Public Works | Consulting Costs-Sidewalks | SEH | 2009 SIDEWALK PROGRAM PHASE II | | 1/7/2010 | $8,662.50 |
Public Works | Consulting Costs-Sidewalks | OLSSON INC | 2009 - OA PROJECT NO. 009-2300 | | 1/8/2010 | $1,600.00 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | 2009 PROF SERV-PROJ #09-130-01 | | 1/20/2010 | $312.85 |
Public Works | Consulting Costs-Sidewalks | SEH | 2009 SURVEY WORK-SIDEWALK PROG | | 1/21/2010 | $4,775.75 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | 2009 Alameda Trail Bike Path | | 1/21/2010 | $673.75 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | 2009 Eng Design Svcs-Wads/Weir | | 1/21/2010 | $1,494.00 |
Public Works | Consulting Costs-Sidewalks | WOOLPERT | 2009 Alameda Bikepath Project | | 1/21/2010 | $866.56 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | 2009 PROF SERV C-470 BIKEPATH | | 1/28/2010 | $114.00 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Alameda Bikepath reconstructio | | 1/28/2010 | $1,600.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | 2009 wads & Weir Gulch CDOT | | 2/11/2010 | $1,076.25 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Environmental Services | | 2/24/2010 | $232.50 |
Public Works | Consulting Costs-Sidewalks | WOOLPERT | Alameda Bikepath Project | | 2/24/2010 | $726.72 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Engineering Design Services | | 3/4/2010 | $2,469.50 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Engineering Design Services | | 3/16/2010 | $69.50 |
Public Works | Consulting Costs-Sidewalks | MARTIN MARTIN INC | 2009 Sidewalk & Bike Path Proj | | 3/18/2010 | $2,530.80 |
Public Works | Consulting Costs-Sidewalks | WOOLPERT | Alameda Bikepath Project | | 4/8/2010 | $513.47 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 4/15/2010 | $501.25 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Engineering Design Services | | 4/15/2010 | $1,181.50 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 4/29/2010 | $669.40 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 4/29/2010 | $150.08 |
Public Works | Consulting Costs-Sidewalks | UTILITY LOCATING & MAPPING | Utility Potholing Services | | 5/13/2010 | $780.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 5/19/2010 | $2,708.20 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEY FOR SIDEWALK PROJECT | | 5/24/2010 | $372.57 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEYS ON PROJECTS | | 5/27/2010 | $1,226.25 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEYS ON PROJECTS | | 5/27/2010 | $2,213.29 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | SURVEY WORK FOR SIDEWALK PROJ | | 6/16/2010 | $2,964.29 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | SURVEY WORK ON SIDEWALK PROJ. | | 6/16/2010 | $312.50 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 6/22/2010 | $3,379.32 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 6/22/2010 | $329.25 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 7/12/2010 | $1,659.56 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TEST WEIR GULCH | | 7/19/2010 | $326.00 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEY FOR SIDEWALK PROJECT | | 7/26/2010 | $689.75 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEY ON WADSWORTH SIDEWALKS | | 7/26/2010 | $744.25 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROFESSIONAL SERVICES | | 7/26/2010 | $187.50 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROF. SERV. 6TH & ARBUTUS | | 7/27/2010 | $3,426.20 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROFESSIONAL SERV 6TH& ARBUTUS | | 8/12/2010 | $562.50 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Engineering Design Services | | 8/12/2010 | $810.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 9/1/2010 | $153.75 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | 14TH & AMES ST. MATERIALS TEST | | 9/23/2010 | $558.00 |
Public Works | Consulting Costs-Sidewalks | STATE OF COLORADO DPA | STORMWATER BILLING FOR C-470 B | | 9/23/2010 | $245.00 |
Public Works | Consulting Costs-Sidewalks | SEH | LAKEWOOD SMALL SURVEYS | | 9/29/2010 | $1,874.75 |
Public Works | Consulting Costs-Sidewalks | SEH | EASEMENT REVIEW-SIDEWALK PROG | | 9/29/2010 | $1,939.00 |
Public Works | Consulting Costs-Sidewalks | MARTIN MARTIN INC | 2009 City Sidewalks and Bike | | 9/30/2010 | $270.00 |
Public Works | Consulting Costs-Sidewalks | GEOCAL INC | JULY PROFESSIONAL SERVICES | | 10/7/2010 | $452.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 10/14/2010 | $998.75 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Change Order 1 Addl Services | | 10/21/2010 | $247.50 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 10/21/2010 | $3,547.53 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 10/21/2010 | $2,348.04 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 10/21/2010 | $597.92 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 10/28/2010 | $129.78 |
Public Works | Consulting Costs-Sidewalks | COLORADO BORING CO LLC | Obtain Subsurface Utility | | 11/5/2010 | $5,200.00 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | OCT PROFESSIONAL SERVICES | | 11/15/2010 | $250.18 |
Public Works | Consulting Costs-Sidewalks | WOOLPERT | Alameda Bikepath Project | | 12/9/2010 | $1,324.93 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROFESSIONAL SERV. FOR NOV. | | 12/14/2010 | $62.50 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Change Order 1 Addl Services | | 12/16/2010 | $509.68 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 12/16/2010 | $15.07 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROF. SERVICES FOR NOVEMBER | | 12/17/2010 | $250.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 12/20/2010 | $1,099.40 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPROVEMENTS | | 12/20/2010 | $141.05 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | ALAMEDA BIKEPATH IMPRVMNT eval | | 12/20/2010 | $1,250.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING ON PROJECT | | 12/20/2010 | $1,200.00 |
Public Works | Consulting Costs-Sidewalks | SEH | STAKING ON SIDEWALK PROJECT | | 12/22/2010 | $479.00 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | 2010 PROF SERV FOR DECEMBER | | 1/12/2011 | $1,230.00 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | 2010 PROF SERV FOR DECEMBER | | 1/12/2011 | $125.00 |
Public Works | Consulting Costs-Sidewalks | SEH | 2010 SURVEY SIDEWALK PHASE II | | 1/26/2011 | $1,117.50 |
Public Works | Consulting Costs-Sidewalks | SEH | 2010 SURVEY ON PROJECT | | 1/26/2011 | $340.00 |
Public Works | Consulting Costs-Sidewalks | MARTIN MARTIN INC | 2010 ENGINEERING SERV THRU DEC | | 1/27/2011 | $405.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 2/10/2011 | $472.61 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROF SERV-JAN-6TH & ARBUTUS | | 2/23/2011 | $62.50 |
Public Works | Consulting Costs-Sidewalks | FELSBURG HOLT & ULLEVIG INC | PROF SERV-JAN-WADSWORTH WALL | | 2/23/2011 | $125.00 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEYS FOR CDBG SIDEWALK PROJ | | 2/23/2011 | $1,596.65 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | 2010 MATERIAL TESTING | | 3/23/2011 | $1,860.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | 2010 MATERIAL TESTING | | 3/23/2011 | $389.50 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials Testing PO #1111 | | 4/26/2011 | $2,658.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 4/26/2011 | $2,303.00 |
Public Works | Consulting Costs-Sidewalks | SEH | 2011 SURVEYS ON PROJECTS | | 5/24/2011 | $602.50 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TEST 2010 BIKE PATH | | 5/24/2011 | $1,728.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TEST 13TH AVE SEWER L | | 5/24/2011 | $2,144.00 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 6/16/2011 | $4,787.69 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials Testing PO 1111 | | 6/20/2011 | $334.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials Testing PO 1111 | | 6/20/2011 | $395.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials Testing PO 1111 | | 6/20/2011 | $2,081.00 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 6/29/2011 | $1,418.66 |
Public Works | Consulting Costs-Sidewalks | SEH | Acct# chg per steste | | 7/7/2011 | $564.50 |
Public Works | Consulting Costs-Sidewalks | SEH | SURVEY FOR SIDEWALK PROGRAM | | 8/24/2011 | $2,055.09 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TEST 2011 SIDEWALKS P | | 8/29/2011 | $568.00 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 9/8/2011 | $1,599.01 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 9/8/2011 | $538.64 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 9/8/2011 | $2,223.61 |
Public Works | Consulting Costs-Sidewalks | GEOCAL INC | PROFESSIONAL SERV FOR JUNE | | 9/9/2011 | $145.50 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Sidewalk Material Testing PO # | | 9/20/2011 | $2,783.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TEST ON SIDEWALK PRO | | 9/20/2011 | $2,438.00 |
Public Works | Consulting Costs-Sidewalks | GEOCAL INC | PROFESSIONAL SERVICES FOR JULY | | 9/23/2011 | $374.00 |
Public Works | Consulting Costs-Sidewalks | SEH | Acct # chg per VC | | 9/29/2011 | $2,550.93 |
Public Works | Consulting Costs-Sidewalks | UTILITY LOCATING & MAPPING | Utility Potholing Services | | 9/29/2011 | $1,660.00 |
Public Works | Consulting Costs-Sidewalks | SEH | Surveyor Services Add'l work | | 9/29/2011 | $514.13 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Compaction Material Testing PO | | 10/11/2011 | $5,363.25 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Material Testing Sidewalk/Bike | | 10/11/2011 | $3,302.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 10/27/2011 | $312.32 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 10/27/2011 | $101.43 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | Material Testing Services | | 11/3/2011 | $374.96 |
Public Works | Consulting Costs-Sidewalks | SEH | Surveyor Services | | 11/3/2011 | $5,144.27 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials testing-sidewalks & | | 11/17/2011 | $423.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials testing-sidewalks & | | 11/17/2011 | $1,068.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING ON SIDEWALK P | | 11/17/2011 | $1,412.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 12/15/2011 | $722.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 1/25/2012 | $318.71 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials testing-sidewalks & | | 1/25/2012 | $253.00 |
Public Works | Consulting Costs-Sidewalks | SEH | Surveyor Services | | 1/26/2012 | $1,868.09 |
Public Works | Consulting Costs-Sidewalks | THE AGRICULTURAL DITCH & RESERVOIR CO | 2011 PED CROSS ARD/W VIRGINIA | | 1/26/2012 | $1,000.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | 2011 Sept/Nov Concrete Samplin | | 2/21/2012 | $1,144.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials testing-sidewalks & | | 3/1/2012 | $1,417.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Materials testing-sidewalks & | | 3/1/2012 | $640.00 |
Public Works | Consulting Costs-Sidewalks | SEH | Acct # chg per VC 3/28/12 | | 3/28/2012 | $336.75 |
Public Works | Consulting Costs-Sidewalks | SEH | Surveyor Services | | 4/25/2012 | $2,484.18 |
Public Works | Consulting Costs-Sidewalks | SEH | Surveyor Services | | 4/25/2012 | $1,817.57 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 5/31/2012 | $525.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 5/31/2012 | $366.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 6/14/2012 | $571.00 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 6/20/2012 | $115.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 6/28/2012 | $1,952.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 6/28/2012 | $2,512.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING BIKEPATH PRO | | 9/18/2012 | $547.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING BIKEPATH PRO | | 9/18/2012 | $1,151.51 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING BIKEPATH PRO | | 9/18/2012 | $3,848.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING BIKEPATH PRO | | 9/18/2012 | $638.50 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 11/20/2012 | $392.86 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 11/20/2012 | $418.47 |
Public Works | Consulting Costs-Sidewalks | ERO RESOURCES CORPORATION | Wetlands Monitoring-Weir Gulch | | 11/20/2012 | $390.15 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING ON SIDEWALK P | | 12/18/2012 | $1,028.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING-SIDEWALK PROJ | | 12/18/2012 | $459.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING-SIDEWALK PROJ | | 12/18/2012 | $1,189.00 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | SURVEY FOR 246 UNION | | 1/10/2013 | $2,078.75 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING-SIDEWALK PROJ | | 2/21/2013 | $2,886.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING-SIDEWALK PROJ | | 2/21/2013 | $1,899.00 |
Public Works | Consulting Costs-Sidewalks | MEP ENGINEERING INC | STATION LIGHTING 260 UNION | | 5/7/2013 | $2,000.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING-2012 SIDEWALK | | 5/21/2013 | $3,577.00 |
Public Works | Consulting Costs-Sidewalks | JPM AND ASSOCIATES, LLC | STAKING-CAD WORK 11TH & JAY | | 12/17/2013 | $927.20 |
Public Works | Consulting Costs-Sidewalks | BROWNS HILL ENGINEERING & CONTROLS, LLC | 2013 SERV WORK FOR WEIR GULCH | | 1/28/2014 | $246.25 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING | | 2/24/2014 | $880.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING | | 4/21/2014 | $311.00 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W RAIL STATION SIDEWALKS | | 5/1/2014 | $15,942.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 6/24/2014 | $1,307.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIALS TESTING | | 6/24/2014 | $1,206.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING | | 7/23/2014 | $1,679.50 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | REIMBURSEMENT-CHARGED TWICE | | 8/22/2014 | ($1,679.50) |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalks | | 9/4/2014 | $1,342.25 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalks | | 11/6/2014 | $157.75 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalk Survey | | 11/6/2014 | $376.00 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalk Survey | | 11/6/2014 | $402.75 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | SURVEY ON PIERCE SIDEWALK PROJ | | 11/18/2014 | $4,090.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | MATERIAL TESTING | | 11/21/2014 | $796.00 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalk Survey | | 1/29/2015 | $721.25 |
Public Works | Consulting Costs-Sidewalks | SHORT ELLIOTT HENDRICKSON INC | W Rail Station Sidewalk Survey | | 1/29/2015 | $1,907.75 |
Public Works | Consulting Costs-Sidewalks | WEST TERRA INC | 2014 Station Access Project | | 2/12/2015 | $6,000.00 |
Public Works | Consulting Costs-Sidewalks | KINESIS LLC | Station Access Project-2014 | | 5/19/2015 | $3,764.00 |
Public Works | Consulting Costs-Sidewalks | INTUIT QB FINANCE SW | STATION ACCESS | | 5/22/2015 | $375.00 |
Public Works | Consulting Costs-Sidewalks | MEP ENGINEERING INC | OAK ST SIDEWALK LIGHING DESIGN | | 6/2/2015 | $1,500.00 |
Public Works | Consulting Costs-Sidewalks | D & M UTILITY SERVICES LLC | POTHOLING-FIRST AVE SIDEWALK | | 7/8/2015 | $2,000.00 |
Public Works | Consulting Costs-Sidewalks | GORDON SIGN | SIGN RELOCATION | | 7/21/2015 | $796.11 |
Public Works | Consulting Costs-Sidewalks | CLAYTON AND COMPANY INC | '14 Station Access Project | | 8/20/2015 | $8,500.00 |
Public Works | Consulting Costs-Sidewalks | WEST TERRA INC | Parcel Appraisal for West 1st | | 12/3/2015 | $5,250.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 4/21/2016 | $669.44 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 4/21/2016 | $4,936.21 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 5/12/2016 | $5,099.75 |
Public Works | Consulting Costs-Sidewalks | KUMAR & ASSOCIATES INC | Geotechnical Engineering Study | | 5/19/2016 | $3,636.75 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 6/9/2016 | $8,923.49 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 6/9/2016 | $3,175.14 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 6/16/2016 | $11,477.03 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 6/16/2016 | $1,504.60 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Quality Control Testing & | | 7/7/2016 | $1,427.50 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 7/7/2016 | $513.35 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 8/4/2016 | $3,528.36 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 8/11/2016 | $1,710.34 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 8/11/2016 | $1,582.17 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 8/11/2016 | $7,486.45 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 8/25/2016 | $572.13 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 8/25/2016 | $879.89 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 9/7/2016 | $5,894.27 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 9/8/2016 | $3,236.42 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 9/8/2016 | $699.27 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Quality Control Testing & | | 9/14/2016 | $469.50 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Quality Control Testing & | | 9/14/2016 | $9,922.50 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 10/13/2016 | $362.46 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 801,865,825 Sher. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 895 Sherid. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 679 Sherid. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 955, 965 Sher. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 903 Sherid. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 747 Sherid. Blvd. | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 935 Sherid. Blvd | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | 5200 W. 9th St. | | 10/17/2016 | $500.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Quality Control Testing & | | 11/3/2016 | $147.50 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 11/3/2016 | $81.00 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 11/9/2016 | $12,270.15 |
Public Works | Consulting Costs-Sidewalks | MEP ENGINEERING INC | ELECTRICAL PROF ENG SERV | | 11/28/2016 | $4,500.00 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Amendment No. 1 - Structural | | 12/15/2016 | $31,686.99 |
Public Works | Consulting Costs-Sidewalks | KUMAR & ASSOCIATES INC | Geotechnical Engineering Study | | 12/29/2016 | $3,805.13 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 12/29/2016 | $311.88 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 12/29/2016 | $883.23 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Hydraulic Design Services - | | 1/26/2017 | $8,376.22 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Amendment No. 1 - Structural | | 1/26/2017 | $1,706.15 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 1/26/2017 | $403.19 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 1/26/2017 | $257.33 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Amendment No. 1 - Structural | | 2/15/2017 | $817.62 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 3/8/2017 | $678.42 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 3/9/2017 | $7,009.30 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Amendment No. 1 - Structural | | 3/15/2017 | $1,789.16 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 3/30/2017 | $7,198.36 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 4/6/2017 | $2,277.64 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 4/27/2017 | $2,901.75 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 5/3/2017 | $306.64 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 5/3/2017 | $2,858.43 |
Public Works | Consulting Costs-Sidewalks | H C PECK & ASSOCIATES INC | 6 TITLE COMMITMENTS W-LINE | | 5/15/2017 | $3,583.67 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 5/18/2017 | $2,407.00 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 6/8/2017 | $205.95 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 6/8/2017 | $170.04 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 6/8/2017 | $4,703.07 |
Public Works | Consulting Costs-Sidewalks | WIGHT LATERAL DITCH | REIMBURSE LEGAL FEES | | 6/14/2017 | $360.00 |
Public Works | Consulting Costs-Sidewalks | PRO PIPE SERVICES 61 | CCTV SERVICE - 1 HOUR | | 6/21/2017 | $175.00 |
Public Works | Consulting Costs-Sidewalks | WEST TERRA INC | Sheridan Blvd Sidewalk Project | | 6/22/2017 | $15,000.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 7/13/2017 | $160.31 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 7/13/2017 | $1,160.25 |
Public Works | Consulting Costs-Sidewalks | PRO PIPE SERVICES 61 | CLEANING AND VIDEO FOR PIPE CO | | 7/24/2017 | $195.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 8/3/2017 | $1,725.50 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | Amendment No. 1 - Structural | | 8/17/2017 | $999.43 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 8/17/2017 | $232.42 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 8/17/2017 | $208.25 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 9/21/2017 | $205.88 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 10/4/2017 | $511.47 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 11/29/2017 | $994.68 |
Public Works | Consulting Costs-Sidewalks | SEH | 13th Ave Multi-Use Path | | 11/29/2017 | $6,161.52 |
Public Works | Consulting Costs-Sidewalks | SEH | CO #1 Add'l Work | | 11/29/2017 | $147.34 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 11/29/2017 | $714.00 |
Public Works | Consulting Costs-Sidewalks | WIGHT LATERAL DITCH | PAYMENT OF ATTORNEY'S FEES | | 12/21/2017 | $795.00 |
Public Works | Consulting Costs-Sidewalks | SEH | CO #1 Add'l Work | | 12/21/2017 | $1,990.46 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | CO 1 Add'l Work | | 2/1/2018 | $6,092.94 |
Public Works | Consulting Costs-Sidewalks | WEST TERRA INC | 2017 APPRAISAL REVISION | | 2/5/2018 | $1,000.00 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | 13th Ave D-10 Multi Use Path | | 2/13/2018 | $321.56 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE CO -- NCS | UPDATED TITLE WORK | | 2/21/2018 | $300.00 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Related Services | | 2/22/2018 | $396.60 |
Public Works | Consulting Costs-Sidewalks | FIRST AMERICAN TITLE INSURANCE COMPANY | W LINE SHARED USE PATHS | | 4/26/2018 | $550.00 |
Public Works | Consulting Costs-Sidewalks | SEH | CO #1 Add'l Work | | 5/14/2018 | $252.07 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Related Services | | 5/17/2018 | $3,383.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Environmental Design Services | | 5/22/2018 | $95.16 |
Public Works | Consulting Costs-Sidewalks | ALESCO APPRAISAL INC | PROFESSIONAL SERVICES | | 7/11/2018 | $10,500.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 7/12/2018 | $461.25 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | CO 1 Add'l Work | | 8/16/2018 | $207.82 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL DITCH EVALUATION | | 10/10/2018 | $799.50 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 11/20/2018 | $492.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 3/7/2019 | $2,341.00 |
Public Works | Consulting Costs-Sidewalks | WIGHT LATERAL DITCH | LEGAL FEES FOR W LINE BIKEPATH | | 3/12/2019 | $575.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | PROFESSIONAL SERVICES | | 3/18/2019 | $6,036.50 |
Public Works | Consulting Costs-Sidewalks | HOFFMAN NIES DAVE LLP | REVIEW DITCH MODIFICATIONS | | 3/26/2019 | $720.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 4/11/2019 | $3,610.25 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 5/24/2019 | $3,395.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROFESSIONAL LEGAL SERVICES | | 5/24/2019 | $1,720.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 5/28/2019 | $690.25 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | ENVIRONMENTAL DESIGN ASSISTANC | | 5/30/2019 | $549.33 |
Public Works | Consulting Costs-Sidewalks | HOFFMAN NIES DAVE LLP | PROF SERVICES THROUGH MAY | | 6/18/2019 | $1,127.50 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | PROF CONSULTING SERVICES | | 6/24/2019 | $1,710.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | ENVIRONMENTAL DESIGN ASSISTANC | | 6/24/2019 | $1,059.67 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 7/11/2019 | $4,031.50 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services-Inv 16218 | | 7/17/2019 | $10,564.64 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LEGAL SERVICES | | 7/23/2019 | $90.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 7/24/2019 | $764.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 7/24/2019 | $1,736.25 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 8/8/2019 | $510.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | PROF CONSULTING SERVICES | | 8/28/2019 | $2,257.50 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | PROFESSIONAL SERVICES | | 9/18/2019 | $3,791.25 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services | | 9/26/2019 | $9,111.92 |
Public Works | Consulting Costs-Sidewalks | HOFFMAN NIES DAVE LLP | PROF SERVICES THROUGH AUG | | 10/9/2019 | $2,460.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 10/10/2019 | $278.75 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 10/10/2019 | $896.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | PROF CONSULTING SERVICES | | 10/29/2019 | $3,292.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THROUGH SEP | | 10/29/2019 | $4,240.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 10/29/2019 | $1,524.00 |
Public Works | Consulting Costs-Sidewalks | D & M UTILITY SERVICES LLC | Pothole Resotration | | 10/31/2019 | $10,710.00 |
Public Works | Consulting Costs-Sidewalks | LT ENVIRONMENTAL, INC. | ENVIRONMENTAL DESIGN SERVICES | | 12/12/2019 | $1,788.52 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | ENVIRONMENTAL DESIGN ASSISTANC | | 12/12/2019 | $772.53 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION SUPPL | | 12/12/2019 | $2,222.25 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THROUGH OCT | | 12/12/2019 | $560.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 12/12/2019 | $2,272.50 |
Public Works | Consulting Costs-Sidewalks | DENVER MUSEUM OF NATUR | LOCALITY SEARCH | | 12/13/2019 | $50.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THROUGH NOV | | 12/19/2019 | $1,435.00 |
Public Works | Consulting Costs-Sidewalks | HOFFMAN NIES DAVE LLP | PROF SERVICES THROUGH OCT | | 12/19/2019 | $3,300.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 12/19/2019 | $3,325.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | Wight Ditch Irrigation Supply | | 12/19/2019 | $524.75 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services | | 12/23/2019 | $2,552.88 |
Public Works | Consulting Costs-Sidewalks | HISTORY COLORADO | HISTORY RESEARCH | | 1/13/2020 | $20.00 |
Public Works | Consulting Costs-Sidewalks | RTD 2380 | W LINE PATH UTILITY FEE | | 1/14/2020 | $1,500.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 1/15/2020 | $360.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | 2019 WIGHT LATERAL ENG REVIEW | | 1/29/2020 | $330.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | 2019 PROF SERVICES THROUGH DEC | | 1/29/2020 | $980.00 |
Public Works | Consulting Costs-Sidewalks | BLOOD HOUND LLC | UTILITY INVESTIGATION | | 1/29/2020 | $2,025.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | 2019 WIGHT DITCH IRRIGATION | | 2/10/2020 | $920.75 |
Public Works | Consulting Costs-Sidewalks | HOFFMAN NIES DAVE LLP | 2019 PROF SERVICES THROUGH DEC | | 2/20/2020 | $270.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 2/25/2020 | $2,100.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THROUGH JAN | | 2/25/2020 | $600.00 |
Public Works | Consulting Costs-Sidewalks | MULLER ENGINEERING CO INC | PROF SERVICES DEC-JAN | | 2/25/2020 | $461.49 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION DITCH | | 3/18/2020 | $444.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THROUGH FEB | | 3/18/2020 | $225.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | LATERAL ENG REVIEW | | 3/18/2020 | $660.00 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services As Needed | | 3/19/2020 | $6,109.85 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services As Needed | | 3/19/2020 | $10,638.60 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services As Needed | | 3/26/2020 | $5,556.15 |
Public Works | Consulting Costs-Sidewalks | GROUND ENGINEERING CONSULTANTS INC | MSE Wall Project | | 4/15/2020 | $2,800.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 4/21/2020 | $930.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES | | 4/30/2020 | $1,275.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 6/11/2020 | $687.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES | | 6/11/2020 | $1,312.50 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION DITCH | | 6/11/2020 | $1,206.50 |
Public Works | Consulting Costs-Sidewalks | BLOOD HOUND LLC | LOCATING TEST HOLES | | 6/17/2020 | $5,795.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LHMWC PROF SERVICES | | 7/1/2020 | $187.50 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | SHERIDAN WALK, 6TH TO SHERIDAN | | 7/6/2020 | $12,655.69 |
Public Works | Consulting Costs-Sidewalks | BLOOD HOUND LLC | UTILITY TEST HOLES | | 7/16/2020 | $1,470.00 |
Public Works | Consulting Costs-Sidewalks | BLOOD HOUND LLC | UTILITY TEST HOLES | | 7/16/2020 | $1,470.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION DITCH | | 7/30/2020 | $1,001.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THRU JUNE 2020 | | 7/30/2020 | $2,550.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 7/30/2020 | $2,093.75 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 8/27/2020 | $3,630.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES THRU JULY 2020 | | 8/27/2020 | $637.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LH PROF SERVICES THRU JULY | | 8/27/2020 | $1,350.00 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Survey Services As Needed | | 8/27/2020 | $6,950.85 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | SHERIDAN WALK, 6TH TO SHERIDAN | | 8/28/2020 | $4,374.27 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 9/1/2020 | $561.42 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION DITCH | | 9/10/2020 | $589.50 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 9/10/2020 | $562.99 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL INC | Inv#296155 Enviro. Design Assi | | 9/14/2020 | $376.29 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES | | 10/1/2020 | $937.50 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | LATERAL IRRIGATION DITCH | | 10/1/2020 | $1,491.75 |
Public Works | Consulting Costs-Sidewalks | BLOOD HOUND LLC | LOCATING TEST HOLES | | 10/13/2020 | $1,375.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 10/15/2020 | $3,774.73 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 10/15/2020 | $480.60 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | SHERIDAN WALK, 6TH TO SHERIDAN | | 10/22/2020 | $1,618.55 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | WIGHT LATERAL IRRIGATION DITCH | | 11/12/2020 | $1,693.25 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LH PROF SERVICES THRU SEPT | | 11/12/2020 | $112.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES THRU SEPT | | 11/12/2020 | $1,125.00 |
Public Works | Consulting Costs-Sidewalks | W W WHEELER AND ASSOCIATES INC | PROFESSIONAL SERVICES FOR OCT | | 11/19/2020 | $589.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES THRU OCT | | 11/19/2020 | $1,087.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LH PROF SERVICES THRU OCT | | 11/19/2020 | $825.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 11/19/2020 | $593.75 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 11/19/2020 | $2,252.50 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | SHERIDAN WALK, 6TH TO SHERIDAN | | 12/17/2020 | $1,417.20 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 12/17/2020 | $925.30 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 12/17/2020 | $2,987.58 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 12/17/2020 | $1,958.33 |
Public Works | Consulting Costs-Sidewalks | ELECTRO-WIRE-COBRA GCG | Pull Box for W-Line Path Light | | 12/17/2020 | $183.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROFESSIONAL SERV NOV | | 12/30/2020 | $1,462.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROFESSIONAL SERV FOR NOV | | 12/30/2020 | $825.00 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | SHERIDAN WALK, 6TH TO SHERIDAN | | 12/30/2020 | $3,020.02 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | CO#1 - add'l Testing needed | | 12/30/2020 | $3,410.72 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 1/15/2021 | $157.98 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | 2020 WIGHT LATERAL ENG REVIEW | | 1/28/2021 | $812.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | 2020 WLD PROF SERVICE FOR DEC | | 1/28/2021 | $1,162.50 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | 2020 LH PROF SERVICES FOR DEC | | 1/28/2021 | $862.50 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 1/28/2021 | $2,878.88 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 1/28/2021 | $12,201.29 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 1/28/2021 | $4,997.99 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 2/1/2021 | $3,687.35 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 2/2/2021 | $2,101.53 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES JAN 2021 | | 2/23/2021 | $375.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LH PROF SERVICES JAN 2021 | | 3/4/2021 | $375.00 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WLD ENG REVIEW JAN 2021 | | 3/4/2021 | $1,375.00 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Acct # transfer per vincas | | 3/17/2021 | $431.66 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | PROF SERVICES FEB 2021 | | 3/24/2021 | $2,962.50 |
Public Works | Consulting Costs-Sidewalks | PETERSON COMPANY | ALUMINUM EXPANDED METAL FOR PR | | 4/2/2021 | $220.00 |
Public Works | Consulting Costs-Sidewalks | METAL SUPERMARKETS | ALUMINUM ANGLE FOR PROJECT | | 4/2/2021 | $366.71 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICES MARCH 2021 | | 4/20/2021 | $600.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | LH PROF SERVICES MARCH 2021 | | 4/20/2021 | $337.50 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 5/17/2021 | $157.98 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | WLD PROF SERVICE APRIL 2021 | | 5/27/2021 | $75.00 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 5/27/2021 | $1,213.54 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | W-LINE SHARED USE PATHS | | 6/3/2021 | $1,249.06 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | CO#1 agr 4675 W-Line Shared | | 6/3/2021 | $6,600.41 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 6/7/2021 | $1,115.56 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 6/7/2021 | $3,972.36 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Material Testing per agr4897 | | 6/9/2021 | $434.00 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Material Testing per agr4897 | | 6/9/2021 | $1,389.00 |
Public Works | Consulting Costs-Sidewalks | WELBORN SULLIVAN MECK & TOOLEY PC | 2021 LH PROF SERV FOR APRIL | | 6/10/2021 | $37.50 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Acct # adj per vincas | | 6/10/2021 | $1,061.74 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 6/17/2021 | $382.74 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 6/17/2021 | $260.61 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 6/17/2021 | $136.84 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WLD ENG REVIEW APRIL 2021 | | 6/28/2021 | $562.50 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Acct # adj per vincas | | 6/30/2021 | $4,346.05 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | CO#1 agr 4675 W-Line Shared | | 8/12/2021 | $1,917.99 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Inv17630 Alameda sidewalk | | 8/16/2021 | $278.23 |
Public Works | Consulting Costs-Sidewalks | PRECISION SURVEY & MAPPING INC | Inv#17631 Alameda Sidewalk | | 8/16/2021 | $1,131.75 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | CP#4 AGr 4675 W-Line Shared | | 8/26/2021 | $3,938.77 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | CO#1 agr 4675 W-Line Shared | | 9/9/2021 | $1,112.22 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | WIGHT LATERAL ENG REVIEW | | 9/9/2021 | $2,023.41 |
Public Works | Consulting Costs-Sidewalks | APPLEGATE GROUP INC | PROFESSIONAL SERVICES | | 10/6/2021 | $1,125.00 |
Public Works | Consulting Costs-Sidewalks | ARKANSAS VALLEY SEED | SEED FOR LAKEWOOD GULCH | | 11/17/2021 | $125.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 11/18/2021 | $294.82 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | Alameda Shared Use Path | | 11/18/2021 | $323.31 |
Public Works | Consulting Costs-Sidewalks | A G WASSENAAR INC | Material Testing -inv#339794 | | 1/13/2022 | $2,354.00 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | 1st Ave. Sidewalk | | 1/18/2022 | $174.47 |
Public Works | Consulting Costs-Sidewalks | PINYON ENVIRONMENTAL | add to 1st Ave Sidewalk | | 1/18/2022 | $468.43 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | inv # 512658 1st Ave Sidewalk | | 3/10/2022 | $11,958.40 |
Public Works | Consulting Costs-Sidewalks | GEOWALL DESIGNS | 2021 BIRNEY WALL DESIGN | | 3/29/2022 | $3,000.00 |
Public Works | Consulting Costs-Sidewalks | ROCKSOL CONSULTING GROUP INC | Account # Change for Inv | | 3/30/2022 | $1,420.71 |