Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 1/13/2010 | $4,050.00 |
Community Resources | Construc Costs-Site Improve | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009Fiber Cabling from PSC to | | 1/21/2010 | $3,267.25 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 2/11/2010 | $4,050.00 |
Community Resources | Construc Costs-Site Improve | AM SIGNAL INC (DO NOT USE) | Pole Mount Radar Speed sign | | 2/11/2010 | $7,690.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 3/10/2010 | $6,255.85 |
Community Resources | Construc Costs-Site Improve | TERRA AUTOMATED SYSTEMS | Ray Ross Irrigation Controller | | 3/11/2010 | $10,017.70 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 4/8/2010 | $4,275.00 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 4/15/2010 | $6,449.50 |
Community Resources | Construc Costs-Site Improve | J&S CONTRACTORS SUPPLY | Coyote Gulch Park Baseball Sig | | 4/21/2010 | $25.60 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Foothills PG Bid Drawing Repro | | 4/21/2010 | $19.80 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 4/29/2010 | $4,275.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN RECREATION | Sanderson Gulch Greenbelt | | 4/29/2010 | $2,506.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 5/6/2010 | $4,938.30 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Eng Svc Soda Lake Geologic | | 5/12/2010 | $809.44 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 5/13/2010 | $303.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross Splash Park - Install | | 5/19/2010 | $349.00 |
Community Resources | Construc Costs-Site Improve | SPEEDY MESSENGER DEL SERV | Messenger svc for CR | | 5/24/2010 | $18.68 |
Community Resources | Construc Costs-Site Improve | DEWITT INC | Baseball printing for Coyote G | | 5/24/2010 | $456.88 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Foothills Park Playgrd Dwgs | | 5/24/2010 | $17.50 |
Community Resources | Construc Costs-Site Improve | TODD PIERSON PHOTOGRAPHY | Photos Coyote Gulch Ball Field | | 5/26/2010 | $150.00 |
Community Resources | Construc Costs-Site Improve | GOODLAND CONSTRUCTION INC | Ray Ross Park - Concrete | | 6/8/2010 | $6,742.50 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $16,625.92 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $329.54 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $2,245.00 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 6/10/2010 | $151.50 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross-move stream on pump | | 6/14/2010 | $95.00 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross- Heater Leaking | | 6/14/2010 | $455.00 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | Ray Ross Sod Placement | | 6/17/2010 | $50,917.17 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | compost delivered and spread | | 6/17/2010 | $12,720.00 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Ray Ross Splash pad repair par | | 6/17/2010 | $15.32 |
Community Resources | Construc Costs-Site Improve | MITERED DRAIN INC | PVC endcap Foothills park | | 6/17/2010 | $58.00 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross-Problems w splash pum | | 7/1/2010 | $181.50 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 7/1/2010 | $8,181.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #3 Add'l Work | | 7/1/2010 | $369.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 7/7/2010 | $1,680.76 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 7/7/2010 | $846.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $70.46 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $1,200.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $472.00 |
Community Resources | Construc Costs-Site Improve | PROGRESSIVE PLAYGROUNDS INC | Foothills Pk-Install Playgroun | | 7/19/2010 | $75.00 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $24.33 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $31.90 |
Community Resources | Construc Costs-Site Improve | TOOLS AND EQUIPMENTS | Splash Pad Repair Parts | | 7/19/2010 | $10.98 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $98.53 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $7.48 |
Community Resources | Construc Costs-Site Improve | AMERICAN PRIDE07000078 | Fertilizer 18-46-0 mixture Inv | | 7/19/2010 | $764.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 7/22/2010 | $210.72 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross - Levelor K-2100 | | 8/18/2010 | $795.65 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Foothills Park - Concrete Samp | | 8/25/2010 | $547.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Foothills Park - Compaction Te | | 8/25/2010 | $489.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 9/16/2010 | $1,294.64 |
Community Resources | Construc Costs-Site Improve | MURPHY COMPANY MECHANICAL | Ray Ross Park water feature re | | 9/23/2010 | $5,763.60 |
Community Resources | Construc Costs-Site Improve | ARBOR ROCK LLC | Infield Mix - Ray Ross Fields | | 9/30/2010 | $7,058.21 |
Community Resources | Construc Costs-Site Improve | ARBOR ROCK LLC | Infield Mix - Ray Ross Fields | | 9/30/2010 | $17,039.53 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 10/7/2010 | $0.85 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #3 Add'l Work | | 10/7/2010 | $980.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #4- Add 2 days | | 10/7/2010 | $2,125.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 10/21/2010 | $180.50 |
Community Resources | Construc Costs-Site Improve | CHURCHICH RECREATION LLC | PO 248 - Ray Ross Slash Park - | | 11/22/2010 | $2,541.00 |
Community Resources | Construc Costs-Site Improve | KEENE CONCRETE INC | Add'l Concrete - Ray Ross Park | | 12/9/2010 | $6,688.00 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Pub. Safety Ctr Drawing Repro. | | 2/18/2011 | $17.35 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 3/9/2011 | $30,384.17 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Public Safety Center | | 4/7/2011 | $775.00 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 4/7/2011 | $11,707.32 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | 480 S Allison - Edge Binding | | 4/26/2011 | $115.50 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Public Safety Center | | 4/28/2011 | $14,695.90 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 4/28/2011 | $1,143.06 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Public Safety Center - Plants | | 5/5/2011 | $2,462.00 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 5/5/2011 | $3,983.83 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 5/5/2011 | $693.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross-Huba Air Valve | | 5/11/2011 | $255.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 5/12/2011 | $378.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross-Install Water Meter | | 5/19/2011 | $711.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | 5330 W 9th Ave - Fence Rental | | 6/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | TIMBERLINE GARDENS INC | Buy Plants for PSC Rear Bed | | 6/20/2011 | $112.76 |
Community Resources | Construc Costs-Site Improve | SEALANT SYSTEMS CORP | Harlan Splash Park - Sealant | | 6/21/2011 | $1,272.50 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 6/30/2011 | $606.89 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 6/30/2011 | $71.25 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Add amt from PO error pambro | | 6/30/2011 | $378.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Add amt from PO error pambro | | 6/30/2011 | $775.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | 5330 W 9th Ave - Fence Rental | | 7/27/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 8/29/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 9/9/2011 | $16,774.48 |
Community Resources | Construc Costs-Site Improve | HORIZON TURF NURSERY, INC. | Turf Delivery/ Install | | 9/16/2011 | $1,605.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 9/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 9/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Public Safety Center Rear Plan | | 9/20/2011 | $179.65 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Public Safety Ctr Rear Plants | | 9/20/2011 | $57.00 |
Community Resources | Construc Costs-Site Improve | STONEHOUSE SIGNS | Public Safety Center Rear Inte | | 9/20/2011 | $115.26 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/7/2011 | $243,427.38 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 11/17/2011 | $197,101.67 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Constr. Drawings | | 11/17/2011 | $36.37 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Constr. Drawings | | 11/17/2011 | $10.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 11/30/2011 | $146,218.18 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool Concrete Samplin | | 12/19/2011 | $1,382.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Concrete Sampl | | 12/31/2011 | $273.50 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Bid Doc. Repro | | 12/31/2011 | $48.80 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Hodgson Park Bid Doc. Repro | | 12/31/2011 | $19.52 |
Community Resources | Construc Costs-Site Improve | FEDERAL EXPRESS | 2011 Shipping chgs 11/11 | | 1/5/2012 | $7.99 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 1/13/2012 | $107,538.47 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 1/18/2012 | $1,920.00 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 1/25/2012 | $1,287.20 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 2/9/2012 | $71,908.24 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 2/16/2012 | $53,505.50 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 3/8/2012 | $159,112.21 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | Daniels Park-Install Light Pol | | 3/28/2012 | $698.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN RECREATION | Ray Ross - Blender Spinner | | 4/3/2012 | $500.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 4/4/2012 | $107,133.34 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 4/5/2012 | $87,896.84 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 4/12/2012 | $592.80 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 4/12/2012 | $7.20 |
Community Resources | Construc Costs-Site Improve | TERRA AUTOMATED SYSTEMS | Daniels irrigation module | | 4/18/2012 | $877.28 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Concrete Sampl | | 4/24/2012 | $311.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Footing Observ | | 4/24/2012 | $575.00 |
Community Resources | Construc Costs-Site Improve | KING SOOPERS #0127 | Cooking Spray for Concrete Sta | | 4/24/2012 | $1.78 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | sod for Carmody | | 5/2/2012 | $4,200.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 5/3/2012 | $2,152.52 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 5/3/2012 | $53,707.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 5/16/2012 | $173,558.91 |
Community Resources | Construc Costs-Site Improve | WEATHERSURE SYSTEMS INC | Ray Ross & Lockmoor Caulking | | 5/21/2012 | $1,023.80 |
Community Resources | Construc Costs-Site Improve | LEVI CONTRACTORS INC | Ray Ross Park Maintenance | | 5/23/2012 | $17,874.00 |
Community Resources | Construc Costs-Site Improve | GKKWORKS KLIPP INC. | Oak Street Transit Museum - | | 5/24/2012 | $4,083.30 |
Community Resources | Construc Costs-Site Improve | ACTIVE CABLING & COMMUNICATIONS | CABLING FOR SURFSIDE SPLASH PK | | 6/7/2012 | $434.84 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 6/13/2012 | $207,017.19 |
Community Resources | Construc Costs-Site Improve | LEVI CONTRACTORS INC | Ray Ross Park Maintenance | | 6/14/2012 | $1,986.00 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Hodgson Park-Bulk Fiber | | 6/21/2012 | $3,100.00 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | surf side new install | | 6/26/2012 | $10,948.13 |
Community Resources | Construc Costs-Site Improve | 1872 CED | light replacement -Richey Park | | 6/26/2012 | $4,729.85 |
Community Resources | Construc Costs-Site Improve | RENEWABLE FIBER INC | Amended Top Soil - Carmody PO | | 6/26/2012 | $5,130.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Hodgson Park Playground - | | 7/3/2012 | $4,147.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Hodgson Park Playground - | | 7/3/2012 | $220.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 7/9/2012 | $12,338.66 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $6,272.64 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $3,764.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $1,358.01 |
Community Resources | Construc Costs-Site Improve | 1872 CED | Richey Park light replacement | | 7/20/2012 | $10,555.65 |
Community Resources | Construc Costs-Site Improve | FASTSIGNS OF LAKEWOOD | Surfside signs | | 7/20/2012 | $192.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Material to install signs | | 7/20/2012 | $20.44 |
Community Resources | Construc Costs-Site Improve | ACE HARDWARE | Line Level (tool) | | 7/20/2012 | $4.49 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Hodgson Park-6 Wearmats | | 7/30/2012 | $600.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN PARKING LOT SERVICES, INC | Hodgson Park-Parking Striping | | 8/1/2012 | $305.00 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | Mapping Design Service - City | | 8/23/2012 | $3,240.00 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | Sod for Hodgson Park- 3 Quotes | | 8/23/2012 | $8,075.50 |
Community Resources | Construc Costs-Site Improve | COLORADO SECURITY PRODUCT | Floor Safe for Surfside | | 8/23/2012 | $1,345.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Invoice 214401 - Ray Ross Park | | 8/23/2012 | $112.50 |
Community Resources | Construc Costs-Site Improve | GKKWORKS KLIPP INC. | Oak Street Transit Museum - | | 8/30/2012 | $1,503.73 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 9/5/2012 | $5,974.24 |
Community Resources | Construc Costs-Site Improve | THORNE SALES & DISTRIBUTING | Trash Cans for Surfside Park | | 9/5/2012 | $5,692.49 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 9/12/2012 | $4,610.41 |
Community Resources | Construc Costs-Site Improve | CHURCHICH RECREATION LLC | Hodgson Park - Benches | | 9/18/2012 | $2,112.66 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 10/4/2012 | $17,999.16 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $61,934.66 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $6,055.70 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $3,226.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Adjust Quantities - Add 45 day | | 10/17/2012 | ($10,029.39) |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | 6' Fence + Surge Tank | | 10/17/2012 | $7,260.48 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Emergency Shut Off Switch | | 10/17/2012 | $1,267.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Window Replacement | | 10/17/2012 | $5,418.00 |
Community Resources | Construc Costs-Site Improve | SCRANTON PRODUCT INC. | Surfside - Lockers | | 10/23/2012 | $6,485.12 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 11/14/2012 | $29,253.06 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/12/2012 | $35,598.65 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/26/2012 | $5,927.26 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/26/2012 | $7,818.37 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | Mapping Design Service - City | | 2/28/2013 | $10.00 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | CO #1- Additional Mapping Svcs | | 2/28/2013 | $800.00 |
Community Resources | Construc Costs-Site Improve | VISION GRAPHICS | Bike Map - Printing | | 4/16/2013 | $4,162.11 |
Community Resources | Construc Costs-Site Improve | JIM BLACK CONSTRUCTION INC | Surfside-Hazmat Clean Up | | 5/15/2013 | $1,956.00 |
Community Resources | Construc Costs-Site Improve | BIG 5 SPORTING GOODS #333 | Holbrook Planting | | 5/21/2013 | $18.99 |
Community Resources | Construc Costs-Site Improve | ZIM CONSULTING INC | Capital Campaign Planning & | | 6/20/2013 | $8,000.00 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 8/8/2013 | $5,018.71 |
Community Resources | Construc Costs-Site Improve | LAKEWOOD PLUMBING, LLC | Commons-Camera/ Locate Garage | | 8/26/2013 | $750.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 8/28/2013 | $94,254.05 |
Community Resources | Construc Costs-Site Improve | AIR FORCE FILTER | Commons N/S-Filters Backcharg | | 9/23/2013 | $1,492.48 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 10/3/2013 | $174,520.98 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 11/6/2013 | $70,875.68 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Pond Repairs | | 11/12/2013 | $34,846.09 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 11/26/2013 | $144,376.01 |
Community Resources | Construc Costs-Site Improve | THE EROSION CONTROL COMPANY | 1195 Benton - Cleaning up Site | | 12/11/2013 | $1,839.88 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 12/12/2013 | $20,790.00 |
Community Resources | Construc Costs-Site Improve | FDI CABINETRY, LLC | Coppock Trail - Signs | | 12/17/2013 | $450.00 |
Community Resources | Construc Costs-Site Improve | FRONTIER SURVEYING INC | Lakewood Park-Survey | | 12/18/2013 | $950.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 1/13/2014 | $7,422.50 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 1/23/2014 | $72,324.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 1/29/2014 | $211,314.06 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 2/20/2014 | $8,686.00 |
Community Resources | Construc Costs-Site Improve | FRONTIER BOLT INC | picnic table bolts{flood} | | 2/24/2014 | $12.00 |
Community Resources | Construc Costs-Site Improve | STOCKYARDS RANCH SUPPL | 2 rail fence {flood } | | 2/24/2014 | $211.91 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 3/13/2014 | $17,100.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #1 Add'l Work | | 3/13/2014 | $4,900.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #2 Add'l Work | | 3/13/2014 | $7,916.69 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | Bridge replacement decking | | 3/21/2014 | $284.20 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | vynal flooring and glue/ANS | | 3/21/2014 | $169.09 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | trim boards and rollers/ANS | | 3/21/2014 | $75.37 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood shelf brackets and shelf/ | | 3/21/2014 | $27.17 |
Community Resources | Construc Costs-Site Improve | HARBOR FREIGHT TOOLS 230 | STAINING SUPPLYS,GLOVES,/FLOOD | | 3/21/2014 | $76.46 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed drywall mud | | 3/21/2014 | $5.45 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed mud, tape and tools f | | 3/21/2014 | $43.35 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed drywall mud and sandi | | 3/21/2014 | $8.92 |
Community Resources | Construc Costs-Site Improve | ROMTEC UTILITIES INC | New restroom siding and fixtur | | 3/21/2014 | $3,743.93 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 4/3/2014 | $82,073.39 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #3 Add'l Work | | 4/9/2014 | $3,331.22 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #4 Add'l Work | | 4/9/2014 | $2,769.54 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #5 Add'l Work | | 4/9/2014 | $2,769.54 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO#6 Add'l Work | | 4/9/2014 | $731.01 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #7 Add'l Work | | 4/9/2014 | $2,733.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #8 Add'l Work | | 4/9/2014 | $2,300.88 |
Community Resources | Construc Costs-Site Improve | BCER ENGINEERING, INC. | Washington Heights Salt Kiln | | 4/16/2014 | $1,500.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | decking for bridges | | 4/21/2014 | $536.56 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | nuts,bolts,table boards,spray | | 4/21/2014 | $351.24 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood,spray glue,caulk and cabl | | 4/21/2014 | $118.10 |
Community Resources | Construc Costs-Site Improve | OREILLY AUTO 00027128 | acetone and bed liner paint fo | | 4/21/2014 | $80.57 |
Community Resources | Construc Costs-Site Improve | ACE HDWE OF JEWELL SQ | fasteners for boat docks. / fl | | 4/21/2014 | $14.00 |
Community Resources | Construc Costs-Site Improve | DEN-COL SUPPLY | steel plate to repair rusted o | | 4/21/2014 | $78.57 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 4/29/2014 | $95,429.40 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 5/1/2014 | $186,577.50 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 5/7/2014 | $83,849.56 |
Community Resources | Construc Costs-Site Improve | ALTERNATIVE ENERGY SOLAR & ELECTRIC | Flood repair- solar light | | 5/8/2014 | $3,026.00 |
Community Resources | Construc Costs-Site Improve | ALL SEASONS TENNIS COURTS | Bid 3645 Westborough Tennis | | 5/13/2014 | $43,048.00 |
Community Resources | Construc Costs-Site Improve | ALL SEASONS TENNIS COURTS | Add'l Road Base for Net Posts | | 5/13/2014 | $2,170.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Mountair Park 5625 W 13th Ave | | 5/15/2014 | $12,069.00 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | BCLP-Electrical Work | | 5/21/2014 | $2,260.00 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | BCLP-Electrical at marina | | 5/22/2014 | $4,080.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | 6x6x8 lumber for bridge | | 5/23/2014 | $174.79 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hangers, anchors for bridge | | 5/23/2014 | $105.17 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hangrs and screws for bridge | | 5/23/2014 | $26.46 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | screws and bits for bridge con | | 5/23/2014 | $124.93 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | concrete and wood to build new | | 5/23/2014 | $455.23 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hardwarefor boat dock,rope | | 5/23/2014 | $128.90 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | screws, gloves,saw blades,gras | | 5/23/2014 | $138.72 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | 10 narrow leaf cottonwood tree | | 5/23/2014 | $800.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | dock anchor bolts and grass s | | 5/23/2014 | $91.73 |
Community Resources | Construc Costs-Site Improve | AGG IND AGG/ASP DISPTCH | repair material for washed out | | 5/23/2014 | $1,260.71 |
Community Resources | Construc Costs-Site Improve | CHAMPION FENCE & CONST SERVICES INC | Devinney - Gates | | 5/27/2014 | $930.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 5/29/2014 | $117,984.16 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Civic Center-Irrigation Repair | | 6/9/2014 | $1,261.63 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 6/19/2014 | $8,517.35 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | CC GARAGE EM LIGHTS | | 6/24/2014 | $1,576.80 |
Community Resources | Construc Costs-Site Improve | STOCKYARDS RANCH SUPPL | Metal roof for mini shelters a | | 6/24/2014 | $1,016.66 |
Community Resources | Construc Costs-Site Improve | FRONTIER BOLT INC | bolts and nuts to repair mini | | 6/24/2014 | $99.32 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | material to build 2 mini shelt | | 6/24/2014 | $849.60 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | commons garage- light fixtures | | 6/24/2014 | $851.25 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN DIST CO | commons garage- wire, fittings | | 6/24/2014 | $425.75 |
Community Resources | Construc Costs-Site Improve | MOUNTAIN AIRE MECHANICAL LLC | Washington Heights Salt Kiln | | 6/26/2014 | $2,797.00 |
Community Resources | Construc Costs-Site Improve | RNF CONSULTANTS INC | WH Monument Sign | | 6/26/2014 | $143.75 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 7/2/2014 | $71,001.18 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Mountair Park 5625 W 13th Ave | | 7/2/2014 | $1,341.00 |
Community Resources | Construc Costs-Site Improve | BENTHICA LLC | Video of aeration systm flood | | 7/8/2014 | $1,500.00 |
Community Resources | Construc Costs-Site Improve | VELOCITY CONSTRUCTORS INC | WEIR GULCH PUMPS AND FLOATS | | 7/9/2014 | $28,726.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 7/10/2014 | $161,559.80 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood and wire fore mini shelte | | 7/23/2014 | $23.64 |
Community Resources | Construc Costs-Site Improve | NEFF RENTAL LLC 77 | Civic Center - Lift rental for | | 7/23/2014 | $1,670.28 |
Community Resources | Construc Costs-Site Improve | ELCAR FENCE AND SUPPLY CO | Civic Center Garage-Fence | | 7/23/2014 | $4,205.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 7/31/2014 | $162,878.21 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 8/6/2014 | $81,671.31 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 8/7/2014 | $37,837.29 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #1 Add Pickleblall Posts & | | 8/7/2014 | $4,074.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 8/18/2014 | $29,290.25 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 8/20/2014 | $7,509.00 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | Sing Post - Cast Iron for Plaz | | 8/22/2014 | $374.32 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | Plaza - Pedestal Display Board | | 8/22/2014 | $546.48 |
Community Resources | Construc Costs-Site Improve | KINKO'S INC | maps for Plaza Project | | 8/22/2014 | $133.74 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Lakewood Park | | 8/28/2014 | $4,313.34 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | Lakewood Playground-Pole Moved | | 8/29/2014 | $1,818.42 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 9/4/2014 | $9,771.20 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 9/10/2014 | $119,524.05 |
Community Resources | Construc Costs-Site Improve | JP JAQUEZ CONCRETE LLC | CONCRETE WORK AT WEIR GULCH | | 9/18/2014 | $12,474.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Civic Center-Irrig Repairs | | 9/18/2014 | $883.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 9/23/2014 | $1,059.55 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #2 Remove & Replace Fence | | 9/23/2014 | $1,825.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #3 Add 25 calendar days | | 9/23/2014 | $5,531.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #4 - Add'l Work | | 9/23/2014 | $800.00 |