/2014 | $900.00 |
Community Resources | Bldg Construction Costs | PLUMBING & HEATING SPECIA | Morse Park Pool - Water Line, | | 6/24/2014 | $221.28 |
Community Resources | Bldg Construction Costs | PLUMBING & HEATING SPECIA | MOrse Park Pool - Shower Hoses | | 6/24/2014 | $116.03 |
Community Resources | Bldg Construction Costs | BEVERLY HILLS AUTO G | CWRC - Front Door Closures | | 6/24/2014 | $1,020.00 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | LINK Closure - fuel add tube p | | 6/24/2014 | $58.91 |
Community Resources | Bldg Construction Costs | B-D COMPANY | LINK- Closure ship | | 6/24/2014 | $92.70 |
Community Resources | Bldg Construction Costs | ACE HDWE OF JEWELL SQ | LINK- Closure brushes glue air | | 6/24/2014 | $78.46 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | AVIATION PARK SCULPTURE | | 6/25/2014 | $500.00 |
Community Resources | Bldg Construction Costs | SCS INC | Bid 3673 - Charles Whitlock | | 7/2/2014 | $79,406.65 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | Aviation Park Art Stipend | | 7/3/2014 | $500.00 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | Aviation Park Art Stipend | | 7/3/2014 | $500.00 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | CENTER SEATING REPLACE LCC | | 7/7/2014 | $2,933.25 |
Community Resources | Bldg Construction Costs | 1872 CED | whitlock- mens and womens lock | | 7/23/2014 | $1,089.85 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK EM FIXTURES | | 7/23/2014 | $2,311.02 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK POOL LAMPS & FIXTURES | | 7/23/2014 | $1,224.32 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK POOL LAMPS & FIXTURES | | 7/23/2014 | $2,290.08 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | CC-WHITLOCK-SHOP STOCK LAMPS | | 7/23/2014 | $3,431.28 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock-backbooards | | 7/23/2014 | $296.98 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock-backbooards | | 7/23/2014 | $165.70 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock-backbooards | | 7/23/2014 | $279.35 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock-backboards | | 7/23/2014 | $622.61 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CWRC - led-worlkights-cords-sh | | 7/23/2014 | $446.12 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | CWRC - ledworklights-whitlock- | | 7/23/2014 | $439.85 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | CWRC - led-worklight-whitlock- | | 7/23/2014 | $159.94 |
Community Resources | Bldg Construction Costs | CARTEGRAPH SYSTEMS INC | RFP 3424 Year Two Maintenance | | 7/23/2014 | $15,000.00 |
Community Resources | Bldg Construction Costs | 1872 CED | Whitlock Rec closure-250' MC 8 | | 7/23/2014 | $754.08 |
Community Resources | Bldg Construction Costs | NEFF RENTAL LLC 77 | Whitlock - Purchased tire soc | | 7/23/2014 | $130.00 |
Community Resources | Bldg Construction Costs | 1872 CED | Whitlock Rec backboard motors- | | 7/23/2014 | $270.04 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | Whitlock Rec Center pool light | | 7/23/2014 | $206.47 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | Carmody - Gym Stair treads | | 7/23/2014 | $3,591.05 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carmody - Partial Payment Carp | | 7/23/2014 | $1,831.83 |
Community Resources | Bldg Construction Costs | KENNY ELECTRIC SERVICE, INC | 1060 Quail St Switch Gear | | 7/23/2014 | $6,384.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Half-Door Repairs | | 7/24/2014 | $441.00 |
Community Resources | Bldg Construction Costs | RNL DESIGN INC | Lakewood Facility Programming | | 7/31/2014 | $6,000.00 |
Community Resources | Bldg Construction Costs | RNL DESIGN INC | Lakewood Facility Programming | | 7/31/2014 | $2,000.00 |
Community Resources | Bldg Construction Costs | BLACK BEAR CONSTRUCTION SERVICES, INC | Daniels Head Start | | 8/6/2014 | $18,570.00 |
Community Resources | Bldg Construction Costs | SUSPENDED-DOUGLASS COLONY GROUP INC | Link Recreation Center Roof | | 8/6/2014 | $72,442.27 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | PO 4570 LCC CTR SEAT REPLACE | | 8/6/2014 | $1,955.50 |
Community Resources | Bldg Construction Costs | GOT METAL | AVIATION PARK SCULPTURE | | 8/12/2014 | $500.00 |
Community Resources | Bldg Construction Costs | RJM CONSTRUCTION OF COLORADO LLC | Lakewood Cultural Center | | 8/12/2014 | $61,919.10 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Janitorial Closet LK PD | | 8/20/2014 | $860.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Janitorial Closet LK PD | | 8/20/2014 | $708.00 |
Community Resources | Bldg Construction Costs | SCS INC | Bid 3673 - Charles Whitlock | | 8/20/2014 | $105,230.01 |
Community Resources | Bldg Construction Costs | SCS INC | CO #1 Addi'l Work | | 8/20/2014 | $5,250.00 |
Community Resources | Bldg Construction Costs | SCS INC | CO #3 Remove Tile Floors | | 8/20/2014 | $15,390.00 |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS | Office Furniture/Rec. Manager | | 8/22/2014 | $4,288.82 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Theater Carpet inv# 2881797 PO | | 8/22/2014 | $14,797.16 |
Community Resources | Bldg Construction Costs | PAYPAL INC | Step lights for LCC, Invoice 1 | | 8/22/2014 | $760.44 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK LAMPS | | 8/22/2014 | $1,810.80 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK SHUTDOWN LIGHT FIXTUR | | 8/22/2014 | $71.25 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK SHUTDOWN LIGHT FIXTUR | | 8/22/2014 | $539.88 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK SHUTDOWN LIGHT FIXURE | | 8/22/2014 | $606.20 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK SHUTDOWN LIGHT FIXTUR | | 8/22/2014 | $2,580.13 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK SHUTDOWN LIGHT FIXTUR | | 8/22/2014 | $3,241.62 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | LINK & SHOP STOCK LAMPS AND BA | | 8/22/2014 | $981.66 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock shutdown, lights | | 8/22/2014 | $143.05 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | whitlock shutdown, temp-light | | 8/22/2014 | $206.25 |
Community Resources | Bldg Construction Costs | NEFF RENTAL LLC 77 | CWRC - Shut down - Scissor Lif | | 8/22/2014 | $810.17 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Devinney - Carpet & Tile PO 46 | | 8/22/2014 | $6,861.87 |
Community Resources | Bldg Construction Costs | PLUMBING & HEATING SPECIA | CWRC ( drain bodies & caps ) | | 8/22/2014 | $1,765.68 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | LCC-Vestibules Painting | | 8/27/2014 | $4,560.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Whitlock-Painting | | 8/27/2014 | $900.00 |
Community Resources | Bldg Construction Costs | SCS INC | Bid 3673 - Charles Whitlock | | 9/3/2014 | $24,094.34 |
Community Resources | Bldg Construction Costs | SCS INC | CO #7 Add'l Work | | 9/3/2014 | $23.51 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Repair PD Janitorial Closet | | 9/10/2014 | $1,105.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Carmody-Screen aerobis floor | | 9/15/2014 | $558.00 |
Community Resources | Bldg Construction Costs | PENNY ENTERPRISES | Carmody Pool House-Roof | | 9/15/2014 | $4,850.00 |
Community Resources | Bldg Construction Costs | WALRATH MECHANICAL COMPANY | BCLP Visitors Ctr HVAC Install | | 9/18/2014 | $2,000.00 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | Whitlock - Lighting Supplies | | 9/18/2014 | $23.38 |
Community Resources | Bldg Construction Costs | LOWES #01903 | Daniels - Water heater repair | | 9/18/2014 | $55.91 |
Community Resources | Bldg Construction Costs | PAYPAL INC | Order 527076 Outdoor message b | | 9/18/2014 | $385.84 |
Community Resources | Bldg Construction Costs | PAYPAL INC | Inv 160874 Step lights for LCC | | 9/18/2014 | ($625.80) |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK LAMPS & BALLASTS | | 9/18/2014 | $562.80 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | WHITLOCK LIGHTING TIMER | | 9/18/2014 | $198.03 |
Community Resources | Bldg Construction Costs | E-CONOLIGHT | CARMODY LIGHTS | | 9/18/2014 | $2,549.74 |
Community Resources | Bldg Construction Costs | DIAMOND VOGEL PAINT CENT | Safety Center: Janitorial Clos | | 9/18/2014 | $61.70 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CAR- block wall | | 9/18/2014 | $152.82 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CAR- block wall | | 9/18/2014 | $198.86 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carmody - Carpet Lobby Physica | | 9/18/2014 | $2,664.33 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock- extension rings | | 9/18/2014 | $65.26 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | whitlock- GFI REC, plates | | 9/18/2014 | $156.12 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Carmody - Closrue | | 10/1/2014 | $1,288.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Carmody - Closure paint, patch | | 10/1/2014 | $405.00 |
Community Resources | Bldg Construction Costs | NEFF RENTAL | Carmody Closure-Scissor Lift | | 10/6/2014 | $966.00 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | Interior Design, Architecture | | 10/9/2014 | $1,955.50 |
Community Resources | Bldg Construction Costs | AMERICAN SEATING COMPANY | Cultural Center Theater | | 10/9/2014 | $92,000.44 |
Community Resources | Bldg Construction Costs | AMERICAN SEATING COMPANY | Installation | | 10/9/2014 | $8,351.20 |
Community Resources | Bldg Construction Costs | SEMPLE BROWN DESIGN, PC | Interior Design, Architecture | | 10/21/2014 | $977.75 |
Community Resources | Bldg Construction Costs | RJM CONSTRUCTION OF COLORADO LLC | Lakewood Cultural Center | | 10/22/2014 | $26,028.90 |
Community Resources | Bldg Construction Costs | RJM CONSTRUCTION OF COLORADO LLC | CO #1 Add'l Work | | 10/22/2014 | $3,816.25 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | car- Closure light bulbs | | 10/22/2014 | $303.43 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | car- Closure wall supplies tru | | 10/22/2014 | $156.77 |
Community Resources | Bldg Construction Costs | ACE HDWE OF JEWELL SQ | car- Closure -wall supplies ca | | 10/22/2014 | $26.45 |
Community Resources | Bldg Construction Costs | DEN-COL SUPPLY | CAR - Grinding Wheels, Drill B | | 10/22/2014 | $155.25 |
Community Resources | Bldg Construction Costs | GENERAL AIR SERVICE ZUNI | CAR - Welding Gas | | 10/22/2014 | $124.83 |
Community Resources | Bldg Construction Costs | RIO GRANDE CO. BUI | CAR - 6" Blox | | 10/22/2014 | $860.00 |
Community Resources | Bldg Construction Costs | DEN-COL SUPPLY | CAR - Flat Steele and grinding | | 10/22/2014 | $135.00 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CAR - 2 x 6 - Rebar and wire | | 10/22/2014 | $50.83 |
Community Resources | Bldg Construction Costs | RIO GRANDE CO. BUI | CAR - Morter Blox, durawall | | 10/22/2014 | $352.20 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | CAR - Door Stops | | 10/22/2014 | $53.94 |
Community Resources | Bldg Construction Costs | LOWES #01903 | CAR-shutdown-screws-lights | | 10/22/2014 | $13.64 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | CAR-shutdown-lights | | 10/22/2014 | $124.90 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | CAR-shutdown-LED-lamps | | 10/22/2014 | $572.16 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | Carmody project- 1 20 amp cord | | 10/22/2014 | $59.47 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Carmody closure-1- 3 light rou | | 10/22/2014 | $488.37 |
Community Resources | Bldg Construction Costs | WAGNER RENTS #4 | Fleet - Emergency Repair Remov | | 10/22/2014 | $5,266.71 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | LCC- Theater Capet Sound Booth | | 10/22/2014 | $3,415.95 |
Community Resources | Bldg Construction Costs | SQ OMER BADRI | LCC - Theater - Glass for soun | | 10/22/2014 | $3,058.16 |
Community Resources | Bldg Construction Costs | 1872 CED | CAR- rec wall- S.O. cord for s | | 10/22/2014 | $235.80 |
Community Resources | Bldg Construction Costs | SCS INC | CO #3 Remove Tile Floors | | 11/13/2014 | $5,974.00 |
Community Resources | Bldg Construction Costs | SCS INC | CO #4 Replace Mirrors, Add | | 11/13/2014 | $2,208.00 |
Community Resources | Bldg Construction Costs | SCS INC | CO #5 Add'l Work | | 11/13/2014 | $1,780.31 |
Community Resources | Bldg Construction Costs | SCS INC | CO #6 Deduction for repair and | | 11/13/2014 | $542.40 |
Community Resources | Bldg Construction Costs | SCS INC | CO #7 Add'l Work | | 11/13/2014 | $1,568.69 |
Community Resources | Bldg Construction Costs | SUSPENDED-DOUGLASS COLONY GROUP INC | Link Recreation Center Roof | | 11/13/2014 | $40,230.00 |
Community Resources | Bldg Construction Costs | RJM CONSTRUCTION OF COLORADO LLC | CO #1 Add'l Work | | 11/13/2014 | $4,518.71 |
Community Resources | Bldg Construction Costs | LAKEWOOD PLUMBING, LLC | Graham House - Emergency | | 11/20/2014 | $7,820.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PO 4681 Inv 2914215 Theater Ca | | 11/21/2014 | $15,603.95 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Carmody - Closure - Carpet Lou | | 11/21/2014 | $1,101.55 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | Caramody - Closure - Physical | | 11/21/2014 | $2,056.51 |
Community Resources | Bldg Construction Costs | GARAGE DOOR SPECIALTIES | Carmody - Operator for Carmody | | 11/21/2014 | $1,294.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | LCC - Theater Sound Booth - PO | | 11/21/2014 | $4,633.87 |
Community Resources | Bldg Construction Costs | D & D ROOFING INC | Roof Replacements -Fox Hollow | | 11/25/2014 | $77,422.50 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 530 Basico Arm Chair OSW 21.5" | | 12/9/2014 | $5,643.12 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 555 Basico 2 Person Settee OSW | | 12/9/2014 | $1,341.52 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 530H Basico Hip Chair OSW 21.5 | | 12/9/2014 | $2,070.56 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Westin Nielsen Freight | | 12/9/2014 | $2,148.00 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | COM Fabric Momentum Savant | | 12/9/2014 | $1,568.00 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Momentum Freight | | 12/9/2014 | $124.80 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Receive, Delivery & Install | | 12/9/2014 | $668.00 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Add'l Cost for Chair Leg Inc | | 12/9/2014 | $88.00 |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 530 Basico Arm Chair OSW 21.5" | | 1/21/2015 | ($5,643.12) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 555 Basico 2 Person Settee OSW | | 1/21/2015 | ($1,341.52) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | 530H Basico Hip Chair OSW 21.5 | | 1/21/2015 | ($2,070.56) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Westin Nielsen Freight | | 1/21/2015 | ($2,148.00) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | COM Fabric Momentum Savant | | 1/21/2015 | ($1,568.00) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Momentum Freight | | 1/21/2015 | ($124.80) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Receive, Delivery & Install | | 1/21/2015 | ($668.00) |
Community Resources | Bldg Construction Costs | WESTIN-NIELSEN CORPORATION | Add'l Cost for Chair Leg Inc | | 1/21/2015 | ($88.00) |
Community Resources | Bldg Construction Costs | CONTRACT FURNISHINGS, INC. | | | 1/23/2015 | $13,652.00 |
Community Resources | Bldg Construction Costs | THYSSEN KRUPP ELEVATOR | Civic Center South - Frieght E | | 1/26/2015 | $14,867.48 |
Community Resources | Bldg Construction Costs | OLDE ENGLISH MASONRY INC | rebuild sign- Carr St | | 2/9/2015 | $1,340.00 |
Community Resources | Bldg Construction Costs | D & D ROOFING INC | 2014 Roof Replacement FHGC pay | | 2/20/2015 | $22,577.50 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | 2014 PO 4854 Inv 2960830 Publi | | 2/20/2015 | $40,705.32 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | 2014 PO 3131 Inv 2959066 PD - | | 2/20/2015 | $1,572.15 |
Community Resources | Bldg Construction Costs | KENNY ELECTRIC SERVICE, INC | 1060 Quail - Replace 8 | | 3/3/2015 | $7,116.45 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | PSC - Remove and Replace Rubbe | | 3/16/2015 | $4,147.27 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | PO 4854 Inv 2975697 Public Saf | | 4/20/2015 | $41,704.00 |
Community Resources | Bldg Construction Costs | ZUNI SIGN CO INC | Meadowlark Hills sign | | 4/20/2015 | $491.00 |
Community Resources | Bldg Construction Costs | TK ELEVATOR CORPORATION | Clements - Elevator Guide | | 5/13/2015 | $5,458.00 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT LIGHTING INC | GMRC-LED Lights | | 5/19/2015 | $1,184.50 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Green Mtn Rec-Screen Floors | | 5/20/2015 | $2,517.00 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | Urpan Parks Asbestos Sampling | | 5/22/2015 | $588.90 |
Community Resources | Bldg Construction Costs | A G WASSENAAR INC | WH - Asbestos Survey & lead Ba | | 5/22/2015 | $4,565.25 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | GRMC - Closure | | 6/8/2015 | $2,986.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Glennon Heights - Painting | | 6/8/2015 | $2,905.00 |
Community Resources | Bldg Construction Costs | CONSERVE A WATT LIGHTING INC | CWRC-LED Lights | | 6/22/2015 | $3,521.20 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 7/9/2015 | $13,072.00 |
Community Resources | Bldg Construction Costs | JSTILES STUDIOS LLC | Aviation Park Sculpture | | 7/13/2015 | $500.00 |
Community Resources | Bldg Construction Costs | ERICK C JOHNSON | Aviation Park Art | | 7/13/2015 | $500.00 |
Community Resources | Bldg Construction Costs | BRYAN ANDREWS | Aviation Park Art | | 7/13/2015 | $500.00 |
Community Resources | Bldg Construction Costs | REVEN SWANSON | Aviation Park Art | | 7/13/2015 | $500.00 |
Community Resources | Bldg Construction Costs | GOT METAL | Aviation Park Art | | 7/13/2015 | $500.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Glennon - Paint Safety Wall | | 7/14/2015 | $200.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | CWRC - Closure - Paint | | 7/14/2015 | $1,125.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Stone House - basement floor | | 7/14/2015 | $1,575.00 |
Community Resources | Bldg Construction Costs | INDUSTRIAL PIPE SOLUTIONS | BCLP - Tank investigation | | 7/21/2015 | $1,000.00 |
Community Resources | Bldg Construction Costs | J&D WINDOW INNOVATIONS, LLC | Graham House - Blinds | | 7/29/2015 | $2,013.37 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 8/6/2015 | $3,876.60 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | Whitlock - Recoat pool floor | | 8/19/2015 | $2,371.80 |
Community Resources | Bldg Construction Costs | INTUIT QB FINANCE SW | UParks Mtc -164863 Part 1 of i | | 8/19/2015 | $1,231.00 |
Community Resources | Bldg Construction Costs | NEFF RENTAL | Addenbrook LED's | | 9/2/2015 | $608.42 |
Community Resources | Bldg Construction Costs | NEFF RENTAL | Addenbrook LED's-Scissor Lift | | 9/2/2015 | $401.35 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 9/9/2015 | $2,835.00 |
Community Resources | Bldg Construction Costs | NEFF RENTAL | Addenbrook LED's-Scissor Lift | | 9/14/2015 | $1,207.79 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Carmody Closure-Painting | | 9/14/2015 | $3,387.00 |
Community Resources | Bldg Construction Costs | THE RMH GROUP, INC. | Clements Community Center | | 9/16/2015 | $36,180.00 |
Community Resources | Bldg Construction Costs | SURFACE CENTER INC | Carmody - Wood Floor Screen | | 9/17/2015 | $588.00 |
Community Resources | Bldg Construction Costs | TOOL ZONE | addenbrook park- holr saw bits | | 9/28/2015 | $259.70 |
Community Resources | Bldg Construction Costs | LOWES #01903 | addenbrook park -cooling towel | | 9/28/2015 | $208.56 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | addenbrook park- new drill arb | | 9/28/2015 | $114.76 |
Community Resources | Bldg Construction Costs | WW GRAINGER 064 | SHOP SUPPLIES & WHITLOCK LIGHT | | 9/28/2015 | $3,416.58 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | ADDENBROOK WIRE | | 9/28/2015 | $108.70 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | ADDENBROOK WIRE | | 9/28/2015 | $622.25 |
Community Resources | Bldg Construction Costs | LOWES #01903 | addenbrook LED lights, drill b | | 9/28/2015 | $188.85 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | Addenbrook lighting project-4- | | 9/28/2015 | $256.96 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | addenbook lighting project2 de | | 9/28/2015 | $562.92 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | addenbrook lighting project, 6 | | 9/28/2015 | $188.10 |
Community Resources | Bldg Construction Costs | INTERMOUNTAIN DIST CO | addenbrook- wire | | 9/28/2015 | $514.07 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | DEMOLITION/ECONOMIC DEV OFFICE | | 9/30/2015 | $4,200.00 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 10/8/2015 | $200.00 |
Community Resources | Bldg Construction Costs | ASBESTOS ABATEMENT INC | Asbestos Abatement at | | 10/8/2015 | $30,627.00 |
Community Resources | Bldg Construction Costs | THE RMH GROUP, INC. | Clements Community Center | | 10/13/2015 | $7,650.00 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 10/13/2015 | $3,575.00 |
Community Resources | Bldg Construction Costs | LARKIN & ASSOCIATES | Carmody - Closure - Ceramic la | | 10/22/2015 | $1,500.00 |
Community Resources | Bldg Construction Costs | SQ BEVERLY HILLS GLASS R | Civic Center North & South - E | | 10/22/2015 | $4,995.00 |
Community Resources | Bldg Construction Costs | MILE HIGH MEMORIALS, INC | Civic Center Plaza - Engrave F | | 10/22/2015 | $1,195.00 |
Community Resources | Bldg Construction Costs | RNF CONSULTANTS INC | CR SOFFIT ADDITION | | 11/2/2015 | $292.50 |
Community Resources | Bldg Construction Costs | CARNATION BUILDING SERVICE INC | Fox Hollow - Wooden Baseboards | | 11/3/2015 | $1,500.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | DEMOLITION CR DEPT | | 11/4/2015 | $1,210.00 |
Community Resources | Bldg Construction Costs | KENNY ELECTRIC SERVICE, INC | 1060 Quail - Replace 8 | | 11/5/2015 | $14,448.55 |
Community Resources | Bldg Construction Costs | D&D MONARCH SHEET METAL, INC. | Fox Hollow-Downspout | | 11/12/2015 | $885.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Fox Hollow - Paint of | | 11/12/2015 | $7,700.00 |
Community Resources | Bldg Construction Costs | AVALANCHE OF COLORS INC | Change Order 1 | | 11/12/2015 | $750.00 |
Community Resources | Bldg Construction Costs | THE RMH GROUP, INC. | Clements Community Center | | 11/12/2015 | $4,870.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | EREC STEEL SOFFIT/REMOVE TILE | | 11/18/2015 | $2,685.00 |
Community Resources | Bldg Construction Costs | REPUBLIC SERVICES INC | Economic Development Remodel/C | | 11/23/2015 | $125.00 |
Community Resources | Bldg Construction Costs | DVH COMPANY INC | Link - Paint Gym Walls | | 11/23/2015 | $3,850.00 |
Community Resources | Bldg Construction Costs | DVH COMPANY INC | Link - Refinish 8 Doors | | 11/23/2015 | $2,600.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | Civic Center South Offices | | 11/24/2015 | $1,094.00 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | CR Office Construction | | 11/30/2015 | $342.00 |
Community Resources | Bldg Construction Costs | RNF CONSULTANTS INC | JOB NO. 4485.0 SOFFIT ADDITION | | 12/4/2015 | $115.00 |
Community Resources | Bldg Construction Costs | PCD ENGINEERING SERVICES, INC. | Washington Heights Facility | | 12/10/2015 | $3,235.40 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | MISC ECON OFFICE SPACE | | 12/16/2015 | $691.00 |
Community Resources | Bldg Construction Costs | THE HOME DEPOT 1514 | Economic Development Offices- | | 12/16/2015 | $3.96 |
Community Resources | Bldg Construction Costs | GREEN MOUNTAIN ACE HARDWARE | Economic Development Offices- | | 12/16/2015 | $13.98 |
Community Resources | Bldg Construction Costs | PEPPERDINES MARKING | Civic Center Id Tags | | 12/16/2015 | $425.00 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | FHGC - New Carpet in Club Hous | | 12/16/2015 | $19,473.52 |
Community Resources | Bldg Construction Costs | TANDUS FLOORING | FHGC - Carpet for Club House - | | 12/16/2015 | $17,082.39 |
Community Resources | Bldg Construction Costs | DIRTT ENVIRONMENTAL SOLUTIONS INC | DIRTT Walls | | 12/17/2015 | $16,052.99 |
Community Resources | Bldg Construction Costs | DIRTT ENVIRONMENTAL SOLUTIONS INC | COM After Mkt Sliding Window | | 12/17/2015 | $1,000.00 |
Community Resources | Bldg Construction Costs | DIRTT ENVIRONMENTAL SOLUTIONS INC | DIRTT Power & Data | | 12/17/2015 | $291.50 |
Community Resources | Bldg Construction Costs | DIRTT ENVIRONMENTAL SOLUTIONS INC | Freight | | 12/17/2015 | $4,600.00 |
Community Resources | Bldg Construction Costs | DIRTT ENVIRONMENTAL SOLUTIONS INC | Delivery & Install | | 12/17/2015 | $2,868.17 |
Community Resources | Bldg Construction Costs | JAMES A WILLIAMSON | ED Office Construction | | 12/30/2015 | $2,358.00 |