Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construc | | 1/27/2010 | $1,609.82 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construct | | 1/27/2010 | $4,786.45 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construct | | 1/27/2010 | $11,226.35 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construct | | 1/27/2010 | $600.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construct | | 1/27/2010 | $1,784.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Battery Cabinet Surge | | 1/27/2010 | $3,292.80 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009 Traffic Signal Construct | | 1/27/2010 | $9,570.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 2/11/2010 | $9,165.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 2/11/2010 | $762.20 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/4/2010 | $31,317.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $2,409.60 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $2,588.85 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $2,722.80 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $2,700.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $499.45 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $100.55 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/10/2010 | $168.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/11/2010 | $2,300.80 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | emergency repair signal pole | | 4/8/2010 | $449.60 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda & Routt - St Anthony's | | 4/8/2010 | $46,863.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda & Routt Traffic Signal | | 6/3/2010 | $35,800.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Gladiola Way Speed Displays | | 6/3/2010 | $444.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Florida & Kendall Controller | | 6/3/2010 | $1,646.40 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 12900 W Utah Signal Cabinet | | 6/3/2010 | $1,186.20 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2050 s kipling Signal Cabinet | | 6/3/2010 | $945.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2551 S Estes | | 6/3/2010 | $945.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda & Wads Fiber Relocate | | 6/3/2010 | $186.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Hampden & Wads Loop Detectors | | 6/3/2010 | $2,041.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2044 S Garrison Signal Cabinet | | 6/3/2010 | $1,026.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Qunicy & Kipling Push Button | | 6/3/2010 | $1,817.20 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 6th & Union Conduit/Pwr Cable | | 6/3/2010 | $13,112.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda & Routt-St. Anthony | | 6/10/2010 | $9,978.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | RFP No. 2863 | | 8/19/2010 | $2,900.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | RFP No. 2863 | | 8/19/2010 | $2,810.14 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Traffic Control System Upgrade | | 8/19/2010 | $171,000.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. One | | 8/26/2010 | $4,315.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Inv 15274 acct # correction | | 8/26/2010 | $19,373.35 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Inv 15598 acct # correction | | 8/26/2010 | $35,800.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | RFP No. 2863 | | 8/26/2010 | $11,484.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. One | | 9/2/2010 | $19,435.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. One | | 9/2/2010 | $11,898.75 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | RFP No. 2863 | | 9/14/2010 | $2,014.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | RFP No. 2863 | | 9/14/2010 | $1,072.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax & Welch | | 10/7/2010 | $8,109.61 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax & Welch | | 10/7/2010 | $4,628.89 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax & Welch | | 10/7/2010 | $2,300.80 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Inv 15274 acct # correction | | 10/14/2010 | $1,184.44 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Traffic Control System Upgrade | | 11/5/2010 | $105,600.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Inv 15274 acct # correction | | 12/9/2010 | $5,257.00 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Traffic Control System Upgrade | | 12/22/2010 | $33,900.00 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Traffic Control System Upgrade | | 1/14/2011 | $7,500.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. One | | 3/24/2011 | $7,194.15 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Inv 15274 acct # correction | | 3/24/2011 | $7,194.15 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/24/2011 | $431.71 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda Ave @ Harlan & Depew | | 5/5/2011 | $67,743.73 |
Public Works | Construc Costs-Traffic Signals | SEH | 2011 SURVEYS ON PROJECTS | | 5/24/2011 | $2,533.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda Ave @ Harlan & Depew | | 6/16/2011 | $264,883.31 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | City of Lakewood Wavetronix | | 7/21/2011 | $5,995.00 |
Public Works | Construc Costs-Traffic Signals | TRAFFIC SIGNAL CONTROLS INC | School Flasher System | | 11/10/2011 | $7,136.46 |
Public Works | Construc Costs-Traffic Signals | THE MCGRAW HILL COMPANIES INC | Bid 3229 -Kipling Traffic Sign | | 11/17/2011 | $921.60 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda Ave @ Harlan & Depew | | 12/20/2011 | $31,442.50 |
Public Works | Construc Costs-Traffic Signals | ADVANCED TRAFFIC PRODU | 2011 Channel Phase Selector PO | | 2/21/2012 | $6,595.30 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 2/23/2012 | $223.64 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 2/23/2012 | $1,454.80 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 2/23/2012 | $871.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/14/2012 | $21,785.75 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda Ave @ Harlan & Depew | | 3/22/2012 | $13,306.70 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | Kipling Traffic Sgnl Upgrades | | 4/18/2012 | $142,174.15 |
Public Works | Construc Costs-Traffic Signals | TRAFFIC SIGNAL CONTROLS | 2011 - School Flasher System - | | 4/24/2012 | $27,205.98 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Alameda Ave @ Harlan & Depew | | 5/3/2012 | $8,731.82 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 5/16/2012 | $2,102.00 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | Kipling Traffic Sgnl Upgrades | | 5/17/2012 | $156,314.39 |
Public Works | Construc Costs-Traffic Signals | ADVANCED TRAFFIC PRODU | Purchase Micro Loop Leadin cab | | 5/22/2012 | $1,365.00 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | Kipling Traffic Sgnl Upgrades | | 6/14/2012 | $341,811.53 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/18/2012 | $22,057.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/18/2012 | $3,191.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/18/2012 | $1,110.20 |
Public Works | Construc Costs-Traffic Signals | ADVANCED FIBER RESPONSE INC | SIGNAL WORK KIPLING/EXPOSITION | | 8/10/2012 | $680.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | 4 ea - NEMA P TYPE CABINETS | | 9/12/2012 | $11,200.00 |
Public Works | Construc Costs-Traffic Signals | ECONOLITE CONTROL PROD | AENCORE equip Inv# 98836 - PO# | | 9/18/2012 | $7,209.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 10/25/2012 | $15,523.25 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/17/2013 | $19,550.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/17/2013 | $525.20 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/17/2013 | $1,905.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/17/2013 | $1,274.27 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | 2012 ADDL WORK-KIPLING SIGNALS | | 2/5/2013 | $2,225.50 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | Kipling Traffic Sgnl Upgrades | | 2/14/2013 | $10,476.93 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | CMO#1 42" Caisson, Conduit, & | | 2/14/2013 | $10,610.00 |
Public Works | Construc Costs-Traffic Signals | KECI COLORADO INC | CMO #2 - FInal Quantity Adj | | 2/14/2013 | $23,610.50 |
Public Works | Construc Costs-Traffic Signals | ENVIRONMENTAL DATA RES | HAZMAT DATA SEARCH AT OHIO-UNI | | 2/21/2013 | $370.00 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | Wavetronix SmartSensor, SS225: | | 4/16/2013 | $7,395.00 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | Option: Click! 301 | | 4/16/2013 | $535.00 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | Bulk Matrix Cable: 50 ft @ | | 4/16/2013 | $47.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/23/2013 | $37,816.69 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/23/2013 | $1,755.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/23/2013 | $1,742.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/23/2013 | $11,417.55 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/23/2013 | $1,410.18 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | TRAVEL TIME APPLICATION FOR | | 7/25/2013 | $12,058.96 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | TRAVEL TIME APPLICATION FOR | | 8/20/2013 | $78,383.23 |
Public Works | Construc Costs-Traffic Signals | XCEL ENERGY | POWER SERV TO 258 UNION SIGNAL | | 9/3/2013 | $5,993.00 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | TRAVEL TIME APPLICATION FOR | | 9/4/2013 | $30,147.40 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | Wavetronix SmartSensor Matrix | | 10/3/2013 | $78,950.00 |
Public Works | Construc Costs-Traffic Signals | SUMMIT TRAFFIC SOLUTIONS | Construc Costs-Traffic Signals | | 10/3/2013 | ($3,947.50) |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | WADSWORTH BLVD TRAVEL TIME | | 10/15/2013 | $22,304.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 11/14/2013 | $32,477.69 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 12/10/2013 | $42,832.50 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 1/16/2014 | $706.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 2/6/2014 | $50,325.87 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/11/2014 | $5,686.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 3/11/2014 | $2,658.64 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 4/3/2014 | $1,043.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 4/3/2014 | $1,165.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 4/3/2014 | $1,040.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 4/3/2014 | $421.60 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 4/17/2014 | $36,794.62 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 6/5/2014 | $3,175.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/11/2014 | $36,827.93 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/11/2014 | $4,341.00 |
Public Works | Construc Costs-Traffic Signals | GOODLAND CONSTRUCTION INC | RETAINING WALL MATERIAL | | 6/13/2014 | $2,213.78 |
Public Works | Construc Costs-Traffic Signals | THE EROSION CONTROL COMPANY | PRAIRIE DOG BARRIER | | 6/24/2014 | $432.50 |
Public Works | Construc Costs-Traffic Signals | ENVIRONMENTAL DESIGN INC | IRRIGATION REPAIR | | 7/23/2014 | $1,258.05 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 7/24/2014 | $2,199.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 7/24/2014 | $18,427.54 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Bid 3500 - 260 Union Boulevard | | 9/4/2014 | $2,933.70 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 9/18/2014 | $5,776.50 |
Public Works | Construc Costs-Traffic Signals | THE DENVER BUSINESS JOURNAL | Bid 3674 Advertisement | | 9/18/2014 | $736.00 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 10/15/2014 | $3,633.50 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 11/19/2014 | $3,566.00 |
Public Works | Construc Costs-Traffic Signals | ERO RESOURCES CORPORATION | PRAIRIE DOG ISSUES-KIPLING PRO | | 11/19/2014 | $234.08 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $1,080.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $8,234.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $13,923.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $2,157.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $1,130.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/10/2014 | $4,229.53 |
Public Works | Construc Costs-Traffic Signals | MULLER ENGINEERING CO INC | Wadsworth Blvd Travel Time | | 12/18/2014 | $704.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax/Lamar, Colfax/Harlan | | 3/26/2015 | $149,131.03 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 3/26/2015 | $3,214.85 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 4/16/2015 | $103,544.53 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax/Lamar, Colfax/Harlan | | 4/16/2015 | $278,546.28 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 5/14/2015 | $106,971.56 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Colfax/Lamar, Colfax/Harlan | | 5/27/2015 | $302,271.69 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Installation | | 5/27/2015 | $18,473.75 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | CO #1 Add'l Work | | 5/27/2015 | $11,914.00 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 6/24/2015 | $133,869.93 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Installation | | 7/1/2015 | $175,380.32 |
Public Works | Construc Costs-Traffic Signals | ROCKY MOUNTAIN SIGNING CO INC | KIPLING SIGNAL AT DARTMOUTH | | 10/30/2015 | $4,010.00 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 11/12/2015 | $180,459.25 |
Public Works | Construc Costs-Traffic Signals | TK CONSTRUCTION US LLC | Traffic Signal Upgrades at | | 11/12/2015 | $55,858.54 |
Public Works | Construc Costs-Traffic Signals | XCEL ENERGY | Electric Distribution Line Ext | | 12/28/2015 | $5,289.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/14/2016 | $3,082.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/14/2016 | $4,273.70 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 1/14/2016 | $17,675.50 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 4/7/2016 | $74,623.57 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $8,283.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $7,889.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $7,104.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $3,432.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $7,919.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $6,909.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $12,105.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $8,843.30 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $9,595.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 5/5/2016 | $8,507.80 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 5/19/2016 | $320,726.31 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | Velocity Intersection Kit | | 5/26/2016 | $45,500.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 6/2/2016 | $5,489.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 6/9/2016 | $3,920.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Maintenance | | 6/9/2016 | $20,700.15 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 7/7/2016 | $185,706.98 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Development: Option 2 | | 7/7/2016 | $2,925.78 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Project Management | | 7/7/2016 | $216.77 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Development: Option 2 | | 7/21/2016 | $797.94 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Project Management | | 7/21/2016 | $361.27 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Project Management | | 7/21/2016 | $72.27 |
Public Works | Construc Costs-Traffic Signals | CUSTOM ENVIRONMENTAL SERV | DISPOSAL OF CONTAMINATED MATER | | 7/31/2016 | $3,156.59 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 8/11/2016 | $540,174.41 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Development: Option 2 | | 9/7/2016 | $1,627.83 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Deployment | | 9/7/2016 | $2,127.84 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Deployment Support | | 9/7/2016 | $1,050.00 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Development: Option 2 | | 10/13/2016 | $608.24 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 10/26/2016 | $13,863.43 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 12/8/2016 | $23,184.07 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | Development: Option 2 | | 12/8/2016 | $132.99 |
Public Works | Construc Costs-Traffic Signals | STURGEON ELECTRIC CO INC | Wadsworth Traffic Signals | | 12/15/2016 | $35,234.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | CO #2(Final) | | 12/15/2016 | $9,493.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Installation | | 12/15/2016 | $6,145.93 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Installation | | 12/15/2016 | $20,000.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. 3 | | 4/20/2017 | $3,044.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. 3 | | 4/20/2017 | $3,517.00 |
Public Works | Construc Costs-Traffic Signals | TRANSCORE ITS LLC | XML Feed modifications to | | 5/31/2017 | $1,644.98 |
Public Works | Construc Costs-Traffic Signals | TECHNOLOGY CONSTRUCTORS INC | 20th Avenue & Pierce Street | | 7/27/2017 | $40,413.52 |
Public Works | Construc Costs-Traffic Signals | TECHNOLOGY CONSTRUCTORS INC | 20th Avenue & Pierce Street | | 9/6/2017 | $166,082.16 |
Public Works | Construc Costs-Traffic Signals | TECHNOLOGY CONSTRUCTORS INC | 20th Avenue & Pierce Street | | 10/19/2017 | $56,070.68 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | velocity intersection kit | | 10/25/2017 | $26,000.00 |
Public Works | Construc Costs-Traffic Signals | TECHNOLOGY CONSTRUCTORS INC | 20th Avenue & Pierce Street | | 11/30/2017 | $8,713.51 |
Public Works | Construc Costs-Traffic Signals | TECHNOLOGY CONSTRUCTORS INC | 20th Avenue & Pierce Street | | 12/28/2017 | $7,895.25 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | Video Imaging & Radar Vehicle | | 1/11/2018 | $431,079.20 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | Ethernet Communication Modules | | 1/11/2018 | $32,812.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. 3 | | 3/15/2018 | $17,841.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. 3 | | 3/15/2018 | $1,645.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. 3 | | 3/15/2018 | $1,450.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | Edge 2 Processors | | 4/19/2018 | $17,959.50 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | WDR Cameras | | 4/19/2018 | $8,970.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,556.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,944.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,752.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,419.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,443.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,580.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,524.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $4,386.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,496.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $4,730.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,853.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $2,810.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $3,122.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,752.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,632.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $4,191.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $4,234.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $800.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | $1,752.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | ($800.00) |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 6/28/2018 | ($1,752.00) |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/3/2018 | $800.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 7/3/2018 | $1,752.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | R920 solar engine | | 8/16/2018 | $3,122.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | batteries | | 8/16/2018 | $176.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | lightbar wiring harness | | 8/16/2018 | $260.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | lightbars | | 8/16/2018 | $2,204.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | PED button wiring harness | | 8/16/2018 | $120.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | PED button stations | | 8/16/2018 | $310.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | post top mount | | 8/16/2018 | $230.00 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | 15' pedestal pole, base collar | | 8/16/2018 | $1,100.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $2,636.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $5,186.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $4,056.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $1,920.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $3,636.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $2,367.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $2,200.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $1,499.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $1,958.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $15,385.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 8/16/2018 | $23,176.99 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 10/18/2018 | $7,424.66 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 10/18/2018 | $5,851.44 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Renewal No. Four | | 10/18/2018 | $4,402.00 |
Public Works | Construc Costs-Traffic Signals | DESIGNSCAPES COLORADO INC | AGRMNT #4431 SOD REPLACEMENT | | 11/1/2018 | $19,274.41 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $630.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $3,456.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $1,340.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $308.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $1,078.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Construction | | 12/5/2018 | $5,496.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $120.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $2,964.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $2,730.91 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $525.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $1,009.08 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $60.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/5/2019 | $2,394.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Improvements | | 10/22/2019 | $27,276.63 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $1,125.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $3,600.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $5,459.43 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $5,677.75 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $6,863.55 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $9,520.95 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $7,203.25 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $3,439.99 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $10,291.19 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $492.26 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $2,583.52 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $7,786.37 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $6,527.60 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $2,208.12 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $1,045.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $1,810.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $3,592.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $9,393.94 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $11,032.86 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $12,722.74 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $7,275.75 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 11/25/2019 | $540.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/17/2019 | $1,417.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/17/2019 | $766.85 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/17/2019 | $586.85 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/17/2019 | $380.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/17/2019 | $3,677.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/18/2019 | $4,634.41 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $300.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $270.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $3,014.81 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $4,570.70 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $5,054.91 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $6,125.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $1,057.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 1/22/2020 | $3,211.36 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $612.32 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $1,654.34 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $398.30 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $270.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $1,260.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $193.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 2/25/2020 | $220.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Improvements | | 3/5/2020 | $110,206.65 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Improvements | | 4/8/2020 | $268,849.10 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | CO 1 Add' Scope | | 4/8/2020 | $15,968.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Upgrades Per | | 6/8/2020 | $33,990.48 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $10,206.11 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $5,161.83 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $180.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $591.13 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $11,203.66 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $190.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $237.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $190.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $190.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $47.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $95.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $332.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $190.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $1,335.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 7/30/2020 | $7,249.18 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $380.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $70,354.31 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $24,407.07 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $285.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $285.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/3/2020 | $3,276.07 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Upgrades Per | | 8/4/2020 | $86,869.21 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Improvements | | 8/13/2020 | $394,087.30 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | CO 2 Add'l Work | | 8/13/2020 | $4,927.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | CO 3 | | 8/13/2020 | $24,927.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 8/18/2020 | $7,564.43 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 8/18/2020 | $22,659.56 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 8/18/2020 | $12,652.30 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Upgrades Per | | 9/9/2020 | $39,626.26 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 9/10/2020 | $7,492.17 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 9/10/2020 | $5,208.08 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 9/10/2020 | $505.08 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 9/10/2020 | $95.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Improvements | | 9/17/2020 | $42,960.14 |
Public Works | Construc Costs-Traffic Signals | STONE SECURITY LLC | City Wide Security Camera | | 9/24/2020 | $1,608.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 10/14/2020 | $180.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 10/14/2020 | $585.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 10/14/2020 | $2,800.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 10/14/2020 | $4,784.13 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $296.90 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $360.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $6,567.77 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $1,384.37 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $1,307.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $47.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $47.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/14/2020 | $47.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 10/15/2020 | $1,245.00 |
Public Works | Construc Costs-Traffic Signals | XCEL ENERGY | electricity | | 11/6/2020 | $899.50 |
Public Works | Construc Costs-Traffic Signals | XCEL ENERGY | XFMR UNION AND FLORIDA | | 11/9/2020 | $12,236.74 |
Public Works | Construc Costs-Traffic Signals | XCEL ENERGY | TRAFFIC SIGNAL UNION/SERE | | 11/9/2020 | $15,236.74 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 11/18/2020 | $6,091.25 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 11/18/2020 | $531.88 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 11/18/2020 | $2,700.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Upgrades Per | | 12/2/2020 | $94,572.46 |
Public Works | Construc Costs-Traffic Signals | GADES SALES COMPANY | Eagle M Cabinet | | 12/3/2020 | $8,860.00 |
Public Works | Construc Costs-Traffic Signals | ECONOLITE CONTROL PRODUCTS INC | CABTBD Lkwd TS2-1 P44 | | 12/8/2020 | $21,490.00 |
Public Works | Construc Costs-Traffic Signals | ECONOLITE CONTROL PRODUCTS INC | Tariff | | 12/8/2020 | $165.38 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/8/2020 | $1,400.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/8/2020 | $1,733.64 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $780.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Per Agreement 4536 | | 12/8/2020 | $195.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $540.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $90.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $1,240.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $2,460.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $3,219.07 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $1,252.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $2,140.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $100.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 12/8/2020 | $780.00 |
Public Works | Construc Costs-Traffic Signals | AM SIGNAL INC | Signal Equipment | | 1/11/2021 | $1,231.00 |
Public Works | Construc Costs-Traffic Signals | AM SIGNAL INC | PO 10591 Inv M24945 Traffic Si | | 1/11/2021 | $5,211.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 1/14/2021 | $260.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 1/14/2021 | $809.38 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 1/14/2021 | $2,948.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Traffic Signal Upgrades Per | | 2/18/2021 | $3,794.17 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $824.68 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $180.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $360.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $1,724.37 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $180.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | USE THIS ACCOUNT | | 3/4/2021 | $7,097.50 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Construc Costs-Traffic Signals | | 3/17/2021 | $380.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-GS2 | | 3/24/2021 | $10,145.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS2-RMB | | 3/24/2021 | $35.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-PFM | | 3/24/2021 | $3,200.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS2-TS2-OPT | | 3/24/2021 | $35.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-C12 | | 3/24/2021 | $165.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-SMK | | 3/24/2021 | $3,450.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-CAT5 | | 3/24/2021 | $470.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-PFM+ | | 3/24/2021 | $4,400.00 |
Public Works | Construc Costs-Traffic Signals | ALTITUDE SIGNAL LLC | GS-3-TEN | | 3/24/2021 | $155.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Construc Costs-Traffic Signals | | 5/13/2021 | $805.00 |
Public Works | Construc Costs-Traffic Signals | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | Construc Costs-Traffic Signals | | 5/13/2021 | $4,504.31 |
Public Works | Construc Costs-Traffic Signals | ECONOLITE CONTROL PRODUCTS INC | Qty 2 CABTBD Lkwd TS2-1 P44 | | 5/26/2021 | $21,490.00 |
Public Works | Construc Costs-Traffic Signals | ECONOLITE CONTROL PRODUCTS INC | Tariff | | 5/26/2021 | $165.38 |