Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 5/6/2010 | $652.96 |
Public Works | Construc Costs-Sewer Lines | WEINLAND CONSTRUCTION INC | RFQ 3005 Sanitary Sewer Pipe | | 5/13/2010 | $16,000.00 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 5/13/2010 | $13,759.24 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection of Sewer Line | | 5/20/2010 | $3,114.32 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection of sewer line | | 5/20/2010 | $2,673.00 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 7/1/2010 | $548.24 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 7/7/2010 | $584.53 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 8/5/2010 | $1,332.31 |
Public Works | Construc Costs-Sewer Lines | A G WASSENAAR INC | MATERIAL TESTING-SANITARY SEWE | | 8/25/2010 | $978.00 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 8/26/2010 | $2,583.68 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 8/26/2010 | $1,129.48 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 9/16/2010 | $1,654.84 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 9/23/2010 | $406.56 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 10/14/2010 | $155.53 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 10/28/2010 | $92.40 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 10/28/2010 | $562.32 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 11/9/2010 | $8,496.32 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 11/23/2010 | $1,023.88 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place Pipe Program | | 11/23/2010 | $148,306.68 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 12/9/2010 | $6,399.14 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection per RFQ2700 | | 12/16/2010 | $623.48 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place Pipe Program | | 1/10/2011 | $76,134.78 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 1/13/2011 | $1,314.28 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 2/2/2011 | $950.07 |
Public Works | Construc Costs-Sewer Lines | AMERICAN WEST CONSTRUCTION LLC | Sanitary Sewer Line Repair | | 2/10/2011 | $26,780.00 |
Public Works | Construc Costs-Sewer Lines | AMERICAN WEST CONSTRUCTION LLC | Sanitary Sewer Line Repair | | 2/10/2011 | $5,485.00 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place Pipe Program | | 3/2/2011 | $30,953.94 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 3/9/2011 | $384.50 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | CIPP Engineering Services | | 4/14/2011 | $144.61 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection - Pipelines | | 4/21/2011 | $19,372.18 |
Public Works | Construc Costs-Sewer Lines | RNR ENTERPRISE DBA DRAIN DOCTORS | Video Inspection - Pipelines | | 4/21/2011 | $602.42 |
Public Works | Construc Costs-Sewer Lines | DENVER TRANSIT CONSTRUCTION GROUP | Sanitary Main Line Repairs | | 5/5/2011 | $8,721.56 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 8/11/2011 | $4,562.64 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 9/14/2011 | $787.44 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 10/7/2011 | $2,208.27 |
Public Works | Construc Costs-Sewer Lines | BRANNAN SAND AND GRAVEL | Storm Water Utility 2011 PO #1 | | 10/11/2011 | $60,112.10 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 11/2/2011 | $2,972.56 |
Public Works | Construc Costs-Sewer Lines | BRANNAN SAND AND GRAVEL | Valve Rplmnts Fairfield common | | 11/17/2011 | $52,662.68 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 12/1/2011 | $574.74 |
Public Works | Construc Costs-Sewer Lines | BRANNAN SAND AND GRAVEL | Pay Est #5 20th/Yukon PO #131 | | 12/19/2011 | $55,750.32 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place-Pipe Program | | 12/21/2011 | $167,791.85 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 12/28/2011 | $5,234.09 |
Public Works | Construc Costs-Sewer Lines | GUILDNER PIPELINE MAINT INC | CIPP Point Repairs | | 1/18/2012 | $34,555.00 |
Public Works | Construc Costs-Sewer Lines | GUILDNER PIPELINE MAINT INC | CIPP Point Repairs | | 1/25/2012 | $995.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 1/26/2012 | $4,433.19 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place-Pipe Program | | 1/26/2012 | $47,135.20 |
Public Works | Construc Costs-Sewer Lines | BRANNAN SAND AND GRAVEL | 2011 Final Settlement Retainag | | 2/21/2012 | $8,029.21 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 2/23/2012 | $830.95 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 4/12/2012 | $276.70 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 5/2/2012 | $1,450.76 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 5/23/2012 | $444.19 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-In-Place-Pipe Program | | 5/24/2012 | $11,311.95 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Engineer | | 6/27/2012 | $348.40 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehabilitation | | 9/5/2012 | $3,182.19 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured in Place Pipe Program | | 9/13/2012 | $213,426.53 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehabilitation | | 10/17/2012 | $6,992.32 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured in Place Pipe Program | | 10/25/2012 | $10,382.47 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured in Place Pipe Program | | 10/25/2012 | $850.50 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehabilitation | | 10/30/2012 | $275.85 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Eng Svcs | | 10/16/2013 | $2,664.61 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured In Place Pipe Program | | 11/7/2013 | $106,830.35 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Eng Svcs | | 11/21/2013 | $5,962.81 |
Public Works | Construc Costs-Sewer Lines | UNITED SITE SVCS CO | Portolets | | 12/17/2013 | $80.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Eng Svcs | | 12/19/2013 | $453.14 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured In Place Pipe Program | | 12/19/2013 | $4,860.65 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured In Place Pipe Program | | 12/19/2013 | $762.00 |
Public Works | Construc Costs-Sewer Lines | QUICK'S HOE & LANDSCAPE SERVICE INC | Sanitary Sewer Manhole Install | | 12/31/2013 | $41,550.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehab Eng Svcs | | 1/23/2014 | $255.44 |
Public Works | Construc Costs-Sewer Lines | TELE ENVIRONMENTAL SYSTEMS INC, TES | Cured-In-Place-Pipe | | 4/22/2014 | $9,200.00 |
Public Works | Construc Costs-Sewer Lines | TELE ENVIRONMENTAL SYSTEMS INC, TES | Cured-In-Place-Pipe | | 6/18/2014 | $17,800.00 |
Public Works | Construc Costs-Sewer Lines | TELE ENVIRONMENTAL SYSTEMS INC, TES | Cured-In-Place-Pipe | | 10/15/2014 | $3,750.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehabiliation | | 2/15/2017 | $4,572.17 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | 2016 Cured-in-Place Pipe | | 2/16/2017 | $118,202.40 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | 2016 Engineering Consultation | | 3/14/2017 | $18,594.40 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | 2016 Cured-in-Place Pipe | | 3/22/2017 | $10,627.20 |
Public Works | Construc Costs-Sewer Lines | COLORADO CIVIL INFRASTRUCTURE INC | Construc Costs-Sewer Lines | | 4/6/2017 | $122,008.55 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | 2016 Cured-in-Place Pipe | | 5/4/2017 | $14,314.40 |
Public Works | Construc Costs-Sewer Lines | COLORADO CIVIL INFRASTRUCTURE INC | Construc Costs-Sewer Lines | | 5/11/2017 | $76,873.65 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Sanitary Sewer Rehabiliation | | 5/11/2017 | $19,423.83 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Inv109704 Pd AP voucher RobCar | | 5/11/2017 | ($18,594.40) |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Add'l funds added per KylBec | | 5/11/2017 | $4.00 |
Public Works | Construc Costs-Sewer Lines | COLORADO CIVIL INFRASTRUCTURE INC | Construc Costs-Sewer Lines | | 6/22/2017 | $6,365.00 |
Public Works | Construc Costs-Sewer Lines | HYDRO PHYSICS PIPE INSPECTION SERVICES | MAIN LINE CAMERA INSPECTION | | 7/5/2017 | $600.00 |
Public Works | Construc Costs-Sewer Lines | HYDRO PHYSICS PIPE INSPECTION SERVICES | MAIN LINE CAMERA INSPECTION | | 7/20/2017 | ($600.00) |
Public Works | Construc Costs-Sewer Lines | HYDRO PHYSICS PIPE INSPECTION SERVICES | 2017 Clean & Video Inspection | | 7/20/2017 | $600.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | 2017 CIPP Engineering Services | | 11/15/2017 | $2,179.26 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | 2017 CIPP Engineering Services | | 12/6/2017 | $2,798.76 |
Public Works | Construc Costs-Sewer Lines | COLORADO CIVIL INFRASTRUCTURE INC | Construc Costs-Sewer Lines | | 12/14/2017 | $50,180.35 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | 2017 CIPP Engineering Services | | 1/17/2018 | $5,119.80 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | 2017 CIPP Engineering Services | | 1/17/2018 | $4,144.26 |
Public Works | Construc Costs-Sewer Lines | COLORADO CIVIL INFRASTRUCTURE INC | Construc Costs-Sewer Lines | | 1/25/2018 | $12,601.45 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | Cured In Place Pipe (CIPP) | | 2/7/2018 | $165,756.00 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | Cured In Place Pipe (CIPP) | | 3/15/2018 | $6,669.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 4/11/2018 | $175.35 |
Public Works | Construc Costs-Sewer Lines | LAYNE INLINER LLC | Cured In Place Pipe (CIPP) | | 5/1/2018 | $9,075.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 7/5/2018 | $2,044.55 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 8/13/2018 | $1,622.25 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 8/30/2018 | $2,565.64 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 9/20/2018 | $11,748.48 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 10/4/2018 | $1,899.77 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-in-Place Pipe Program | | 10/4/2018 | $169,569.30 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Engineering Svcs - Sanitary | | 12/6/2018 | $2,569.65 |
Public Works | Construc Costs-Sewer Lines | MICROBAC LABORATORIES | Invoice YA8G00520 CIPP sample | | 12/17/2018 | $425.00 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Cured-in-Place Pipe Program | | 1/9/2019 | $8,924.70 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications | | 4/3/2019 | $272.64 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 4/29/2019 | $1,658.04 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications W&S | | 5/21/2019 | $220.81 |
Public Works | Construc Costs-Sewer Lines | URBAN DRAINAGE & FLOOD CONTROL DISTRICT | DRY GULCH IMPROVEMENTS | | 7/3/2019 | $540,000.00 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 7/11/2019 | $168,975.49 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 8/1/2019 | $4,250.81 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 8/13/2019 | $152,254.22 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Corrected Accout # per Kyle | | 9/11/2019 | $219,194.63 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 9/11/2019 | $4,385.97 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 9/12/2019 | $203,197.40 |
Public Works | Construc Costs-Sewer Lines | PSILAB INC | Properties Testing | | 10/9/2019 | $675.00 |
Public Works | Construc Costs-Sewer Lines | UNITED SITE SVCS CO | portolet & sink station | | 10/15/2019 | $210.00 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 10/23/2019 | $269,386.25 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 11/25/2019 | $1,091.23 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 12/5/2019 | $103,188.29 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications | | 12/19/2019 | $213.00 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 12/23/2019 | $1,143.95 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | 2019 Utility Notifications | | 1/2/2020 | $254.18 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Corrected Accout # per Kyle | | 1/9/2020 | $11,536.56 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 1/9/2020 | $8,933.92 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 1 Add'l Work | | 1/9/2020 | $52,945.00 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 2 Add'l Work | | 1/9/2020 | $9,384.00 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 3 Add'l Work | | 1/9/2020 | $20,541.77 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 2/18/2020 | $300.98 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 3/6/2020 | $342.70 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 4/7/2020 | $295.02 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 4/8/2020 | $94,762.48 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 3 Add'l Work | | 4/8/2020 | $5,393.23 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 6/17/2020 | $314.39 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 6/25/2020 | $293.53 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat Sew | | 7/8/2020 | $317.37 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 7/9/2020 | $2,320.08 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 7/9/2020 | $4,144.72 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 7/9/2020 | $7,054.88 |
Public Works | Construc Costs-Sewer Lines | PSILAB INC | Properties testing | | 7/28/2020 | $750.00 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | Sanitary Sewer System | | 8/3/2020 | $152,108.87 |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 6 Work Item Deductions | | 8/3/2020 | ($25,205.54) |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 7 Final Qty Adj | | 8/3/2020 | ($84,699.66) |
Public Works | Construc Costs-Sewer Lines | ESCO CONSTRUCTION COMPANY | CO 4 Add'l Work | | 8/3/2020 | $8,411.25 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 8/11/2020 | $362.07 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 9/8/2020 | $303.96 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 9/16/2020 | $571.65 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services-Sanitary Sewer | | 9/16/2020 | $323.27 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Utility Notifications Wat/Sew | | 10/7/2020 | $372.50 |
Public Works | Construc Costs-Sewer Lines | INSITUFORM TECHNOLOGIES (DO NOT USE) | Reinstate Bal for Pay APP 2 | | 10/22/2020 | $10,436.13 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | October Locates | | 11/9/2020 | $447.00 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | UNCC Water and Sewer | | 12/16/2020 | $300.98 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Decem2020 Water and Sewer UNCC | | 1/4/2021 | $236.91 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Water and Sewer Locates | | 2/22/2021 | $240.24 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Water and Sewer Locates | | 3/3/2021 | $225.72 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services - Sanitary Sewer | | 4/7/2021 | $5,113.18 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | UNCC Water and Sewer Locates | | 4/12/2021 | $308.88 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services - Sanitary Sewer | | 5/3/2021 | $6,089.99 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Water and Sewer UNCC | | 5/12/2021 | $282.48 |
Public Works | Construc Costs-Sewer Lines | PSILAB INC | TESTING AND CERTIFICATION | | 5/18/2021 | $750.00 |
Public Works | Construc Costs-Sewer Lines | UTILITY NOTIFICATION CTR OF COLORADO | Water and Sewer UNCC | | 6/7/2021 | $323.40 |
Public Works | Construc Costs-Sewer Lines | KENNEDY / JENKS CONSULTANTS INC | Eng. Services - Sanitary Sewer | | 6/9/2021 | $1,201.80 |