Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 1/14/2011 | $1,559.75 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 1/14/2011 | $3,447.75 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 2/17/2011 | $2,416.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 2/17/2011 | $3,169.75 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | PROFESSIONAL SERV JAN-FEB | | 3/9/2011 | $1,891.50 |
Public Works | Consulting Costs-Open Chan sys | FELSBURG HOLT & ULLEVIG INC | PROFESSIONAL SERVICES FOR FEB | | 3/22/2011 | $910.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 4/7/2011 | $323.75 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 4/7/2011 | $619.75 |
Public Works | Consulting Costs-Open Chan sys | FELSBURG HOLT & ULLEVIG INC | MARCH PROFESSIONAL SERVICES | | 4/12/2011 | $130.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 5/5/2011 | $221.75 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | PROF SERV FOR APRIL | | 5/9/2011 | $108.50 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 5/18/2011 | $605.75 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 5/18/2011 | $2,769.50 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 6/29/2011 | $266.11 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 6/29/2011 | $449.75 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 9/1/2011 | $1,031.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 10/27/2011 | $1,595.25 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 12/7/2011 | $4,725.72 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 12/16/2011 | $394.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 1/26/2012 | $7,676.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 1/26/2012 | $5,425.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 2/22/2012 | $11,400.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 2/22/2012 | $1,384.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Easement Exhibits - Lkwd Gulch | | 3/1/2012 | $1,596.25 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 3/15/2012 | $18,716.33 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 3/15/2012 | $1,485.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 4/5/2012 | $16,907.90 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 5/16/2012 | $3,360.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 5/16/2012 | $2,892.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 5/16/2012 | $2,101.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 6/20/2012 | $1,001.62 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Engineering Services for | | 6/20/2012 | $2,250.43 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 6/20/2012 | $692.57 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#1 Add'l Work | | 7/10/2012 | $1,373.59 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#1 Add'l Work | | 7/12/2012 | $11,847.83 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 7/12/2012 | $304.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 7/12/2012 | $861.35 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Final Design of Improvements | | 8/9/2012 | $1,212.93 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 8/9/2012 | $238.07 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#1 Add'l Work | | 8/9/2012 | $819.62 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 9/13/2012 | $1,384.16 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 9/13/2012 | $1,889.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#1 Add'l Work | | 9/27/2012 | $732.33 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 9/27/2012 | $4,797.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 10/10/2012 | $2,812.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 10/18/2012 | $3,068.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 10/25/2012 | $587.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO #1 Add'l SOW | | 11/15/2012 | $943.42 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO#1 Add' Sow | | 11/15/2012 | $883.41 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO#1 Add' Sow | | 11/15/2012 | $1,858.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 11/15/2012 | $197.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#1 Add'l Work | | 11/28/2012 | $760.14 |
Public Works | Consulting Costs-Open Chan sys | URBAN DRAINAGE & FLOOD CONTROL DISTRICT | DRY GULCH OUTFALL SYSTEMS | | 11/28/2012 | $64,000.00 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-10TH & SAULSB | | 12/18/2012 | $3,358.50 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-10TH & SAULSB | | 12/18/2012 | $503.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO#1 Add' Sow | | 12/19/2012 | $1,438.50 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#2 Add'l Work | | 1/17/2013 | $4,309.01 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-10TH & SAULSB | | 1/18/2013 | $639.00 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-10TH & SAULSB | | 1/18/2013 | $697.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#2 Add'l Work | | 2/21/2013 | $4,935.75 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-DRY GULCH AT | | 2/21/2013 | $838.00 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING-DRY GULCH AT | | 2/21/2013 | $1,058.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO#2 Add'l Work | | 3/14/2013 | $577.73 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #3 FInal Design Drawings | | 3/14/2013 | $236.49 |
Public Works | Consulting Costs-Open Chan sys | OLSSON INC | WEIR GULCH CHANNEL IMPROVEMENT | | 3/14/2013 | $1,750.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #3 FInal Design Drawings | | 4/11/2013 | $148.07 |
Public Works | Consulting Costs-Open Chan sys | JON H SORENSEN - STORMGROUP | NORTH DRY GULCH FUNDING | | 4/18/2013 | $7,032.50 |
Public Works | Consulting Costs-Open Chan sys | ERO RESOURCES CORPORATION | CONSULTING-FLOWER ST CULVERT | | 5/13/2013 | $346.17 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 5/22/2013 | $977.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #3 FInal Design Drawings | | 7/3/2013 | $7,536.58 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #3 FInal Design Drawings | | 8/21/2013 | $166.86 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 8/21/2013 | $1,850.14 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 8/29/2013 | $3,907.00 |
Public Works | Consulting Costs-Open Chan sys | JON H SORENSEN - STORMGROUP | NORTH DRY GULCH FUNDING | | 10/16/2013 | $2,900.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 10/21/2013 | $806.00 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | PO3184 225604, 227447, 225603, | | 10/22/2013 | $5,293.50 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 11/21/2013 | $1,106.99 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 1/13/2014 | $722.29 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 2/6/2014 | $6,772.46 |
Public Works | Consulting Costs-Open Chan sys | JON H SORENSEN - STORMGROUP | NORTH DRY GULCH FUNDING | | 2/27/2014 | $1,377.50 |
Public Works | Consulting Costs-Open Chan sys | JON H SORENSEN - STORMGROUP | add'l amt added per VCasteel | | 2/27/2014 | $72.50 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 3/10/2014 | $562.06 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 3/18/2014 | $1,569.00 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 4/2/2014 | $468.91 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 5/22/2014 | $105.83 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Proposal to provide easement | | 5/29/2014 | $296.75 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIALS TESTING | | 6/24/2014 | $289.00 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING | | 7/23/2014 | $1,679.50 |
Public Works | Consulting Costs-Open Chan sys | LEFT HAND EXCAVATING | REPLACE BRIDGE LAKEWOOD GULCH | | 7/29/2014 | $2,950.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | CO#1 Add' Sow | | 8/21/2014 | $2,200.09 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | Add'l Funds ok per VC | | 8/21/2014 | $552.91 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING | | 8/22/2014 | $1,971.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 10/6/2014 | $4,472.75 |
Public Works | Consulting Costs-Open Chan sys | KENNEDY / JENKS CONSULTANTS INC | CO #4 - Revise Final Drawings | | 10/9/2014 | $781.77 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING | | 11/21/2014 | $1,530.00 |
Public Works | Consulting Costs-Open Chan sys | LEFT HAND EXCAVATING | BRIDGE WORK LAKEWOOD GULCH | | 12/4/2014 | $2,064.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Preparation of Conditional | | 12/9/2014 | $19,748.25 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Add'l SOW ok per AH | | 12/9/2014 | $7,884.60 |
Public Works | Consulting Costs-Open Chan sys | A G WASSENAAR INC | MATERIAL TESTING | | 2/20/2015 | $1,313.00 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Add'l SOW ok per AH | | 3/12/2015 | $5,621.88 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Add'l SOW ok per AH | | 6/3/2015 | $670.13 |
Public Works | Consulting Costs-Open Chan sys | OLSSON INC | PREPERATION OF LEGAL EXHIBITS | | 6/24/2015 | $1,350.00 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 2/11/2016 | $1,249.52 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 3/17/2016 | $3,169.50 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 5/12/2016 | $7,707.50 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 5/26/2016 | $13,142.00 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 6/16/2016 | $2,908.59 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 7/14/2016 | $6,111.75 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 8/18/2016 | $9,494.82 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 10/6/2016 | $6,000.00 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Design Services | | 12/1/2016 | $61.32 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Add'l SOW Per Amend 1 | | 12/1/2016 | $21,679.38 |
Public Works | Consulting Costs-Open Chan sys | HC PECK & ASSOCIATES INC | Relocation Feasibility Study | | 12/15/2016 | $1,763.10 |
Public Works | Consulting Costs-Open Chan sys | WEST TERRA INC | Preliminary Property | | 12/15/2016 | $6,000.00 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Add'l SOW Per Amend 1 | | 12/22/2016 | $5,211.00 |
Public Works | Consulting Costs-Open Chan sys | HC PECK & ASSOCIATES INC | Relocation Feasibility Study | | 12/28/2016 | ($1,763.10) |
Public Works | Consulting Costs-Open Chan sys | H C PECK & ASSOCIATES INC | Relocation Feasibility Study | | 12/29/2016 | $1,763.10 |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Inv 500998-05 pd from PO 469 | | 12/29/2016 | ($3,907.00) |
Public Works | Consulting Costs-Open Chan sys | WHPACIFIC INC | Add'l SOW ok per AH | | 12/29/2016 | $5,284.39 |
Public Works | Consulting Costs-Open Chan sys | URBAN DRAINAGE & FLOOD CONTROL DISTRICT | 2016 CONTRACT EXPENSE | | 1/12/2017 | $50,000.00 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Add'l SOW Per Amend 1 | | 2/16/2017 | $1,719.62 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 5/18/2017 | $1,287.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 5/25/2017 | $3,540.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 5/25/2017 | $11,856.50 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 6/15/2017 | $2,076.90 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 8/2/2017 | $921.57 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 8/17/2017 | $6,770.62 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 9/14/2017 | $3,129.81 |
Public Works | Consulting Costs-Open Chan sys | ICON ENGINEERING INC | Amendment Two | | 11/2/2017 | $286.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 2/15/2018 | $210.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 3/20/2018 | $4,850.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 4/19/2018 | $933.00 |
Public Works | Consulting Costs-Open Chan sys | URBAN DRAINAGE & FLOOD CONTROL DISTRICT | DRY GULCH @ LAMAR STREET | | 5/17/2018 | $67,800.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 5/17/2018 | $1,009.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 6/21/2018 | $1,393.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 9/20/2018 | $4,063.65 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 11/20/2018 | $4,239.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 12/12/2018 | $4,063.25 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch Closed | | 1/24/2019 | $2,202.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 3/21/2019 | $10,726.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 4/16/2019 | $13,132.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 4/16/2019 | $9,131.40 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 5/30/2019 | $6,656.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 6/19/2019 | $2,138.55 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 8/22/2019 | $2,524.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 9/19/2019 | $4,984.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 10/8/2019 | $4,208.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 10/8/2019 | $6,099.50 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 12/10/2019 | $320.00 |
Public Works | Consulting Costs-Open Chan sys | MULLER ENGINEERING CO INC | North Dry Gulch - Additional | | 2/11/2020 | $3,351.50 |