Community Resources | Consulting services-Bldg Const | SLATERPAULL | Carmody Pool Add'l Work | | 1/13/2010 | $3,100.00 |
Community Resources | Consulting services-Bldg Const | SLATERPAULL | Carmody Pool Add'l Work | | 1/13/2010 | $1,451.00 |
Community Resources | Consulting services-Bldg Const | FOOTHILLS ROOF SERVICES INC | Roof consulting services | | 1/14/2010 | $260.00 |
Community Resources | Consulting services-Bldg Const | THE BRENDLE GROUP INC | RFD Deve Energy Feasibity Stud | | 2/17/2010 | $500.00 |
Community Resources | Consulting services-Bldg Const | SPEEDY MESSENGER DEL SERV | 2009 messenger service for CR | | 2/19/2010 | $15.93 |
Community Resources | Consulting services-Bldg Const | C4I DESIGN GROUP INC | Architect & Engineer Services | | 2/25/2010 | $4,366.80 |
Community Resources | Consulting services-Bldg Const | C4I DESIGN GROUP INC | Design Svc for Maint Shops | | 3/18/2010 | $3,632.90 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | Comprehensive Asbestos Survey- | | 3/18/2010 | $953.40 |
Community Resources | Consulting services-Bldg Const | TANDUS US INC | LHC Offices - Carpet | | 3/31/2010 | $2,448.15 |
Community Resources | Consulting services-Bldg Const | TANDUS US INC | LHC Offices - Carpet | | 4/15/2010 | $3,912.38 |
Community Resources | Consulting services-Bldg Const | C4I DESIGN GROUP INC | Archit & Eng Design Svcs-Waste | | 4/29/2010 | $641.10 |
Community Resources | Consulting services-Bldg Const | C4I DESIGN GROUP INC | Archt & Eng Design Svcs | | 4/29/2010 | $7,647.40 |
Community Resources | Consulting services-Bldg Const | EWERS ARCHITECTURE | Design Services Motel Move | | 5/6/2010 | $4,375.00 |
Community Resources | Consulting services-Bldg Const | MARTIN MARTIN INC | Head Start - Engineering Serv | | 7/28/2010 | $650.00 |
Community Resources | Consulting services-Bldg Const | C4I DESIGN GROUP INC | Architectural & Engineer | | 7/29/2010 | $795.80 |
Community Resources | Consulting services-Bldg Const | BIRDI DISC GOLF | Site Evaluation for Disc Golf | | 8/4/2010 | $1,950.00 |
Community Resources | Consulting services-Bldg Const | INDOX SERVICES | Estes Motel Prints & Mylars | | 8/25/2010 | $44.82 |
Community Resources | Consulting services-Bldg Const | EWERS ARCHITECTURE | Design Services Motel Move | | 11/9/2010 | $1,625.00 |
Community Resources | Consulting services-Bldg Const | EWERS ARCHITECTURE | Design Services Motel Move | | 11/9/2010 | $31.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | 9700 W Colfax Ave - Comprehens | | 11/22/2010 | $635.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | Estes Motel - Concrete Samplin | | 12/20/2010 | $570.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | Estes Motel - Pier Observation | | 12/20/2010 | $671.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | Estes Motel - Compaction Testi | | 12/20/2010 | $420.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | Estes Motel - Concrete Samplin | | 12/31/2010 | $110.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | 9700 W Colfax - Comprehensive | | 12/31/2010 | $295.00 |
Community Resources | Consulting services-Bldg Const | WALKER CONSULTANTS INC | Civic Center Plaza - Update of | | 6/1/2011 | $2,000.00 |
Community Resources | Consulting services-Bldg Const | WALKER CONSULTANTS INC | Prof Services - Construction | | 6/1/2011 | $500.00 |
Community Resources | Consulting services-Bldg Const | WALKER CONSULTANTS INC | Prof Services - Construction | | 8/4/2011 | $1,000.00 |
Community Resources | Consulting services-Bldg Const | WALKER CONSULTANTS INC | Prof Services - Construction | | 8/25/2011 | $1,604.34 |
Community Resources | Consulting services-Bldg Const | WALKER CONSULTANTS INC | Prof Services - Construction | | 9/22/2011 | $757.44 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 6/9/2015 | $18,722.50 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 7/22/2015 | $19,256.76 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 9/10/2015 | $2,601.23 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #1 Add'l Design Svcs | | 10/8/2015 | $3,398.14 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 10/13/2015 | $1,030.08 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 11/10/2015 | $1,411.85 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 12/15/2015 | $1,545.12 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 12/15/2015 | $26.39 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #1 Add'l Design Svcs | | 12/15/2015 | $366.40 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 12/15/2015 | $1,920.17 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #1 Add'l Design Svcs | | 1/11/2016 | $916.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 1/11/2016 | $822.93 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 1/28/2016 | $858.40 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 2/11/2016 | $654.07 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 2/11/2016 | $5,486.20 |
Community Resources | Consulting services-Bldg Const | ABC IMAGING OF WASHINGTON | Display Props for Link Pool Im | | 2/29/2016 | $432.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 3/9/2016 | $6,583.44 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 3/22/2016 | $1,716.80 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 4/7/2016 | $12,456.84 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 4/14/2016 | $3,433.60 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 5/11/2016 | $22,219.11 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 5/11/2016 | $6,008.80 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 6/8/2016 | $10,085.20 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 6/24/2016 | $975.55 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 6/24/2016 | $117.15 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 7/7/2016 | $1,253.35 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 9/7/2016 | $2,113.60 |
Community Resources | Consulting services-Bldg Const | SR + DK CONSULTANTS INC | Roof Consultant per agr # 4031 | | 10/6/2016 | $12,585.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 10/12/2016 | $3,072.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | Corrected Acct # | | 11/8/2016 | $2,387.91 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #1 Add'l Design Svcs | | 11/8/2016 | $819.46 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 11/8/2016 | $3,015.43 |
Community Resources | Consulting services-Bldg Const | KEN'S REPRODUCTIONS LLLP | Construction drawings for PSC | | 11/30/2016 | $583.17 |
Community Resources | Consulting services-Bldg Const | STILES ENVIRONMENTAL & INDUSTRIAL | CARETAKER'S COTTAGE | | 12/14/2016 | $1,300.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 12/15/2016 | $12,369.20 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 1/11/2017 | $3,791.00 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 1/12/2017 | $741.25 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 2/8/2017 | $7,165.74 |
Community Resources | Consulting services-Bldg Const | THE ALARM MAN INC | 2016: Clement's Center Restroo | | 2/15/2017 | $85.00 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 2/22/2017 | $6,075.00 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 3/8/2017 | $4,088.57 |
Community Resources | Consulting services-Bldg Const | SR + DK CONSULTANTS INC | Roof Consultant per agr # 4031 | | 3/8/2017 | $7,405.00 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 3/15/2017 | $8,264.70 |
Community Resources | Consulting services-Bldg Const | KEN'S REPRODUCTIONS LLLP | Finance Charge (will get credi | | 3/15/2017 | $29.17 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 4/5/2017 | $4,079.27 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 4/20/2017 | $6,735.48 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #2 Phase II Add'l Svcs | | 5/10/2017 | $1,567.94 |
Community Resources | Consulting services-Bldg Const | BARKER RINKER SEACAT ARCHITECTURE | CO #3 Add'l SOW | | 5/10/2017 | $504.00 |
Community Resources | Consulting services-Bldg Const | SR + DK CONSULTANTS INC | BCLP Roof Repair Bid | | 5/11/2017 | $1,537.50 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 6/7/2017 | $22,125.00 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 6/15/2017 | $741.25 |
Community Resources | Consulting services-Bldg Const | THE BALLARD GROUP INC | Link Pool - Mechanical Upgrade | | 6/15/2017 | $117.15 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 7/19/2017 | $2,652.46 |
Community Resources | Consulting services-Bldg Const | RNF CONSULTANTS INC | LINK SIGNS | | 8/4/2017 | $258.75 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 8/16/2017 | $2,400.00 |
Community Resources | Consulting services-Bldg Const | ABC IMAGING OF WASHINGTON | Construction drawings | | 8/23/2017 | $33.00 |
Community Resources | Consulting services-Bldg Const | WEST METRO FIRE PROTECTIO | Filing fees for construction p | | 8/23/2017 | $452.66 |
Community Resources | Consulting services-Bldg Const | E3 SIGNS | LCC Sign Refurbishment | | 9/13/2017 | $11,256.00 |
Community Resources | Consulting services-Bldg Const | E3 SIGNS | Chg Order #1 to Repaint | | 9/13/2017 | $3,561.80 |
Community Resources | Consulting services-Bldg Const | SR + DK CONSULTANTS INC | Roof Consultant for Carmody | | 10/18/2017 | $2,750.00 |
Community Resources | Consulting services-Bldg Const | A G WASSENAAR INC | 1580 YARROW RESTROOM RENO | | 10/23/2017 | $1,494.65 |
Community Resources | Consulting services-Bldg Const | WEST METRO FIRE PROTECTIO | West Metro Fire Rescue Constru | | 10/31/2017 | $341.54 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 11/15/2017 | $1,854.85 |
Community Resources | Consulting services-Bldg Const | 2WR OF COLORADO INC | Public Safety Center Restrooms | | 12/21/2017 | $9,900.00 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 12/27/2017 | $800.00 |
Community Resources | Consulting services-Bldg Const | 2WR OF COLORADO INC | ARCHITECTUAL SERVICES | | 1/11/2018 | $9,150.00 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 3/5/2018 | $2,625.00 |
Community Resources | Consulting services-Bldg Const | ALL AMERICAN INVESTMENT GROUP LLC | Lease/Purchase Financing | | 3/15/2018 | $10,000.00 |
Community Resources | Consulting services-Bldg Const | GREEN MOUNTAIN ACE HARDWARE | Hepa Filters- Office | | 3/19/2018 | $63.96 |
Community Resources | Consulting services-Bldg Const | JON DON MOTO #888 | Mold Protection Equipment- Var | | 3/19/2018 | $66.00 |
Community Resources | Consulting services-Bldg Const | IN STILES ENVIRONMENTAL | Asbestos & Lead Samples and In | | 3/19/2018 | $582.00 |
Community Resources | Consulting services-Bldg Const | IN STILES ENVIRONMENTAL | Asbestos & Lead Samples and In | | 3/19/2018 | $1,077.97 |
Community Resources | Consulting services-Bldg Const | IN STILES ENVIRONMENTAL | Asbestos & Lead Samples and In | | 3/19/2018 | $1,212.00 |
Community Resources | Consulting services-Bldg Const | STIFEL NICOLAUS AND COMPANY INC | Placement Agent Fee | | 4/10/2018 | $5,000.00 |
Community Resources | Consulting services-Bldg Const | SR + DK CONSULTANTS INC | Roof Consultant for Carmody | | 5/1/2018 | $2,036.00 |
Community Resources | Consulting services-Bldg Const | 2WR OF COLORADO INC | Public Safety Center Restrooms | | 5/17/2018 | $9,150.00 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 5/29/2018 | $2,125.00 |
Community Resources | Consulting services-Bldg Const | 2WR OF COLORADO INC | Public Safety Center Restrooms | | 5/30/2018 | $12,000.00 |
Community Resources | Consulting services-Bldg Const | REC McKinstry Pymnts | Carmody 05/18 | | 6/1/2018 | $116,619.77 |
Community Resources | Consulting services-Bldg Const | REC McKinstry Pymnts | Green Mountain 05/18 | | 6/1/2018 | $29,184.21 |
Community Resources | Consulting services-Bldg Const | REC McKinstry Pymnts | Clements 05/18 | | 6/1/2018 | $42,823.08 |
Community Resources | Consulting services-Bldg Const | REC McKinstry Pymnts | Carmody 04/18 | | 6/1/2018 | $151,617.67 |
Community Resources | Consulting services-Bldg Const | THE ABO GROUP | Architectural/Engineering | | 6/7/2018 | $342.51 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 6/13/2018 | $1,075.20 |
Community Resources | Consulting services-Bldg Const | REC McKinstry Pymnts | Carmody 06/18 | | 6/26/2018 | $230,608.08 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 7/10/2018 | $10,572.80 |
Community Resources | Consulting services-Bldg Const | REC Mckinstry Pymnts | Carmody 07/18 | | 7/30/2018 | $60,392.52 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 8/1/2018 | $176,964.66 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 8/1/2018 | $40,176.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 8/8/2018 | $2,688.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Grn Mtn Rec Pool Mechanical | | 8/8/2018 | $4,000.00 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 9/17/2018 | $110,989.81 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 9/17/2018 | $227,486.29 |
Community Resources | Consulting services-Bldg Const | REC Mckinstry Pymnts | Carmody 09/18 | | 9/19/2018 | $112,147.47 |
Community Resources | Consulting services-Bldg Const | CHOICE SCREENING | Background970 - CR Contractor | | 9/19/2018 | $25.00 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 10/2/2018 | $11,727.00 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 10/2/2018 | $11,209.05 |
Community Resources | Consulting services-Bldg Const | REC Mckinstry Pymnts | Carmody 10/18 | | 10/10/2018 | $743,288.63 |
Community Resources | Consulting services-Bldg Const | JDE FIRE AND SECURITY LLC | MCKINSTRY-CARMODY REC CENTER | | 10/11/2018 | $1,000.00 |
Community Resources | Consulting services-Bldg Const | JDE FIRE AND SECURITY LLC | MCKINSTRY-CARMODY REC CENTER | | 10/11/2018 | $1,905.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Grn Mtn Rec Pool Mechanical | | 10/23/2018 | $4,000.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 10/23/2018 | $23,184.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 10/30/2018 | $8,512.00 |
Community Resources | Consulting services-Bldg Const | REC Mckinstry Pymnts | Carmody 12/18 | | 12/4/2018 | $3,200.00 |
Community Resources | Consulting services-Bldg Const | MCKINSTRY ESSENTION LLC | Energy Peformance Contract | | 12/6/2018 | $42,415.78 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Glennon Heights Pool Bathhouse | | 12/13/2018 | $1,064.00 |
Community Resources | Consulting services-Bldg Const | OHLSON LAVOIE CORPORATION | Grn Mtn Rec Pool Mechanical | | 12/13/2018 | $1,000.00 |
Community Resources | Consulting services-Bldg Const | FORM+WORKS DESIGN GROUP LLC | Architectural Services | | 12/17/2018 | $1,875.00 |