Please Note: Dates entered outside the range of available data (1/1/2010 and 12/31/2023) will not be accepted. For more information refer to the FAQs |
|
Planning | Consulting Costs-Other Improve | MULLER ENGINEERING CO INC | Morse Pk-Rain Garden Feas Stud | | 2/2/2012 | $1,131.00 | Planning | Consulting Costs-Other Improve | TIMBERLINE MAPPING & SURVEYING | Morse Pond Park-Surveying Serv | | 5/14/2012 | $2,000.00 | Planning | Consulting Costs-Other Improve | A G WASSENAAR INC | Sunset Park - Concrete Samplin | | 3/13/2013 | $289.00 | Planning | Consulting Costs-Other Improve | TIM UPHAM, INC. | Art stipend 14th/Lamar roundab | | 5/21/2013 | $500.00 | Planning | Consulting Costs-Other Improve | CHRISTOPHER WEED SCULPTURE, INC. | Art stipend 14th/Lamar roundab | | 5/22/2013 | $500.00 | Planning | Consulting Costs-Other Improve | METAL ART LLC | Art stipend 14th/Lamar Roundab | | 5/31/2013 | $500.00 | Planning | Consulting Costs-Other Improve | THE AGRICULTURAL DITCH & RESERVOIR CO | Green Gables Pk Playgrnd Drain | | 12/15/2014 | $1,500.00 | Planning | Consulting Costs-Other Improve | ESI LAND SURVEYING LLC | Sutherland Shire-Main | | 2/3/2015 | $2,600.00 | Planning | Consulting Costs-Other Improve | BCER ENGINEERING, INC. | CONSTRUCTION DOCUMENTS | | 4/22/2015 | $4,500.00 |
|
| |
| |