Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 1/13/2010 | $4,050.00 |
Community Resources | Construc Costs-Site Improve | LUMIN8 TRANSPORTATION TECHNOLOGIES LLC | 2009Fiber Cabling from PSC to | | 1/21/2010 | $3,267.25 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 2/11/2010 | $4,050.00 |
Community Resources | Construc Costs-Site Improve | AM SIGNAL INC (DO NOT USE) | Pole Mount Radar Speed sign | | 2/11/2010 | $7,690.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 3/10/2010 | $6,255.85 |
Community Resources | Construc Costs-Site Improve | TERRA AUTOMATED SYSTEMS | Ray Ross Irrigation Controller | | 3/11/2010 | $10,017.70 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 4/8/2010 | $4,275.00 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 4/15/2010 | $6,449.50 |
Community Resources | Construc Costs-Site Improve | J&S CONTRACTORS SUPPLY | Coyote Gulch Park Baseball Sig | | 4/21/2010 | $25.60 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Foothills PG Bid Drawing Repro | | 4/21/2010 | $19.80 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 4/29/2010 | $4,275.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN RECREATION | Sanderson Gulch Greenbelt | | 4/29/2010 | $2,506.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 5/6/2010 | $4,938.30 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Eng Svc Soda Lake Geologic | | 5/12/2010 | $809.44 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 5/13/2010 | $303.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross Splash Park - Install | | 5/19/2010 | $349.00 |
Community Resources | Construc Costs-Site Improve | SPEEDY MESSENGER DEL SERV | Messenger svc for CR | | 5/24/2010 | $18.68 |
Community Resources | Construc Costs-Site Improve | DEWITT INC | Baseball printing for Coyote G | | 5/24/2010 | $456.88 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Foothills Park Playgrd Dwgs | | 5/24/2010 | $17.50 |
Community Resources | Construc Costs-Site Improve | TODD PIERSON PHOTOGRAPHY | Photos Coyote Gulch Ball Field | | 5/26/2010 | $150.00 |
Community Resources | Construc Costs-Site Improve | GOODLAND CONSTRUCTION INC | Ray Ross Park - Concrete | | 6/8/2010 | $6,742.50 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $16,625.92 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $329.54 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Plgrnd Rplcmnt | | 6/10/2010 | $2,245.00 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 6/10/2010 | $151.50 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross-move stream on pump | | 6/14/2010 | $95.00 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross- Heater Leaking | | 6/14/2010 | $455.00 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | Ray Ross Sod Placement | | 6/17/2010 | $50,917.17 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | compost delivered and spread | | 6/17/2010 | $12,720.00 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Ray Ross Splash pad repair par | | 6/17/2010 | $15.32 |
Community Resources | Construc Costs-Site Improve | MITERED DRAIN INC | PVC endcap Foothills park | | 6/17/2010 | $58.00 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross-Problems w splash pum | | 7/1/2010 | $181.50 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 7/1/2010 | $8,181.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #3 Add'l Work | | 7/1/2010 | $369.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 7/7/2010 | $1,680.76 |
Community Resources | Construc Costs-Site Improve | MULLER ENGINEERING CO INC | Holbrook Park - Design Work | | 7/7/2010 | $846.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $70.46 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $1,200.00 |
Community Resources | Construc Costs-Site Improve | BUCK LANDSCAPING & DESIGN LLC | Foothills Park Playgrd Rplcmnt | | 7/7/2010 | $472.00 |
Community Resources | Construc Costs-Site Improve | PROGRESSIVE PLAYGROUNDS INC | Foothills Pk-Install Playgroun | | 7/19/2010 | $75.00 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $24.33 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $31.90 |
Community Resources | Construc Costs-Site Improve | TOOLS AND EQUIPMENTS | Splash Pad Repair Parts | | 7/19/2010 | $10.98 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $98.53 |
Community Resources | Construc Costs-Site Improve | CPS DISTRIBUTORS #18 | Splash Pad Repair Parts | | 7/19/2010 | $7.48 |
Community Resources | Construc Costs-Site Improve | AMERICAN PRIDE07000078 | Fertilizer 18-46-0 mixture Inv | | 7/19/2010 | $764.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 7/22/2010 | $210.72 |
Community Resources | Construc Costs-Site Improve | AQUATIC CHEMICAL SOLUTIONS INC | Ray Ross - Levelor K-2100 | | 8/18/2010 | $795.65 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Foothills Park - Concrete Samp | | 8/25/2010 | $547.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Foothills Park - Compaction Te | | 8/25/2010 | $489.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 9/16/2010 | $1,294.64 |
Community Resources | Construc Costs-Site Improve | MURPHY COMPANY MECHANICAL | Ray Ross Park water feature re | | 9/23/2010 | $5,763.60 |
Community Resources | Construc Costs-Site Improve | ARBOR ROCK LLC | Infield Mix - Ray Ross Fields | | 9/30/2010 | $7,058.21 |
Community Resources | Construc Costs-Site Improve | ARBOR ROCK LLC | Infield Mix - Ray Ross Fields | | 9/30/2010 | $17,039.53 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Ray Ross Park Redevelopment | | 10/7/2010 | $0.85 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #3 Add'l Work | | 10/7/2010 | $980.00 |
Community Resources | Construc Costs-Site Improve | ECI SITE CONSTRUCTION MANAGEMENT INC | Change Order #4- Add 2 days | | 10/7/2010 | $2,125.00 |
Community Resources | Construc Costs-Site Improve | HRS WATER CONSULTANTS INC | Consulting Service for Analysi | | 10/21/2010 | $180.50 |
Community Resources | Construc Costs-Site Improve | CHURCHICH RECREATION LLC | PO 248 - Ray Ross Slash Park - | | 11/22/2010 | $2,541.00 |
Community Resources | Construc Costs-Site Improve | KEENE CONCRETE INC | Add'l Concrete - Ray Ross Park | | 12/9/2010 | $6,688.00 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Pub. Safety Ctr Drawing Repro. | | 2/18/2011 | $17.35 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 3/9/2011 | $30,384.17 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Public Safety Center | | 4/7/2011 | $775.00 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 4/7/2011 | $11,707.32 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | 480 S Allison - Edge Binding | | 4/26/2011 | $115.50 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Public Safety Center | | 4/28/2011 | $14,695.90 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 4/28/2011 | $1,143.06 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Public Safety Center - Plants | | 5/5/2011 | $2,462.00 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 5/5/2011 | $3,983.83 |
Community Resources | Construc Costs-Site Improve | ELK CREEK SAND & GRAVEL LLC | Surfside Pool Demolition | | 5/5/2011 | $693.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross-Huba Air Valve | | 5/11/2011 | $255.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 5/12/2011 | $378.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE PLUMBING CO INC | Ray Ross-Install Water Meter | | 5/19/2011 | $711.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | 5330 W 9th Ave - Fence Rental | | 6/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | TIMBERLINE GARDENS INC | Buy Plants for PSC Rear Bed | | 6/20/2011 | $112.76 |
Community Resources | Construc Costs-Site Improve | SEALANT SYSTEMS CORP | Harlan Splash Park - Sealant | | 6/21/2011 | $1,272.50 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 6/30/2011 | $606.89 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | PSC- Add'l Work | | 6/30/2011 | $71.25 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Add amt from PO error pambro | | 6/30/2011 | $378.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Add amt from PO error pambro | | 6/30/2011 | $775.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | 5330 W 9th Ave - Fence Rental | | 7/27/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 8/29/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 9/9/2011 | $16,774.48 |
Community Resources | Construc Costs-Site Improve | HORIZON TURF NURSERY, INC. | Turf Delivery/ Install | | 9/16/2011 | $1,605.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 9/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | UNITED SITE SVCS CO | Fence Rental | | 9/20/2011 | $39.00 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Public Safety Center Rear Plan | | 9/20/2011 | $179.65 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Public Safety Ctr Rear Plants | | 9/20/2011 | $57.00 |
Community Resources | Construc Costs-Site Improve | STONEHOUSE SIGNS | Public Safety Center Rear Inte | | 9/20/2011 | $115.26 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/7/2011 | $243,427.38 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 11/17/2011 | $197,101.67 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Constr. Drawings | | 11/17/2011 | $36.37 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Constr. Drawings | | 11/17/2011 | $10.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 11/30/2011 | $146,218.18 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool Concrete Samplin | | 12/19/2011 | $1,382.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Concrete Sampl | | 12/31/2011 | $273.50 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Daniels Park Bid Doc. Repro | | 12/31/2011 | $48.80 |
Community Resources | Construc Costs-Site Improve | INDOX SERVICES | Hodgson Park Bid Doc. Repro | | 12/31/2011 | $19.52 |
Community Resources | Construc Costs-Site Improve | FEDERAL EXPRESS | 2011 Shipping chgs 11/11 | | 1/5/2012 | $7.99 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 1/13/2012 | $107,538.47 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 1/18/2012 | $1,920.00 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 1/25/2012 | $1,287.20 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 2/9/2012 | $71,908.24 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 2/16/2012 | $53,505.50 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 3/8/2012 | $159,112.21 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | Daniels Park-Install Light Pol | | 3/28/2012 | $698.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN RECREATION | Ray Ross - Blender Spinner | | 4/3/2012 | $500.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 4/4/2012 | $107,133.34 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 4/5/2012 | $87,896.84 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 4/12/2012 | $592.80 |
Community Resources | Construc Costs-Site Improve | MARTIN MARTIN INC | Ray Ross - Floor Drain | | 4/12/2012 | $7.20 |
Community Resources | Construc Costs-Site Improve | TERRA AUTOMATED SYSTEMS | Daniels irrigation module | | 4/18/2012 | $877.28 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Concrete Sampl | | 4/24/2012 | $311.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Surfside Pool - Footing Observ | | 4/24/2012 | $575.00 |
Community Resources | Construc Costs-Site Improve | KING SOOPERS #0127 | Cooking Spray for Concrete Sta | | 4/24/2012 | $1.78 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | sod for Carmody | | 5/2/2012 | $4,200.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 5/3/2012 | $2,152.52 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 5/3/2012 | $53,707.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 5/16/2012 | $173,558.91 |
Community Resources | Construc Costs-Site Improve | WEATHERSURE SYSTEMS INC | Ray Ross & Lockmoor Caulking | | 5/21/2012 | $1,023.80 |
Community Resources | Construc Costs-Site Improve | LEVI CONTRACTORS INC | Ray Ross Park Maintenance | | 5/23/2012 | $17,874.00 |
Community Resources | Construc Costs-Site Improve | GKKWORKS KLIPP INC. | Oak Street Transit Museum - | | 5/24/2012 | $4,083.30 |
Community Resources | Construc Costs-Site Improve | ACTIVE CABLING & COMMUNICATIONS | CABLING FOR SURFSIDE SPLASH PK | | 6/7/2012 | $434.84 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 6/13/2012 | $207,017.19 |
Community Resources | Construc Costs-Site Improve | LEVI CONTRACTORS INC | Ray Ross Park Maintenance | | 6/14/2012 | $1,986.00 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Hodgson Park-Bulk Fiber | | 6/21/2012 | $3,100.00 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | surf side new install | | 6/26/2012 | $10,948.13 |
Community Resources | Construc Costs-Site Improve | 1872 CED | light replacement -Richey Park | | 6/26/2012 | $4,729.85 |
Community Resources | Construc Costs-Site Improve | RENEWABLE FIBER INC | Amended Top Soil - Carmody PO | | 6/26/2012 | $5,130.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Hodgson Park Playground - | | 7/3/2012 | $4,147.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Hodgson Park Playground - | | 7/3/2012 | $220.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 7/9/2012 | $12,338.66 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $6,272.64 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $3,764.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Danials Park Playgrnd Replace | | 7/12/2012 | $1,358.01 |
Community Resources | Construc Costs-Site Improve | 1872 CED | Richey Park light replacement | | 7/20/2012 | $10,555.65 |
Community Resources | Construc Costs-Site Improve | FASTSIGNS OF LAKEWOOD | Surfside signs | | 7/20/2012 | $192.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Material to install signs | | 7/20/2012 | $20.44 |
Community Resources | Construc Costs-Site Improve | ACE HARDWARE | Line Level (tool) | | 7/20/2012 | $4.49 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Hodgson Park-6 Wearmats | | 7/30/2012 | $600.00 |
Community Resources | Construc Costs-Site Improve | ROCKY MOUNTAIN PARKING LOT SERVICES, INC | Hodgson Park-Parking Striping | | 8/1/2012 | $305.00 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | Mapping Design Service - City | | 8/23/2012 | $3,240.00 |
Community Resources | Construc Costs-Site Improve | KORBY SOD LLC | Sod for Hodgson Park- 3 Quotes | | 8/23/2012 | $8,075.50 |
Community Resources | Construc Costs-Site Improve | COLORADO SECURITY PRODUCT | Floor Safe for Surfside | | 8/23/2012 | $1,345.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Invoice 214401 - Ray Ross Park | | 8/23/2012 | $112.50 |
Community Resources | Construc Costs-Site Improve | GKKWORKS KLIPP INC. | Oak Street Transit Museum - | | 8/30/2012 | $1,503.73 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 9/5/2012 | $5,974.24 |
Community Resources | Construc Costs-Site Improve | THORNE SALES & DISTRIBUTING | Trash Cans for Surfside Park | | 9/5/2012 | $5,692.49 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 9/12/2012 | $4,610.41 |
Community Resources | Construc Costs-Site Improve | CHURCHICH RECREATION LLC | Hodgson Park - Benches | | 9/18/2012 | $2,112.66 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 10/4/2012 | $17,999.16 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $61,934.66 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $6,055.70 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Surfside Park Splash Park | | 10/17/2012 | $3,226.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Adjust Quantities - Add 45 day | | 10/17/2012 | ($10,029.39) |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | 6' Fence + Surge Tank | | 10/17/2012 | $7,260.48 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Emergency Shut Off Switch | | 10/17/2012 | $1,267.00 |
Community Resources | Construc Costs-Site Improve | GROWLING BEAR CO, INC | Window Replacement | | 10/17/2012 | $5,418.00 |
Community Resources | Construc Costs-Site Improve | SCRANTON PRODUCT INC. | Surfside - Lockers | | 10/23/2012 | $6,485.12 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 11/14/2012 | $29,253.06 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/12/2012 | $35,598.65 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/26/2012 | $5,927.26 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 12/26/2012 | $7,818.37 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | Mapping Design Service - City | | 2/28/2013 | $10.00 |
Community Resources | Construc Costs-Site Improve | JOSEPH DAVID NELSON III | CO #1- Additional Mapping Svcs | | 2/28/2013 | $800.00 |
Community Resources | Construc Costs-Site Improve | VISION GRAPHICS | Bike Map - Printing | | 4/16/2013 | $4,162.11 |
Community Resources | Construc Costs-Site Improve | JIM BLACK CONSTRUCTION INC | Surfside-Hazmat Clean Up | | 5/15/2013 | $1,956.00 |
Community Resources | Construc Costs-Site Improve | BIG 5 SPORTING GOODS #333 | Holbrook Planting | | 5/21/2013 | $18.99 |
Community Resources | Construc Costs-Site Improve | ZIM CONSULTING INC | Capital Campaign Planning & | | 6/20/2013 | $8,000.00 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Park Drainage Imprv | | 8/8/2013 | $5,018.71 |
Community Resources | Construc Costs-Site Improve | LAKEWOOD PLUMBING, LLC | Commons-Camera/ Locate Garage | | 8/26/2013 | $750.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 8/28/2013 | $94,254.05 |
Community Resources | Construc Costs-Site Improve | AIR FORCE FILTER | Commons N/S-Filters Backcharg | | 9/23/2013 | $1,492.48 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 10/3/2013 | $174,520.98 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 11/6/2013 | $70,875.68 |
Community Resources | Construc Costs-Site Improve | L&M ENTERPRISES INC | Holbrook Pond Repairs | | 11/12/2013 | $34,846.09 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 11/26/2013 | $144,376.01 |
Community Resources | Construc Costs-Site Improve | THE EROSION CONTROL COMPANY | 1195 Benton - Cleaning up Site | | 12/11/2013 | $1,839.88 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 12/12/2013 | $20,790.00 |
Community Resources | Construc Costs-Site Improve | FDI CABINETRY, LLC | Coppock Trail - Signs | | 12/17/2013 | $450.00 |
Community Resources | Construc Costs-Site Improve | FRONTIER SURVEYING INC | Lakewood Park-Survey | | 12/18/2013 | $950.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 1/13/2014 | $7,422.50 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 1/23/2014 | $72,324.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 1/29/2014 | $211,314.06 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 2/20/2014 | $8,686.00 |
Community Resources | Construc Costs-Site Improve | FRONTIER BOLT INC | picnic table bolts{flood} | | 2/24/2014 | $12.00 |
Community Resources | Construc Costs-Site Improve | STOCKYARDS RANCH SUPPL | 2 rail fence {flood } | | 2/24/2014 | $211.91 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Heritage Center Electrical | | 3/13/2014 | $17,100.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #1 Add'l Work | | 3/13/2014 | $4,900.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #2 Add'l Work | | 3/13/2014 | $7,916.69 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | Bridge replacement decking | | 3/21/2014 | $284.20 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | vynal flooring and glue/ANS | | 3/21/2014 | $169.09 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | trim boards and rollers/ANS | | 3/21/2014 | $75.37 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood shelf brackets and shelf/ | | 3/21/2014 | $27.17 |
Community Resources | Construc Costs-Site Improve | HARBOR FREIGHT TOOLS 230 | STAINING SUPPLYS,GLOVES,/FLOOD | | 3/21/2014 | $76.46 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed drywall mud | | 3/21/2014 | $5.45 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed mud, tape and tools f | | 3/21/2014 | $43.35 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | ANS shed drywall mud and sandi | | 3/21/2014 | $8.92 |
Community Resources | Construc Costs-Site Improve | ROMTEC UTILITIES INC | New restroom siding and fixtur | | 3/21/2014 | $3,743.93 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 4/3/2014 | $82,073.39 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #3 Add'l Work | | 4/9/2014 | $3,331.22 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #4 Add'l Work | | 4/9/2014 | $2,769.54 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #5 Add'l Work | | 4/9/2014 | $2,769.54 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO#6 Add'l Work | | 4/9/2014 | $731.01 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #7 Add'l Work | | 4/9/2014 | $2,733.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | CO #8 Add'l Work | | 4/9/2014 | $2,300.88 |
Community Resources | Construc Costs-Site Improve | BCER ENGINEERING, INC. | Washington Heights Salt Kiln | | 4/16/2014 | $1,500.00 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | decking for bridges | | 4/21/2014 | $536.56 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | nuts,bolts,table boards,spray | | 4/21/2014 | $351.24 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood,spray glue,caulk and cabl | | 4/21/2014 | $118.10 |
Community Resources | Construc Costs-Site Improve | OREILLY AUTO 00027128 | acetone and bed liner paint fo | | 4/21/2014 | $80.57 |
Community Resources | Construc Costs-Site Improve | ACE HDWE OF JEWELL SQ | fasteners for boat docks. / fl | | 4/21/2014 | $14.00 |
Community Resources | Construc Costs-Site Improve | DEN-COL SUPPLY | steel plate to repair rusted o | | 4/21/2014 | $78.57 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 4/29/2014 | $95,429.40 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 5/1/2014 | $186,577.50 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 5/7/2014 | $83,849.56 |
Community Resources | Construc Costs-Site Improve | ALTERNATIVE ENERGY SOLAR & ELECTRIC | Flood repair- solar light | | 5/8/2014 | $3,026.00 |
Community Resources | Construc Costs-Site Improve | ALL SEASONS TENNIS COURTS | Bid 3645 Westborough Tennis | | 5/13/2014 | $43,048.00 |
Community Resources | Construc Costs-Site Improve | ALL SEASONS TENNIS COURTS | Add'l Road Base for Net Posts | | 5/13/2014 | $2,170.00 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Mountair Park 5625 W 13th Ave | | 5/15/2014 | $12,069.00 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | BCLP-Electrical Work | | 5/21/2014 | $2,260.00 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | BCLP-Electrical at marina | | 5/22/2014 | $4,080.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | 6x6x8 lumber for bridge | | 5/23/2014 | $174.79 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hangers, anchors for bridge | | 5/23/2014 | $105.17 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hangrs and screws for bridge | | 5/23/2014 | $26.46 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | screws and bits for bridge con | | 5/23/2014 | $124.93 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | concrete and wood to build new | | 5/23/2014 | $455.23 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | hardwarefor boat dock,rope | | 5/23/2014 | $128.90 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | screws, gloves,saw blades,gras | | 5/23/2014 | $138.72 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | 10 narrow leaf cottonwood tree | | 5/23/2014 | $800.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | dock anchor bolts and grass s | | 5/23/2014 | $91.73 |
Community Resources | Construc Costs-Site Improve | AGG IND AGG/ASP DISPTCH | repair material for washed out | | 5/23/2014 | $1,260.71 |
Community Resources | Construc Costs-Site Improve | CHAMPION FENCE & CONST SERVICES INC | Devinney - Gates | | 5/27/2014 | $930.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 5/29/2014 | $117,984.16 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Civic Center-Irrigation Repair | | 6/9/2014 | $1,261.63 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 6/19/2014 | $8,517.35 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | CC GARAGE EM LIGHTS | | 6/24/2014 | $1,576.80 |
Community Resources | Construc Costs-Site Improve | STOCKYARDS RANCH SUPPL | Metal roof for mini shelters a | | 6/24/2014 | $1,016.66 |
Community Resources | Construc Costs-Site Improve | FRONTIER BOLT INC | bolts and nuts to repair mini | | 6/24/2014 | $99.32 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | material to build 2 mini shelt | | 6/24/2014 | $849.60 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | commons garage- light fixtures | | 6/24/2014 | $851.25 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN DIST CO | commons garage- wire, fittings | | 6/24/2014 | $425.75 |
Community Resources | Construc Costs-Site Improve | MOUNTAIN AIRE MECHANICAL LLC | Washington Heights Salt Kiln | | 6/26/2014 | $2,797.00 |
Community Resources | Construc Costs-Site Improve | RNF CONSULTANTS INC | WH Monument Sign | | 6/26/2014 | $143.75 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 7/2/2014 | $71,001.18 |
Community Resources | Construc Costs-Site Improve | GLASER ELECTRIC COMPANY LLC | Mountair Park 5625 W 13th Ave | | 7/2/2014 | $1,341.00 |
Community Resources | Construc Costs-Site Improve | BENTHICA LLC | Video of aeration systm flood | | 7/8/2014 | $1,500.00 |
Community Resources | Construc Costs-Site Improve | VELOCITY CONSTRUCTORS INC | WEIR GULCH PUMPS AND FLOATS | | 7/9/2014 | $28,726.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 7/10/2014 | $161,559.80 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | wood and wire fore mini shelte | | 7/23/2014 | $23.64 |
Community Resources | Construc Costs-Site Improve | NEFF RENTAL LLC 77 | Civic Center - Lift rental for | | 7/23/2014 | $1,670.28 |
Community Resources | Construc Costs-Site Improve | ELCAR FENCE AND SUPPLY CO | Civic Center Garage-Fence | | 7/23/2014 | $4,205.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 7/31/2014 | $162,878.21 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 8/6/2014 | $81,671.31 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 8/7/2014 | $37,837.29 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #1 Add Pickleblall Posts & | | 8/7/2014 | $4,074.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 8/18/2014 | $29,290.25 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 8/20/2014 | $7,509.00 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | Sing Post - Cast Iron for Plaz | | 8/22/2014 | $374.32 |
Community Resources | Construc Costs-Site Improve | WW GRAINGER 064 | Plaza - Pedestal Display Board | | 8/22/2014 | $546.48 |
Community Resources | Construc Costs-Site Improve | KINKO'S INC | maps for Plaza Project | | 8/22/2014 | $133.74 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Lakewood Park | | 8/28/2014 | $4,313.34 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | Lakewood Playground-Pole Moved | | 8/29/2014 | $1,818.42 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 9/4/2014 | $9,771.20 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 9/10/2014 | $119,524.05 |
Community Resources | Construc Costs-Site Improve | JP JAQUEZ CONCRETE LLC | CONCRETE WORK AT WEIR GULCH | | 9/18/2014 | $12,474.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Civic Center-Irrig Repairs | | 9/18/2014 | $883.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Green Mountain Recreation | | 9/23/2014 | $1,059.55 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #2 Remove & Replace Fence | | 9/23/2014 | $1,825.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #3 Add 25 calendar days | | 9/23/2014 | $5,531.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | CO #4 - Add'l Work | | 9/23/2014 | $800.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Lakewood Park | | 10/9/2014 | $4,313.33 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 10/9/2014 | $10,714.58 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO #1 | | 10/9/2014 | ($28,959.50) |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO#2- Add Back SOW | | 10/9/2014 | $1,760.50 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO#3 Add'l Work = 13 cal days | | 10/9/2014 | $8,259.00 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO#4 Contract Bid Item 33 | | 10/9/2014 | $12,993.00 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO #5 Add'l Work | | 10/9/2014 | $611.60 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO #6 Add'l Work | | 10/9/2014 | $1,212.00 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO #7 Add'l Work + 28 cal days | | 10/9/2014 | $13,334.00 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | CO #8 Add 2 sets door stops to | | 10/9/2014 | $181.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Lakewood Park | | 10/15/2014 | $4,313.33 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 10/21/2014 | $108,932.18 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 10/21/2014 | $174,662.46 |
Community Resources | Construc Costs-Site Improve | HD INC | Tennis Hut-Painting | | 10/22/2014 | $1,750.00 |
Community Resources | Construc Costs-Site Improve | RYAN HERCO - MOTO | DOME TOP FOR WEIR GULCH PROJEC | | 10/22/2014 | $195.71 |
Community Resources | Construc Costs-Site Improve | NATURAL PLAYGROUNDS CO | Patterson Water Pump | | 10/22/2014 | $1,282.12 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Patterson deck piers sonotube | | 10/22/2014 | $8.14 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Change Order 1 | | 10/23/2014 | $3,859.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Patterson Nature Playground | | 10/29/2014 | $58,584.88 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | Washington Heights Center | | 10/30/2014 | $2,700.00 |
Community Resources | Construc Costs-Site Improve | LARKIN AND ASSOCIATES LLC | TENNIS HUT LABOR/MATERIALS | | 11/6/2014 | $252.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | 145952.CON EXCAVATION OBSERVE | | 11/10/2014 | $350.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 11/12/2014 | $33,027.20 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 11/12/2014 | $202,664.70 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 11/13/2014 | $7,509.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Patterson Nature Playground | | 12/9/2014 | $110.12 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Change order 1 - Plants, | | 12/9/2014 | $1,996.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Changer Order 2 - fencing rent | | 12/9/2014 | $977.29 |
Community Resources | Construc Costs-Site Improve | ERO RESOURCES CORPORATION | HOLBROOK PK 404 PERMITTING | | 12/9/2014 | $162.25 |
Community Resources | Construc Costs-Site Improve | CANYON LANDSCAPE AND DESIGN, LLC | Lakewood Park Playground | | 12/9/2014 | $14,469.30 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 12/17/2014 | $168,452.38 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 12/17/2014 | $52,578.10 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 12/18/2014 | $6,404.50 |
Community Resources | Construc Costs-Site Improve | UNDERWATER REPAIR SPECIALIST | Installation of New Lake | | 12/18/2014 | $18,500.00 |
Community Resources | Construc Costs-Site Improve | UNDERWATER REPAIR SPECIALIST | Installation of New Lake | | 12/18/2014 | ($18,500.00) |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | Washington Heights Center | | 12/23/2014 | $2,700.00 |
Community Resources | Construc Costs-Site Improve | LOWES #01903 | EQUIPMENT FOR SNOW DAY | | 12/23/2014 | $113.71 |
Community Resources | Construc Costs-Site Improve | ACTIVE CABLING & COMMUNICATIONS | 2014-CAB LE FOR SIGN WASH HGHT | | 1/8/2015 | $238.96 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 1/22/2015 | $350,574.62 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 1/22/2015 | $47,867.86 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | inv#245506 plaza recons. | | 1/26/2015 | $547.50 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | inv #244580 plaza recons. | | 1/26/2015 | $2,298.50 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 2/12/2015 | $201,688.82 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 2/19/2015 | $1,127.50 |
Community Resources | Construc Costs-Site Improve | AL LENZI GROUP INC | Washington Heights Arts Sign | | 2/19/2015 | $1,705.00 |
Community Resources | Construc Costs-Site Improve | ERO RESOURCES CORPORATION | 2014 HOLBROOK PARK 404 PERMITT | | 2/20/2015 | $378.80 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Bid 3729 Items 1,MT1-4, 6-9 | | 3/5/2015 | $75,921.05 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Addl - Remove & dispose of | | 3/5/2015 | $396.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Addl-Soil and sod prep | | 3/5/2015 | $1,485.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Addl - Haul Grading appox | | 3/5/2015 | $1,805.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 3/11/2015 | $180,699.99 |
Community Resources | Construc Costs-Site Improve | HARBOR FREIGHT TOOLS 230 | lights for Plaza walkways | | 3/16/2015 | $25.98 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction Project 2 | | 3/16/2015 | $824.00 |
Community Resources | Construc Costs-Site Improve | THE TRUESDELL CORPORATION | Drivelane Topping Restoration | | 3/19/2015 | $45,661.10 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 3/19/2015 | $75,044.24 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Construction - Masonry O | | 4/20/2015 | $1,105.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 5/7/2015 | $167,969.26 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Change Order #2-boiler room | | 5/7/2015 | $46,296.36 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Change Order #3-boiler room | | 5/7/2015 | $8,060.84 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Bid 3729 Items 1,MT1-4, 6-9 | | 5/7/2015 | $26,608.75 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #2 Add'l Concrete Walk | | 5/7/2015 | $27,060.48 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #2 Add'l Concrete Walk | | 5/7/2015 | $529.48 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 5/14/2015 | $45,025.44 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction Project | | 5/22/2015 | $1,319.50 |
Community Resources | Construc Costs-Site Improve | MECHANICAL SOLUTIONS INC | Plaza - Boilder | | 5/26/2015 | $212.66 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Bid 3729 Items 1,MT1-4, 6-9 | | 6/4/2015 | $4,765.72 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 6/17/2015 | $124,546.33 |
Community Resources | Construc Costs-Site Improve | AVALANCHE OF COLORS INC | Annual Maint. LCC Diner | | 6/22/2015 | $2,250.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction - Concret | | 6/23/2015 | $2,247.00 |
Community Resources | Construc Costs-Site Improve | KC CONSTRUCTION INC | Morse Park Restroom Renovation | | 6/24/2015 | $30,377.58 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Interior demo Daniels Center | | 6/25/2015 | $200.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 7/9/2015 | $24,735.56 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 7/9/2015 | $11,568.46 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 7/9/2015 | $17,448.14 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Add Alternate C-North Canopy | | 7/15/2015 | $165,023.85 |
Community Resources | Construc Costs-Site Improve | CONSOLIDATED ELECTRICAL DISTRIBUTORS | Civic Center - Plaza Lights | | 7/20/2015 | $3,102.30 |
Community Resources | Construc Costs-Site Improve | WEST METRO FIRE PROTECTIO | Daniels Head Start Renovation- | | 7/21/2015 | $280.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | ESTES MOTEL BACK-OUT,PREP | | 7/23/2015 | $95.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Estes Motel/correct shortage | | 7/24/2015 | $100.00 |
Community Resources | Construc Costs-Site Improve | INFINITE ELECTRIC LLC | Electrical-Estes Motel | | 8/4/2015 | $1,648.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Estes Motel | | 8/13/2015 | $136.00 |
Community Resources | Construc Costs-Site Improve | KC CONSTRUCTION INC | Morse Park Restroom Renovation | | 8/19/2015 | $3,714.02 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/19/2015 | $1,462.50 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/19/2015 | $10,606.25 |
Community Resources | Construc Costs-Site Improve | SQ BEVERLY HILLS GLASS R | Daniels Renovation- New Window | | 8/19/2015 | $285.00 |
Community Resources | Construc Costs-Site Improve | GREEN MOUNTAIN ACE HARDWARE | Daniels Renovation- Constructi | | 8/19/2015 | $34.99 |
Community Resources | Construc Costs-Site Improve | CHARLES D JONES/DENVER | Coms South/limit switch for sn | | 8/19/2015 | $222.67 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 8/25/2015 | $239,056.90 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Civic Center Planting per | | 8/26/2015 | $14,863.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Add'l Mulch per Change Order 1 | | 8/26/2015 | $2,700.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Estes Motel Site Work | | 9/16/2015 | $15,234.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Change Order 1- Estes Motel | | 9/16/2015 | $6,862.55 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 9/16/2015 | $1,112.50 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction | | 9/22/2015 | $137.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction | | 9/22/2015 | $296.50 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Civic Center Plaza Plants | | 9/28/2015 | $314.20 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Plaza Reconstruction - Concret | | 9/28/2015 | $227.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Estes Motel Site Work | | 10/5/2015 | $3,740.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Change Order 1- Estes Motel | | 10/9/2015 | $2,952.45 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Civic Center Plants Rabbit Rep | | 10/22/2015 | $24.98 |
Community Resources | Construc Costs-Site Improve | THE PERSONAL TOUCH | Construction excellence award | | 10/22/2015 | $226.60 |
Community Resources | Construc Costs-Site Improve | UNIVERSITY OF COLORADO AT DENVER | Per MOU | | 10/28/2015 | $7,500.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 11/2/2015 | $129,739.14 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 11/4/2015 | $5,850.00 |
Community Resources | Construc Costs-Site Improve | VAN VAN ENGELEN FLOWER | Flower Bulbs Civic Center Plan | | 11/23/2015 | $101.78 |
Community Resources | Construc Costs-Site Improve | FOSSIL INDUSTRIES INC | Holbrook Sign | | 12/16/2015 | $663.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 12/29/2015 | $5,643.75 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 12/29/2015 | $134.55 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 1/11/2016 | $20,349.49 |
Community Resources | Construc Costs-Site Improve | ERO RESOURCES CORPORATION | Holbrook Park 404 Permitting | | 1/22/2016 | $355.21 |
Community Resources | Construc Costs-Site Improve | NVB PLAYGROUNDS INC | Dish Swing Mat Green Gables | | 1/29/2016 | $713.00 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Civic Center Plaza | | 2/3/2016 | $7,549.11 |
Community Resources | Construc Costs-Site Improve | DO NOT USE - NEWSTROM-DAVIS CONSTRUCTION | Change Order #3-boiler room | | 2/3/2016 | $2,686.95 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 3/24/2016 | $4,574.18 |
Community Resources | Construc Costs-Site Improve | AVOCET IRRIGATION DESIGN | Daniel's Comm Cen Irr Design | | 3/30/2016 | $600.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | 2015 Morse Park Tennis Court | | 4/7/2016 | $57,000.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 4/14/2016 | $28,815.50 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 4/14/2016 | $182.85 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | 2015 Morse Park Tennis Court | | 4/21/2016 | $163,648.90 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Per RFP 3881 | | 4/21/2016 | $40,000.00 |
Community Resources | Construc Costs-Site Improve | TRIPLE M RECREATION LLC | Additional Funds | | 4/21/2016 | $0.03 |
Community Resources | Construc Costs-Site Improve | METRO GROUND MAINTENANCE | Playground Removal - Bonfils | | 4/28/2016 | $3,390.00 |
Community Resources | Construc Costs-Site Improve | METRO GROUND MAINTENANCE | Change Order #1 Playground | | 4/28/2016 | $1,735.00 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Daniel's CC Irrigation | | 5/4/2016 | $4,790.00 |
Community Resources | Construc Costs-Site Improve | COLUMBINE TREE SERVICE | Tree Transplants | | 5/4/2016 | $1,000.00 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Concrete Sampling | | 5/5/2016 | $1,053.50 |
Community Resources | Construc Costs-Site Improve | INTERMOUNTAIN LANDSCAPE & SPRINKLER INC | Daniel's Community Center | | 5/23/2016 | $455.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | 2015 Morse Park Tennis Court | | 6/8/2016 | $45,047.10 |
Community Resources | Construc Costs-Site Improve | MADE IN THE SCHADE | Bonfils Stanton Playground | | 6/15/2016 | $17,311.00 |
Community Resources | Construc Costs-Site Improve | UNIVERSITY OF COLORADO AT DENVER | Lasley Park Master Plan | | 6/21/2016 | $7,500.00 |
Community Resources | Construc Costs-Site Improve | ARC LANDSCAPE SUPPLY | Rock for Daniels Community Cen | | 6/29/2016 | $189.25 |
Community Resources | Construc Costs-Site Improve | ARC LANDSCAPE SUPPLY | Rock for Daniels Community Cen | | 6/29/2016 | $98.99 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Daniels Comm Ctr Trees | | 6/29/2016 | $515.00 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Daniels Comm Ctr Shrubs & Pere | | 6/29/2016 | $516.25 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 6/30/2016 | $2,140.63 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 6/30/2016 | $108.42 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Add to Amendment 4 | | 6/30/2016 | $454.93 |
Community Resources | Construc Costs-Site Improve | JEFFERSON COUNTY OPEN SPACE | Peaks to Trails Contribution | | 7/5/2016 | $25,000.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | 2015 Morse Park Tennis Court | | 7/28/2016 | $37,709.30 |
Community Resources | Construc Costs-Site Improve | BIGFOOT TURF FARMS INC | Sod for Daniels CC | | 7/31/2016 | $974.14 |
Community Resources | Construc Costs-Site Improve | MADE IN THE SCHADE | Bonfils Stanton Playground | | 8/11/2016 | $32,688.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/11/2016 | $2,142.52 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | Crown Hill Park | | 8/15/2016 | $268.50 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Concrete Work - Crown Hill | | 8/16/2016 | $21,988.80 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 8/31/2016 | $312,138.06 |
Community Resources | Construc Costs-Site Improve | GOODLAND CONSTRUCTION INC | Westgate Elementary Fence | | 9/21/2016 | $19,090.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | 2015 Morse Park Tennis Court | | 9/29/2016 | $15,968.70 |
Community Resources | Construc Costs-Site Improve | CONSERVE A WATT-PAY TR | Richie Park - LED Lighting | | 9/30/2016 | $5,899.60 |
Community Resources | Construc Costs-Site Improve | BRISTLECONE CONSTRUCTION CORP | Founders Park Playground | | 10/6/2016 | $121,861.54 |
Community Resources | Construc Costs-Site Improve | COLORADO TREE EXPERTS | Tree and brush clean up | | 10/10/2016 | $850.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 10/13/2016 | $333,007.30 |
Community Resources | Construc Costs-Site Improve | ACE HDWE OF JEWELL SQ | Cotter Pins for Patterson Wate | | 10/31/2016 | $2.94 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 11/3/2016 | $4,187.46 |
Community Resources | Construc Costs-Site Improve | BRISTLECONE CONSTRUCTION CORP | Founders Park Playground | | 11/8/2016 | $142,512.54 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 11/16/2016 | $762,746.09 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 12/15/2016 | $188,635.80 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 12/15/2016 | $4,300.86 |
Community Resources | Construc Costs-Site Improve | ID SCULPTURE | Bear Club Climbing | | 1/26/2017 | $3,725.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 1/26/2017 | $2,201.10 |
Community Resources | Construc Costs-Site Improve | BELLINO ELECTRIC SERVICES LLC | Provide and install electrical | | 2/1/2017 | $13,760.00 |
Community Resources | Construc Costs-Site Improve | BRISTLECONE CONSTRUCTION CORP | Founders Park Playground | | 2/8/2017 | $49,492.14 |
Community Resources | Construc Costs-Site Improve | BRISTLECONE CONSTRUCTION CORP | CO #1 Add'l SOW | | 2/8/2017 | $3,278.00 |
Community Resources | Construc Costs-Site Improve | BRISTLECONE CONSTRUCTION CORP | CO #2 | | 2/8/2017 | $1,320.68 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 2/8/2017 | $248,929.10 |
Community Resources | Construc Costs-Site Improve | BEACON COMMUNICATIONS | Dec 2016 - WRC - Hirsch Securi | | 2/15/2017 | $4,123.28 |
Community Resources | Construc Costs-Site Improve | JEFFCO PUBLIC SCHOOLS | WESTGATE PLAYGROUND PROJECT | | 2/16/2017 | $50,000.00 |
Community Resources | Construc Costs-Site Improve | ID SCULPTURE | Shipping | | 2/22/2017 | $600.00 |
Community Resources | Construc Costs-Site Improve | ID SCULPTURE | Bear Club Climbing | | 2/22/2017 | $3,725.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 2/23/2017 | $2,188.21 |
Community Resources | Construc Costs-Site Improve | GAMETIME INC | Westborough Park Playground | | 3/2/2017 | $33,361.18 |
Community Resources | Construc Costs-Site Improve | GAMETIME INC | Westborough Park Playground | | 3/2/2017 | $7,405.82 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 3/8/2017 | $200,723.77 |
Community Resources | Construc Costs-Site Improve | GREENFIELDS OUTDOOR FITNESS | Carmody Fitness Equip & Instal | | 3/9/2017 | $47,161.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 3/15/2017 | $2,100.00 |
Community Resources | Construc Costs-Site Improve | STAR PLAYGROUNDS | Sutherland Shire Park | | 3/22/2017 | $50,879.00 |
Community Resources | Construc Costs-Site Improve | STILES ENVIRONMENTAL & INDUSTRIAL | Caretaker's Cottage | | 3/27/2017 | $1,270.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 4/6/2017 | $2,100.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 4/6/2017 | $28.07 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 4/13/2017 | $83,011.27 |
Community Resources | Construc Costs-Site Improve | CONTI ELECTRIC, INC. | O'Kane Park House Electrical | | 4/13/2017 | $4,350.00 |
Community Resources | Construc Costs-Site Improve | AGUILERA CONCRETE CONSTRUCTION LLC | CURB DETAIL BCLP-BEAR CUB | | 4/17/2017 | $4,410.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Sonotube for basketball net st | | 4/18/2017 | $12.75 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Lakewood Heritage Center | | 4/20/2017 | $27,261.80 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | CO # 1 | | 4/20/2017 | $180.66 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Sutherland Shire & Westborough | | 4/26/2017 | $98,577.76 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 5/3/2017 | $164,295.35 |
Community Resources | Construc Costs-Site Improve | G & S SOLUTIONS LLC | ball field-Lkwd Pk field 1 | | 5/15/2017 | $10,185.16 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | Post Hardware, Auction Barn | | 5/17/2017 | $43.84 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Zip Ties to hang "keep out" si | | 5/17/2017 | $7.27 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | CO # 1 | | 5/24/2017 | $1,444.34 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Sutherland Shire & Westborough | | 5/25/2017 | $88,220.47 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | CO #1 Add 5 calendar days | | 5/25/2017 | $10,006.50 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | Reimbursable Expenses | | 5/31/2017 | $742.50 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | Build and powder coat tubular | | 5/31/2017 | $5,938.00 |
Community Resources | Construc Costs-Site Improve | ARCO CONCRETE INC | Custom Bollards | | 6/7/2017 | $3,428.00 |
Community Resources | Construc Costs-Site Improve | ARCO CONCRETE INC | Delivery to 5370 W Ohio Ave | | 6/7/2017 | $200.00 |
Community Resources | Construc Costs-Site Improve | ARCO CONCRETE INC | Additional Bollard | | 6/7/2017 | $210.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 6/8/2017 | $115,549.19 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #2 - Add'l Items | | 6/8/2017 | $50,474.37 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #3 Addi' Items/Work | | 6/8/2017 | $37,249.70 |
Community Resources | Construc Costs-Site Improve | SULLI'S LANDSCAPING INC | 40W ARTline Crusher-fines Path | | 6/14/2017 | $7,002.00 |
Community Resources | Construc Costs-Site Improve | GABION1 INV 2587 | Lasley Park Materials | | 6/21/2017 | $117.41 |
Community Resources | Construc Costs-Site Improve | PIONEER SAND COMPANY | Sand for visitor center flagst | | 6/21/2017 | $203.06 |
Community Resources | Construc Costs-Site Improve | PIONEER SAND COMPANY | Flagstone for visitor center p | | 6/21/2017 | $2,220.50 |
Community Resources | Construc Costs-Site Improve | PIONEER SAND COMPANY | Sand for visitor center flagst | | 6/21/2017 | $176.14 |
Community Resources | Construc Costs-Site Improve | STAR PLAYGROUNDS | Sutherland Shire Park | | 6/22/2017 | $18,906.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 6/22/2017 | $2,126.12 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Sutherland Shire & Westborough | | 6/29/2017 | $115,673.30 |
Community Resources | Construc Costs-Site Improve | PHILADELPHIA INDEMNITY INSURANCE COMPANY | Civic Center Plaza | | 6/29/2017 | $157,675.08 |
Community Resources | Construc Costs-Site Improve | PHILADELPHIA INDEMNITY INSURANCE COMPANY | Civic Center Plaza | | 6/29/2017 | $33.25 |
Community Resources | Construc Costs-Site Improve | PHILADELPHIA INDEMNITY INSURANCE COMPANY | Deductive Change Order 1 | | 6/29/2017 | ($51,541.16) |
Community Resources | Construc Costs-Site Improve | GAMETIME INC | Westborough Park Playground | | 7/12/2017 | $10,750.00 |
Community Resources | Construc Costs-Site Improve | BANNER SIGNS & DECALS | Sign fabrication for Carmody E | | 7/24/2017 | $316.00 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Wood Stakes for Carmody Temp S | | 7/24/2017 | $106.61 |
Community Resources | Construc Costs-Site Improve | UPBEAT INC | State Stops for Carmody Benche | | 7/24/2017 | $758.30 |
Community Resources | Construc Costs-Site Improve | LOWES #01903 | Shelving for Carmody | | 7/24/2017 | $427.98 |
Community Resources | Construc Costs-Site Improve | FORUM ENGRAVING COMPANY | Carmody Park | | 7/24/2017 | $435.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/3/2017 | $1,545.39 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/3/2017 | $554.61 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/3/2017 | $6,300.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Sutherland Shire & Westborough | | 8/10/2017 | $100,528.47 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | CO #1 Add 5 calendar days | | 8/10/2017 | $1,695.00 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | CO 2 - Add 10 calendar days | | 8/10/2017 | $10,483.35 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/10/2017 | $6,300.00 |
Community Resources | Construc Costs-Site Improve | RENNER SPORTS SURFACES | Addenbrooke Park Tennis Court | | 8/16/2017 | $128,991.00 |
Community Resources | Construc Costs-Site Improve | TATONKA PLAYGROUNDS | Play surface BCLP | | 8/17/2017 | $3,438.50 |
Community Resources | Construc Costs-Site Improve | COLORADO SPECIALTIES CORP | Carmody Playground Restroom Mi | | 8/23/2017 | $851.64 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Dish Washer for WRC | | 8/23/2017 | $398.00 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | LHC Amphitheater Replacement | | 8/30/2017 | $14,003.84 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | CO 2 - Add 10 calendar days | | 8/30/2017 | $22,378.15 |
Community Resources | Construc Costs-Site Improve | PLAYCO PARK BUILDERS INC | DANIEL'S COMMUNITY CENTER | | 9/6/2017 | $1,985.00 |
Community Resources | Construc Costs-Site Improve | K&K CUSTOM FABRICATION & WELDING INC. | carmody playground railing | | 9/14/2017 | $20,025.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 9/20/2017 | $6,300.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 9/21/2017 | $4,158.25 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 9/29/2017 | $63,848.83 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | Sutherland Shire Park Main | | 10/18/2017 | $26,962.02 |
Community Resources | Construc Costs-Site Improve | RNF CONSULTANTS INC | Recreation Centers - Signs | | 10/18/2017 | $1,092.50 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | LHC Amphitheater Replacement | | 10/24/2017 | $5,301.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Carmody Park Phase I Site | | 11/1/2017 | $102,355.24 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #1 | | 11/1/2017 | ($13,634.00) |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #4 | | 11/1/2017 | $22,010.27 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO #5 | | 11/1/2017 | $24,026.85 |
Community Resources | Construc Costs-Site Improve | CABINFIELD WOODWORKING | Down Payment on Log Gazebo for | | 11/27/2017 | $2,673.50 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 12/6/2017 | $3,109.75 |
Community Resources | Construc Costs-Site Improve | RESTORATION CONCRETE INC | BCLP Visitor Center Pad | | 12/11/2017 | $4,995.00 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | Sutherland Shire Park Main | | 12/14/2017 | $38,953.91 |
Community Resources | Construc Costs-Site Improve | BARBIZON LIGHT | LED Lights for Lakewood | | 12/28/2017 | $71,508.00 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | Sutherland Shire Park Main | | 1/11/2018 | $30,556.44 |
Community Resources | Construc Costs-Site Improve | CABINFIELD WOODWORKING | Final Payment Log Gazebo BCLP | | 1/19/2018 | $2,673.50 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | Sutherland Shire Park Main | | 1/24/2018 | $20,783.58 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | CO #1 Qty Deducts +3 cal days | | 1/24/2018 | ($12,727.00) |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | CO #2 Adds + 3 calendar days | | 1/24/2018 | $13,813.69 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 2/1/2018 | $166,231.00 |
Community Resources | Construc Costs-Site Improve | ACTIVE CABLING & COMMUNICATIONS | Relocate camera cable & camera | | 2/15/2018 | $479.51 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | Log Gazebo Post Bases, BCLP Vi | | 2/20/2018 | $474.56 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | CO #2 Adds + 3 calendar days | | 2/27/2018 | $14,785.31 |
Community Resources | Construc Costs-Site Improve | JL MELTON CONSTRUCTION | CO #3 Add'l Work # 3 days | | 2/27/2018 | $5,030.55 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 3/5/2018 | $179,120.60 |
Community Resources | Construc Costs-Site Improve | BARBIZON LIGHT | LED Lights for Lakewood | | 3/15/2018 | $76,174.10 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 4/5/2018 | $199,127.22 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Forsberg Iron Springs Parking | | 4/12/2018 | $83,355.85 |
Community Resources | Construc Costs-Site Improve | POINT TO POINT ELECTRIC INC | HODGSON PARK | | 4/19/2018 | $3,975.00 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | LHC Amphitheater Replacement | | 4/24/2018 | $136,864.86 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 4/24/2018 | $5,820.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Forsberg Iron Springs Parking | | 5/1/2018 | $24,957.45 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 5/7/2018 | $310,066.18 |
Community Resources | Construc Costs-Site Improve | BANCROFT CLOVER W & S DIST | LASLEY YPARK WATER SERVICE | | 5/9/2018 | $791.62 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 5/17/2018 | $3,720.00 |
Community Resources | Construc Costs-Site Improve | ALPINE ROOFING CO INC | BCLP GAZEBO ROOF | | 5/30/2018 | $1,856.99 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 6/5/2018 | $296,366.13 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 1 Add'l Work | | 6/5/2018 | $9,218.29 |
Community Resources | Construc Costs-Site Improve | FRONT RANGE LUMBER | Stakes and flags to mark plant | | 6/18/2018 | $33.99 |
Community Resources | Construc Costs-Site Improve | AFC REALTY & MANAGEMENT INC | HILLTOP PARK SPRINKLER REPAIR | | 6/26/2018 | $378.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 7/5/2018 | $3,720.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | Forsberg Iron Springs Parking | | 7/5/2018 | $66,290.70 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | CO 1 Add'l Work | | 7/5/2018 | $20,710.06 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | Devinney 28' Shelter install | | 7/5/2018 | $5,500.50 |
Community Resources | Construc Costs-Site Improve | DESIGNSCAPES COLORADO INC | Hodgson Park Ramp & Stairs | | 7/9/2018 | $33,000.00 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 7/16/2018 | $200,520.87 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Parks Maintenance Building | | 7/17/2018 | $32,263.00 |
Community Resources | Construc Costs-Site Improve | AVOCET IRRIGATION DESIGN | BCLP VISTORS CENTER | | 7/30/2018 | $1,000.00 |
Community Resources | Construc Costs-Site Improve | BATES ENGINEERING INC | Belmar boardwalk design | | 8/1/2018 | $2,925.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/8/2018 | $1,860.00 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | CO 1 Add'l Work | | 8/14/2018 | $10,279.69 |
Community Resources | Construc Costs-Site Improve | CRITICAL PATH LTD | CO 2 Add'l Work | | 8/14/2018 | $5,840.00 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 8/15/2018 | $3,720.00 |
Community Resources | Construc Costs-Site Improve | WEST METRO FIRE PROTECTIO | PSC LOCKER ROOM PERMIT | | 8/21/2018 | $497.03 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Hilltop Park - Park and | | 9/4/2018 | $32,934.13 |
Community Resources | Construc Costs-Site Improve | CREATIVE SAFETY SUPPLY | REFLECTIVE TAPE | | 9/19/2018 | $81.88 |
Community Resources | Construc Costs-Site Improve | CALAHAN CONSTRUCTION SERVICES | Carmody Recreation Center | | 9/25/2018 | $72,699.94 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | CONCRETE SAW CUTTING | | 9/26/2018 | $300.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | SIDEWALK DEMO | | 9/26/2018 | $796.25 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | CURB & GUTTER DEMO | | 9/26/2018 | $190.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | ROTOMILL | | 9/26/2018 | $1,700.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | EARTHWORK | | 9/26/2018 | $800.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | NEW SIDEWALK SETION | | 9/26/2018 | $3,071.25 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | NEW CURB & GUTTER | | 9/26/2018 | $290.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | ASPHALT OVERLAY | | 9/26/2018 | $8,334.50 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | MOBILIZATION/DEMOBILIZATION | | 9/26/2018 | $1,500.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Change Order #1 | | 9/26/2018 | $350.00 |
Community Resources | Construc Costs-Site Improve | BEAUTIFUL DE K LLC | Lasley Park - Painting | | 9/26/2018 | $700.00 |
Community Resources | Construc Costs-Site Improve | CTM INC | MOBILIZATION & | | 9/27/2018 | $2,900.00 |
Community Resources | Construc Costs-Site Improve | CTM INC | IRRIGATION ADDITIONS & | | 9/27/2018 | $7,500.00 |
Community Resources | Construc Costs-Site Improve | CTM INC | SITE CLEAN UP & | | 9/27/2018 | $3,300.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Hilltop Park - Park and | | 10/2/2018 | $139,685.19 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Site Improvements | | 10/4/2018 | $23,717.00 |
Community Resources | Construc Costs-Site Improve | HPM INC | CO 1 Add' Work | | 10/4/2018 | $23,600.00 |
Community Resources | Construc Costs-Site Improve | HPM INC | CO 2 Additions/Deletions | | 10/4/2018 | $27,891.00 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | Devinney 28' Shelter install | | 10/4/2018 | $5,797.05 |
Community Resources | Construc Costs-Site Improve | TERRA AUTOMATED SYSTEMS | irrigation supplies | | 10/25/2018 | $1,750.56 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Hilltop Park - Park and | | 11/1/2018 | $1,432.18 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | Devinney 28' Shelter install | | 11/2/2018 | $22,800.00 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 2 Concrete Work | | 11/6/2018 | $21,646.34 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | PSC INSPECTIONS | | 11/7/2018 | $1,265.48 |
Community Resources | Construc Costs-Site Improve | CALAHAN CONSTRUCTION SERVICES | Carmody Recreation Center | | 11/15/2018 | $169,824.42 |
Community Resources | Construc Costs-Site Improve | BOWMAN CONSTRUCTION SUPPL | Plastic Temp. Fencing Carmod | | 11/15/2018 | $225.77 |
Community Resources | Construc Costs-Site Improve | WEST METRO FIRE PROTECTIO | WH REMODEL PLAN CHECK | | 11/15/2018 | $269.08 |
Community Resources | Construc Costs-Site Improve | WHEAT RIDGE PLUMBING & HEATING | morse park drinking fountain | | 11/19/2018 | $5,342.68 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | Devinney 28' Shelter install | | 11/20/2018 | $7,062.45 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | CO #4 Add'l Work | | 11/20/2018 | $3,937.55 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | Hilltop Park - Park and | | 12/5/2018 | $53,035.50 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO 1 Add 7 days | | 12/5/2018 | $6,160.79 |
Community Resources | Construc Costs-Site Improve | WALKER CONSULTANTS INC | AE Svcs Plaza Restoration | | 12/12/2018 | $1,860.00 |
Community Resources | Construc Costs-Site Improve | CALAHAN CONSTRUCTION SERVICES | Carmody Recreation Center | | 12/12/2018 | $156,900.09 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | CO #4 Add'l Work | | 12/19/2018 | $1,941.45 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 3 Concrete-related work | | 12/20/2018 | $1,339.50 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | LHC Amphitheater Replacement | | 12/20/2018 | $13,868.30 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 1 Add'l Work | | 12/20/2018 | $5,362.27 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 2 Concrete Work | | 12/20/2018 | $1,139.66 |
Community Resources | Construc Costs-Site Improve | SPAN SYSTEMS INC | CO 3 Concrete-related work | | 12/20/2018 | $70.50 |
Community Resources | Construc Costs-Site Improve | CALAHAN CONSTRUCTION SERVICES | Carmody Recreation Center | | 1/9/2019 | $108,618.26 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | Belmar Park Boardwalk | | 1/24/2019 | $120,742.01 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | CO 1 Add'l Work | | 1/24/2019 | $4,002.00 |
Community Resources | Construc Costs-Site Improve | CITY OF EDGEWATER | Walker Branch Park Improvement | | 2/4/2019 | $54,765.17 |
Community Resources | Construc Costs-Site Improve | NATIONAL FITNESS CAMPAIGN LLC | Outdoor Bodyweight Circuit | | 2/13/2019 | $45,000.00 |
Community Resources | Construc Costs-Site Improve | RICHDELL CONSTRUCTION INC | CO 1 Add 7 days | | 2/13/2019 | $15,434.09 |
Community Resources | Construc Costs-Site Improve | BANNER SIGNS & DECALS | 2018-BCLP Exploration Ridge Si | | 2/20/2019 | $150.00 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | Belmar Park Boardwalk | | 3/13/2019 | $23,730.05 |
Community Resources | Construc Costs-Site Improve | NATIONAL FITNESS CAMPAIGN LLC | Outdoor Bodyweight Circuit | | 3/21/2019 | $49,000.00 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | Belmar Park Boardwalk | | 4/18/2019 | $14,345.00 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | Belmar Park Boardwalk | | 5/7/2019 | $7,687.83 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | concrete testing | | 5/13/2019 | $273.50 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | BCLP Shelter Repairs | | 5/15/2019 | $19,238.00 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | Change Order One | | 5/15/2019 | $2,236.00 |
Community Resources | Construc Costs-Site Improve | ALAMEDA WHOLESALE NURSERY | Pollinator Plants for Earth Da | | 5/21/2019 | $2,166.20 |
Community Resources | Construc Costs-Site Improve | WASTE MGMT WM EZPAY | dumpster | | 5/21/2019 | $265.30 |
Community Resources | Construc Costs-Site Improve | CALAHAN CONSTRUCTION SERVICES | Carmody Recreation Center | | 5/29/2019 | $160,797.02 |
Community Resources | Construc Costs-Site Improve | RMC CONSULTANTS INC | Belmar Park Boardwalk | | 6/4/2019 | $8,974.04 |
Community Resources | Construc Costs-Site Improve | WIDGEON RIVER, HANDDRY | Replacement Hand Dryer Carmody | | 6/13/2019 | $808.16 |
Community Resources | Construc Costs-Site Improve | RECREATION PLUS LTD | WRC BASKET BALL HOOP | | 7/8/2019 | $1,467.00 |
Community Resources | Construc Costs-Site Improve | HARRIS KOCHER SMITH | ADDENBROOKE PARK LOCATES | | 7/11/2019 | $175.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Clements Community Center | | 7/24/2019 | $100,019.25 |
Community Resources | Construc Costs-Site Improve | RECREATION PLUS LTD | Basket ball hoop for WRC | | 8/6/2019 | $1,117.00 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | CUST NO. 5395767254 | | 8/12/2019 | $3,264.00 |
Community Resources | Construc Costs-Site Improve | XCEL ENERGY | CUST NO. 5395757254 | | 8/12/2019 | $3,264.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Svcs Task | | 8/22/2019 | $4,917.00 |
Community Resources | Construc Costs-Site Improve | RECREATION PLUS LTD | WRC BASKET BALL HOOP | | 8/26/2019 | ($1,467.00) |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | CCC ADA RAMP | | 8/26/2019 | $4,950.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Svcs Task | | 8/29/2019 | $13,800.00 |
Community Resources | Construc Costs-Site Improve | MCCLARD CEILING'S | ENCORE ROOM CEILING REPAIR | | 9/5/2019 | $154.00 |
Community Resources | Construc Costs-Site Improve | PATRIOT ELECTRIC LLC | LCC Classroom 3/Encore Room | | 9/12/2019 | $390.00 |
Community Resources | Construc Costs-Site Improve | NATIONAL FITNESS CAMPAIGN LLC | ADDENBROOKE CUSTOM GRAPHICS | | 9/12/2019 | $5,000.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Svcs Task | | 9/12/2019 | $1,980.00 |
Community Resources | Construc Costs-Site Improve | WASTE MGMT WM EZPAY | Roll-Off Dumpster- Lakewood Cu | | 9/13/2019 | $1,358.57 |
Community Resources | Construc Costs-Site Improve | ENGINEERED INSTALLATION SOLUTIONS LLC | 'Fitness Court' Assembly & | | 9/17/2019 | $18,500.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Svcs Task | | 9/18/2019 | $600.00 |
Community Resources | Construc Costs-Site Improve | AVALANCHE OF COLORS INC | LCC CLASSROOM #3 REMODEL | | 9/18/2019 | $840.00 |
Community Resources | Construc Costs-Site Improve | PRIDE CONSTRUCTION LLC | Fitness Court Foundation | | 9/26/2019 | $49,325.28 |
Community Resources | Construc Costs-Site Improve | FIVESTAR CONSTRUCTION LLC | Remove/Replace Failed Curb | | 10/8/2019 | $2,900.00 |
Community Resources | Construc Costs-Site Improve | AMERICAN HARLEQUIN CORP | Permit Fee Reimbursement | | 10/15/2019 | $150.00 |
Community Resources | Construc Costs-Site Improve | MILE HIGH GRAPHICS | Fitness Court wrap installatio | | 10/15/2019 | $1,600.00 |
Community Resources | Construc Costs-Site Improve | UPBEAT INC | Addenbrooke Park-fitness courr | | 10/15/2019 | $677.17 |
Community Resources | Construc Costs-Site Improve | UPBEAT INC | Addenbrooke Park-fitness court | | 10/15/2019 | $637.00 |
Community Resources | Construc Costs-Site Improve | 4TE JDE INC | Fire Alarm Strobe Relocation: | | 10/15/2019 | $257.00 |
Community Resources | Construc Costs-Site Improve | WEST METRO FIRE PROTECTIO | West Metro Permit Fee: LCC Cla | | 10/15/2019 | $112.50 |
Community Resources | Construc Costs-Site Improve | SQ BEVERLY HILLS GLASS R | Dance Mirror Installation: LCC | | 10/15/2019 | $4,550.00 |
Community Resources | Construc Costs-Site Improve | TREYS TURF LLC | Addenbrooke- Synthetic Grass | | 10/16/2019 | $17,518.75 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 10/23/2019 | $12,350.00 |
Community Resources | Construc Costs-Site Improve | PRIDE CONSTRUCTION LLC | Fitness Court Foundation | | 10/31/2019 | $1,763.50 |
Community Resources | Construc Costs-Site Improve | PRIDE CONSTRUCTION LLC | CO 1 Final | | 10/31/2019 | $885.70 |
Community Resources | Construc Costs-Site Improve | LAKEWOOD PLUMBING, LLC | Montair Fountain Plumbing | | 11/14/2019 | $11,900.00 |
Community Resources | Construc Costs-Site Improve | LAKEWOOD PLUMBING, LLC | Additional Valve Option 1 | | 11/14/2019 | $1,040.00 |
Community Resources | Construc Costs-Site Improve | AEGIS LIFE AND FIRE SAFET | north civic center garage, FA | | 11/14/2019 | $240.00 |
Community Resources | Construc Costs-Site Improve | ECHTER'S GARDEN CENTER | Pollinator garden plants | | 11/14/2019 | $66.36 |
Community Resources | Construc Costs-Site Improve | THE HOME DEPOT 1514 | Pollinator garden planting soi | | 11/14/2019 | $42.84 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | General Construction Services | | 11/19/2019 | $4,154.00 |
Community Resources | Construc Costs-Site Improve | SINGLE TRACK CONSTRUCTION SERVICES LLC | General Construction Services | | 11/19/2019 | $1,499.00 |
Community Resources | Construc Costs-Site Improve | RECREATION PLUS LTD | BENCH SLAT -5 ' LONG | | 11/27/2019 | $8,060.00 |
Community Resources | Construc Costs-Site Improve | RECREATION PLUS LTD | FREIGHT | | 11/27/2019 | $742.00 |
Community Resources | Construc Costs-Site Improve | AMERICAN DEMOLITION, LLC | Meadowlark Cottages Building | | 12/4/2019 | $37,000.00 |
Community Resources | Construc Costs-Site Improve | AMERICAN DEMOLITION, LLC | CO 1 Add'l Topsoil | | 12/4/2019 | $1,250.00 |
Community Resources | Construc Costs-Site Improve | HPM INC | Lasley Park Concrete Warranty | | 12/5/2019 | $4,698.00 |
Community Resources | Construc Costs-Site Improve | LARKIN & ASSOCIATES | Fabrication/Installation of Cu | | 12/13/2019 | $500.00 |
Community Resources | Construc Costs-Site Improve | AMERICAN DEMOLITION, LLC | CO 1 Add'l Topsoil | | 12/19/2019 | $4,250.00 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 1/9/2020 | $9,500.00 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 1/22/2020 | $53,361.50 |
Community Resources | Construc Costs-Site Improve | PATRIOT ELECTRIC LLC | Electrical Services | | 1/29/2020 | $2,320.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Services | | 1/30/2020 | $350.00 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 2/11/2020 | $57,950.00 |
Community Resources | Construc Costs-Site Improve | LARKIN & ASSOCIATES | Sheet Vinyl Flooring Material- | | 2/12/2020 | $985.23 |
Community Resources | Construc Costs-Site Improve | LARKIN & ASSOCIATES | Labor for Installation of Shee | | 2/12/2020 | $2,400.00 |
Community Resources | Construc Costs-Site Improve | HIGH COUNTRY GARDENS-I | Pollinator Garden Plants | | 2/12/2020 | $781.77 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Change Order 1 | | 2/13/2020 | $2,825.00 |
Community Resources | Construc Costs-Site Improve | CHAVEZ SERVICES LLC | Morse Parl Pool Concrete Work | | 2/13/2020 | $18,954.25 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | MOUNTAIR INSPECTIONS | | 2/19/2020 | $492.00 |
Community Resources | Construc Costs-Site Improve | AVALANCHE OF COLORS INC | LCC-EMORY DANCE STUDIO | | 2/27/2020 | $450.00 |
Community Resources | Construc Costs-Site Improve | JAMES A WILLIAMSON | General Construction Services | | 2/27/2020 | $2,719.00 |
Community Resources | Construc Costs-Site Improve | GAMETIME INC | Addenbrooke Park Playground | | 3/11/2020 | $94,978.67 |
Community Resources | Construc Costs-Site Improve | A G WASSENAAR INC | MOUNTAIR PARK TESTING | | 3/17/2020 | $822.50 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 3/19/2020 | $106,548.25 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | CO 1 Add'l Work + 28 cal days | | 3/19/2020 | $6,535.00 |
Community Resources | Construc Costs-Site Improve | COLORADO ELECTRIC AND POWER SYSTEMS | Mountair Park: Park | | 3/24/2020 | $9,975.00 |
Community Resources | Construc Costs-Site Improve | MGC INC | Cabnitery Fabrication and | | 3/30/2020 | $14,488.00 |
Community Resources | Construc Costs-Site Improve | CENTURYLINK ASSET ACCOUNTING - BART | BCLP-COMM LINE RELOCATION | | 3/31/2020 | $3,211.03 |